| ID | Date | Author | Project  | Subject | Run Number | Events | StartTime | EndTime | 
| 58 | Fri Aug 21 22:42:32 2009 | Thomas Bergauer | common | EUDAQ config file used when running with telescope |  |  |  |  | 
| 
  
Used until Friday, 21.08.09:
   AndMask = 0xf # 4x4 mm scintillator for trigger  
Used since Friday, 21.08.09: 
AndMask = 0xc # 9x9 mm scintillator for trigger 
 
 
 
 
Local trigger using TLU only: ALWAYS WITH 9x9mm scintillator | 
| Attachment 1: testfortis_with_eudrb_beam_backpressure_WITH_SILC.conf | 
| [RunControl]
RunSizeLimit = 1800000000
NoTrigWarnTime = 10
[DataCollector]
[LogCollector]
SaveLevel = EXTRA
PrintLevel = INFO
[Producer.TLU]
AndMask = 0xc # 9x9 mm scintillaotr for trigger
#AndMask = 0xf # 4x4 mm scintillator for trigger
OrMask = 0
VetoMask = 0
# EUDRB plugged into DUT#4 , FORTIS plugged into DUT#1, SiLC plugged into DUT#0 
#DutMask = 20 # EUDRB, FORTIS, SiLC in
DutMask = 17 # FORTIS, SiLC in
EnableDUTVeto = 2#0
TriggerInterval = 0
TrigRollover = 0
StrobePeriod = 16000000
StrobeWidth = 480000
[Producer.EUDRB]
Version = 2
Det = MIMOTEL
Mode = ZS
Unsynchronized = 1
AdcDelay = 3
ClkSelect = 2
#Marker1 = 0xff
#Marker2 = 0xff
PostDetResetDelay = 4
PedestalFile = auto
IDOffset = 0
NumBoards = 6
Board0.Slot = 3
Board1.Slot = 5
Board2.Slot = 7
Board3.Slot = 9
Board4.Slot = 11
Board5.Slot = 13
[Producer.FORTIS]
# Need \ not / for directory name with Cygwin...
# ExecutableDirectory = /home/cussans/optodaq/halsall_test_v5/
ExecutableDirectory = /home/cussans/optodaq/MyF11/
# ExecutableDirectory = /home/cussans/optodaq/MyF10/
ExecutableProcessName = optodaqV.exe
#ExecutableFilename = test_run_128_block_mod_C2.bat
ExecutableFilename = test_run_512_128_block_mod_CX.bat
# ExecutableFilename = test_run_512_448_block_mod_full.bat
ExecutableArgs = 
NumRows = 512
NumColumns = 128
 | 
| 65 | Sat Aug 22 11:54:49 2009 | Thomas Bergauer | common | beam profile |  |  |  |  | 
| beam shifted a bit in vertical direction downwards since 21. August 09 evening Beam configuration: Beam configuration file: H6b.802 (FM HAD (P0 off, H8=+180) PARLALLEL IN H6B SILC 2008 | 
| Attachment 1: 20090822_1150_beam_conditions.jpg | 
|  | 
| 71 | Sat Aug 22 15:12:44 2009 | Thomas Bergauer | common | beam profile |  |  |  |  | 
| playing with TRIM4 in vertical plane (setting to 20A current) shifted beamspot back to center position Beam configuration:Beam configuration file: H6b.802 (FM HAD (P0 off, H8=+180) PARLALLEL IN H6B SILC 2008
 
 Rate: 3.35E5 particles/spill (measured with SCINT8 in beamline)
 
 Particle Production Applet
 Calculator applet
 
 For +120 Gev/c beam:
 
 
 
    
        
            | Pi+ | 55.67 % |  
            | p | 38.95 % |  
            | K+ | 5.38 % |  | 
| Attachment 1: 20090822_1511_beam_conditions.jpg | 
|  | 
| 32 | Thu Aug 20 15:50:58 2009 | Manfred Valentan | alignment_laser | slow control: HV graph | all alignemnt_laser runs |  | 20.08.09 10:36 | 4h 43m 52s later | 
| blue graph: h03 white graph: h04 | 
| Attachment 1: slow_control_alignment_sensors.gif | 
|  | 
| 34 | Thu Aug 20 18:56:25 2009 | Christian Irmler | alignment_laser | laser | laser001 | 100000 | 20.08.2009  18:48:53 |  | 
| 2 alignment moduleslocation in beam direction: h04-h03
 laser is shooting on h03 (opposite to the beam)
 
 HV=70V, 40MHz, 6 samplesbeam off
 module 1 (h03) is used w inverter off
 since the signal off the second sensor is only 10 percent, the base line of h03 was increased again (now @ 260 ADC).
 5ns trigger pulse width, 1 kHz trigger,  current_laser=10mA,
 Photodiode: pulse_width=15ns, amplitude=7mV
 bad strips: APV5: 115, APV6: 1 | 
| 35 | Thu Aug 20 19:12:23 2009 | Manfred Valentan | alignment_laser | background mesurement with laser OFF | laser002 | 10000 | 20.08.2009  19:10:09 | 20.08.2009  19:11:57 | 
|  | 
| 36 | Thu Aug 20 19:15:29 2009 | Manfred Valentan | alignment_laser | laser on | laser003 | 10000 | 20.08.2009  19:13:04 | 20.08.2009  19:14:49 | 
| HV=70V, 40MHz, 6 samples, beam off5ns trigger pulse width, 1 kHz trigger,
 current_laser=10mA,
 Photodiode: pulse_width=15ns, amplitude=7mV
 same settings as run laser001 | 
| 37 | Thu Aug 20 19:35:06 2009 | Manfred Valentan | alignment_laser | laser at high intensity (saturation on near sensor, good signal on far sensor) | laser004 | 100000 | 20.08.2009  19:18:47 | 20.08.2009  19:35:05 | 
| HV=70V, 40MHz, 6 samples, beam off5ns trigger pulse width, 1 kHz trigger,
 current_laser=10mA,
 Photodiode: pulse_width=50ns, amplitude=45mV
 laser at high intensity (saturation on near sensor, good signal on far sensor) attached picture shows profile of laser on far sensor creating interferences | 
| Attachment 1: laser_interference.png | 
|  | 
| 38 | Thu