ID |
Date |
Author |
Project |
Subject |
Run Number |
Events |
XYPosition |
Cooling |
Data |
1
|
Tue May 12 10:27:39 2015 |
Benedikt Würkner | SVD3 (H6B) | Setup information | | | | | Unknown |
Information concerning the SVD3 setup during a beam test
In the beam area setup the whole crate and the power supply with the usual spider cable and the two Keithly 2410 high voltage supplies. Monitoring of the 2410 happens via a NI MAX interface that connects to the GPIB-Ethernet interface and needs to be configured there. The IP and password are noted on the device. The software can be found on heros in medialib/LONGTERM/longterm R3.1_doubleSided as a normal *.vi file.
Default adresses 16 and 17 as defined in labview, need to figure out on site which is which, if the voltage selected (e.g. 100V) is applied as +50/-50 or if it is applied as +100/-100 before connecting the cables.
Take a run without dut as well to check the telescope integrity. Without dut in beamline!!!!! |
Attachment 1: spider-config.jpg
|
|
2
|
Wed Jun 3 10:48:42 2015 |
Benedikt Würkner | common | Networking | | | | | Unknown |
WLAN Router:
SSID: Hephy
password: 20supersecret14
DHCP Range: 192.168.0.200 to 239
Netmask: /24
DNS Server: 192.168.0.254
Gateway: 192.168.0.254
external IP: 128.141.174.109 (für diverse Port Forwardings)
Manuell vergebene IP Adressen bitte unbedingt Benni mitteilen oder/und in der folgenden Tabelle eintragen!
IP/MAC Zuweisung:
IP |
Machine/Name |
intern |
Port Forwarding (aussen) |
192.168.0.124 |
SVD Kenwood |
VNC(5900) |
VNC(9000) |
192.168.0.11 |
SVD3 DAQ |
VNC(5900) |
VNC(9001) |
192.168.0.12 |
TUX DAQ |
VNC(5900), VNC(5901), SSH(22) |
VNC(9009), VNC(9002), SSH(9003), |
192.168.0.13 |
Belle XY Tisch |
|
|
192.168.0.14 |
TUXOA |
SSH(22), VNC(5900) |
SSH(9004), VNC(9012) |
192.168.0.20 |
JTAG Server |
|
|
192.168.0.148 |
alixcool |
|
|
192.168.0.16 |
slowcontrol |
VNC(5900) |
VNC(9005) |
192.168.0.144 |
CAEN Power supply |
|
|
192.168.0.17 |
zenpixelwiki |
SSH(22), VNC(5900) |
SSH(9006), VNC(9008) |
192.168.0.18 |
TLU (pcx25042, XY) |
VNC(5900) |
VNC(9007) |
192.168.0.19 |
Cooling control PC |
VNC(5900) |
VNC(9011) |
192.168.0.240 |
NI GPIB - ENET / 1000 |
|
|
192.168.0.150 |
Printserver |
VNC(5900) |
VNC(9010) |
|
|
|
|
137.138.113.254 |
Aida PC |
|
vnc(5900) |
Admin Zugang Wlan Router:
IP: 192.168.0.254
Username: admin
password: Hephy2014
|
3
|
Wed Jun 3 17:23:07 2015 |
Thomas Bergauer | Belle II FADC (H6A) | XY stage positions | | | | | Unknown |
x-Achse: positiv Richtung Saleve (counting room)
y-Achse: positiv Richtung UNTEN!!
position of laddertestbox xy stages:
Rev. Pos (BWD Sensor, BWD, Oben) x= 82.3, y=110.6
Mitte Sensor:
Pos 1: (mitte BWD sensor): x=144.74, y=80.8
Pos 2: (mitte Origami -z): x=269.62, y=80.8
Pos 3: (mitte Origami ce): x=394.42, y=80.8
Pos 4 (mitte FWD Micron Sensor): x=517, y=80.8
Ecke:
Pos 5 (Ecke BWD sensor): x=92.3, y=105.6
Pos 6 (Ecke Origami -z): x=217.18, y=105.6
Pos 7 (Ecke Origami ce): x=342.06, y=105.6
Pos 8 (Ecke FWD sensor): x=467,62, y=56,3
Pos 9 (Ecke FWD sensor): x=568,33 y=64,48 |
Attachment 1: L5_Class_B-.PNG
|
|
4
|
Thu Jun 4 14:15:50 2015 |
Hao Yin | Belle II FADC (H6A) | FIR | 001 | | | | Good |
FIR filer and ADC delay with all sensor and telescope.
telescope n-side switched. |
5
|
Thu Jun 4 14:16:20 2015 |
Hao Yin | Belle II FADC (H6A) | Pedestal | 001 | 10000 | | | Good |
FirRun001, room temp
telescope n-side switched. |
6
|
Thu Jun 4 15:12:41 2015 |
Hao Yin | Belle II FADC (H6A) | Hardware | 001 | 50000 | 1 | No | Good |
PedestalRun001, FIRRun001, room temp
telescope n-side switched.
In order to correct the position change the |
Attachment 1: BW_p-side_001Result.pdf
|
Attachment 2: BW_n-side_001Result.pdf
|
Attachment 3: L6_p-side_001ModProp.pdf
|
Attachment 4: L6_n-side_001ModProp.pdf
|
Attachment 5: L6_p-side_001Result.pdf
|
Attachment 6: L5_p-side_001ModProp.pdf
|
Attachment 7: L6_n-side_001Result.pdf
|
Attachment 8: L5_n-side_001ModProp.pdf
|
Attachment 9: L5_p-side_001Result.pdf
|
Attachment 10: L3_p-side_001ModProp.pdf
|
Attachment 11: L5_n-side_001Result.pdf
|
Attachment 12: L3_p-side_001Result.pdf
|
Attachment 13: L3_n-side_001ModProp.pdf
|
Attachment 14: L3_n-side_001Result.pdf
|
Attachment 15: L4_p-side_001ModProp.pdf
|
Attachment 16: L4_n-side_001ModProp.pdf
|
Attachment 17: L4_p-side_001Result.pdf
|
Attachment 18: L4_n-side_001Result.pdf
|
Attachment 19: BW_p-side_001ModProp.pdf
|
Attachment 20: BW_n-side_001ModProp.pdf
|
7
|
Thu Jun 4 18:44:50 2015 |
Hao Yin | Belle II FADC (H6A) | Hardware | 002 | 50000 | 2 | No | Good |
room temp, FIRRun001, pedestal run 003 |
Attachment 1: -Z_p-side_002ModProp.pdf
|
Attachment 2: -Z_n-side_002ModProp.pdf
|
Attachment 3: -Z_p-side_002Result.pdf
|
Attachment 4: L6_p-side_002ModProp.pdf
|
Attachment 5: -Z_n-side_002Result.pdf
|
Attachment 6: L6_n-side_002ModProp.pdf
|
Attachment 7: L6_p-side_002Result.pdf
|
Attachment 8: L5_p-side_002ModProp.pdf
|
Attachment 9: L6_n-side_002Result.pdf
|
Attachment 10: L5_n-side_002ModProp.pdf
|
Attachment 11: L5_p-side_002Result.pdf
|
Attachment 12: L3_p-side_002ModProp.pdf
|
Attachment 13: L5_n-side_002Result.pdf
|
Attachment 14: L3_n-side_002ModProp.pdf
|
Attachment 15: L3_p-side_002Result.pdf
|
Attachment 16: L3_n-side_002Result.pdf
|
Attachment 17: L4_p-side_002ModProp.pdf
|
Attachment 18: L4_n-side_002ModProp.pdf
|
Attachment 19: L4_p-side_002Result.pdf
|
8
|
Thu Jun 4 18:45:42 2015 |
Hao Yin | Belle II FADC (H6A) | Pedestal | 003 | 10000 | | | Good |
firrun003, room temp
|
9
|
Thu Jun 4 18:49:03 2015 |
Benedikt Würkner | SVD3 (H6B) | Setup | | | | | Unknown |
|
Attachment 1: IMG_20150604_184442.jpg
|
|
Attachment 2: IMG_20150604_184451.jpg
|
|
Attachment 3: IMG_20150604_184516.jpg
|
|
10
|
Thu Jun 4 22:07:16 2015 |
Hao Yin | Belle II FADC (H6A) | Hardware | 003 | 189k | 3 | No | Good |
CE. pedestal run 003. Fir run 002. Room temp |
Attachment 1: CE_p-side_003ModProp.pdf
|
Attachment 2: L4_n-side_002Result.pdf
|
Attachment 3: CE_n-side_003ModProp.pdf
|
Attachment 4: CE_p-side_003Result.pdf
|
Attachment 5: CE_n-side_003Result.pdf
|
Attachment 6: L6_p-side_003ModProp.pdf
|
Attachment 7: L6_n-side_003ModProp.pdf
|
Attachment 8: L6_p-side_003Result.pdf
|
Attachment 9: L6_n-side_003Result.pdf
|
Attachment 10: L5_p-side_003ModProp.pdf
|
Attachment 11: L5_n-side_003ModProp.pdf
|
Attachment 12: L5_p-side_003Result.pdf
|
Attachment 13: L3_p-side_003ModProp.pdf
|
Attachment 14: L5_n-side_003Result.pdf
|
Attachment 15: L3_n-side_003ModProp.pdf
|
Attachment 16: L3_p-side_003Result.pdf
|
Attachment 17: L3_n-side_003Result.pdf
|
Attachment 18: L4_p-side_003ModProp.pdf
|
Attachment 19: L4_n-side_003ModProp.pdf
|
Attachment 20: L4_p-side_003Result.pdf
|
Attachment 21: L4_n-side_003Result.pdf
|
11
|
Fri Jun 5 08:20:27 2015 |
Hao Yin | Belle II FADC (H6A) | Hardware | 004 | 50000 | 4 | No | Good |
room temp, FIRRun002, pedestalrun003, taget FW |
Attachment 1: L6_p-side_004ModProp.pdf
|
Attachment 2: -Z_n-side_004ModProp.pdf
|
Attachment 3: L6_p-side_004Result.pdf
|
Attachment 4: L6_n-side_004ModProp.pdf
|
Attachment 5: L5_p-side_004ModProp.pdf
|
Attachment 6: L6_n-side_004Result.pdf
|
Attachment 7: L5_n-side_004ModProp.pdf
|
Attachment 8: L5_p-side_004Result.pdf
|
Attachment 9: L3_p-side_004ModProp.pdf
|
Attachment 10: L5_n-side_004Result.pdf
|
Attachment 11: L3_n-side_004ModProp.pdf
|
Attachment 12: L3_p-side_004Result.pdf
|
Attachment 13: L3_n-side_004Result.pdf
|
Attachment 14: L4_p-side_004ModProp.pdf
|
Attachment 15: L4_n-side_004ModProp.pdf
|
Attachment 16: L4_p-side_004Result.pdf
|
12
|
Fri Jun 5 12:02:29 2015 |
Hao Yin | Belle II FADC (H6A) | Sixlet Calibration | 001 | | | | Good |
room temp max subevent at 2. with lat = 96 |
13
|
Fri Jun 5 12:03:34 2015 |
Hao Yin | Belle II FADC (H6A) | Sixlet Calibration | 002 | | | | Good |
lat = 97 to a greater range of lat scan |
14
|
Fri Jun 5 19:55:00 2015 |
Hao Yin | Belle II FADC (H6A) | Sixlet Calibration | 003 | | | | Unknown |
lat = 98
room temp
pedestalrun 003 |
15
|
Fri Jun 5 19:59:44 2015 |
Hao Yin | Belle II FADC (H6A) | Pedestal | 004 | 10000 | | | Good |
update pedestal values for room temp sixlet runs.
|
16
|
Fri Jun 5 23:38:51 2015 |
Hao Yin | Belle II FADC (H6A) | Pedestal | 005 | 10000 | | | Unknown |
Readjust after cooling box.
room temp, firrun002
|
17
|
Fri Jun 5 23:39:49 2015 |
Hao Yin | Belle II FADC (H6A) | Hardware | 005 | ~200k | 5 | No | Good |
FIRRun002, pedestalrun005, room temp
Target BW: beam spot at ~ (0 p, 0 n) |
Attachment 1: BW_edge_p-side_005ModProp.pdf
|
Attachment 2: L4_n-side_004Result.pdf
|
Attachment 3: BW_edge_n-side_005ModProp.pdf
|
Attachment 4: BW_edge_p-side_005Result.pdf
|
Attachment 5: BW_edge_n-side_005Result.pdf
|
Attachment 6: L6_p-side_005ModProp.pdf
|
Attachment 7: L6_n-side_005ModProp.pdf
|
Attachment 8: L6_p-side_005Result.pdf
|
Attachment 9: L5_p-side_005ModProp.pdf
|
Attachment 10: L6_n-side_005Result.pdf
|
Attachment 11: L5_n-side_005ModProp.pdf
|
Attachment 12: L5_p-side_005Result.pdf
|
Attachment 13: L3_p-side_005ModProp.pdf
|
Attachment 14: L5_n-side_005Result.pdf
|
Attachment 15: L3_n-side_005ModProp.pdf
|
Attachment 16: L3_p-side_005Result.pdf
|
Attachment 17: L3_n-side_005Result.pdf
|
Attachment 18: L4_p-side_005ModProp.pdf
|
Attachment 19: L4_n-side_005ModProp.pdf
|
Attachment 20: L4_p-side_005Result.pdf
|
Attachment 21: L4_n-side_005Result.pdf
|
18
|
Sat Jun 6 12:43:55 2015 |
Hao Yin | Belle II FADC (H6A) | Hardware | 006 | 50000 | 6 | No | Good |
FIRRun002, room temp, pedestalrun005,
layout: same as HW 005
target: -z, pos 6 (strip: p-0, n-0);
NOTE: results shown in the attachments has been evaluated with cmc containing 128 strip
|
Attachment 1: -Z_edge_p-side_006ModProp.pdf
|
Attachment 2: -Z_edge_n-side_006ModProp.pdf
|
Attachment 3: -Z_edge_p-side_006Result.pdf
|
Attachment 4: L6_p-side_006ModProp.pdf
|
Attachment 5: -Z_edge_n-side_006Result.pdf
|
Attachment 6: L6_n-side_006ModProp.pdf
|
Attachment 7: L6_p-side_006Result.pdf
|
Attachment 8: L5_p-side_006ModProp.pdf
|
Attachment 9: L6_n-side_006Result.pdf
|
Attachment 10: L5_n-side_006ModProp.pdf
|
Attachment 11: L5_p-side_006Result.pdf
|
Attachment 12: L3_p-side_006ModProp.pdf
|
Attachment 13: L5_n-side_006Result.pdf
|
Attachment 14: L3_n-side_006ModProp.pdf
|
Attachment 15: L3_p-side_006Result.pdf
|
Attachment 16: L3_n-side_006Result.pdf
|
Attachment 17: L4_p-side_006ModProp.pdf
|
Attachment 18: L4_n-side_006ModProp.pdf
|
Attachment 19: L4_p-side_006Result.pdf
|
Attachment 20: L4_n-side_006Result.pdf
|
19
|
Sat Jun 6 14:28:28 2015 |
Hao Yin | Belle II FADC (H6A) | Harware | 007 | 50000 | 7 | No | Good |
room temp, FIRRun002, PedestalRun005, room temp
target: CE, pos 7 (p-0, n-0) |
Attachment 1: CE_edge_p-side_007ModProp.pdf
|
Attachment 2: CE_edge_n-side_007ModProp.pdf
|
Attachment 3: CE_edge_p-side_007Result.pdf
|
Attachment 4: CE_edge_n-side_007Result.pdf
|
Attachment 5: L6_p-side_007ModProp.pdf
|
Attachment 6: L6_n-side_007ModProp.pdf
|
Attachment 7: L6_p-side_007Result.pdf
|
Attachment 8: L5_p-side_007ModProp.pdf
|
Attachment 9: L6_n-side_007Result.pdf
|
Attachment 10: L5_n-side_007ModProp.pdf
|
Attachment 11: L5_p-side_007Result.pdf
|
Attachment 12: L3_p-side_007ModProp.pdf
|
Attachment 13: L5_n-side_007Result.pdf
|
Attachment 14: L3_n-side_007ModProp.pdf
|
Attachment 15: L3_p-side_007Result.pdf
|
Attachment 16: L3_n-side_007Result.pdf
|
Attachment 17: L4_p-side_007ModProp.pdf
|
Attachment 18: L4_n-side_007ModProp.pdf
|
Attachment 19: L4_p-side_007Result.pdf
|
Attachment 20: L4_n-side_007Result.pdf
|
20
|
Sat Jun 6 16:14:36 2015 |
Benedikt Würkner | SVD3 (H6B) | calibration run and setup information | cal01 | | | | Unknown |
Calibration Run with +- 50V Bias with higher compliance since the p-side draws more current than expected (23muA by the MAMBO)
|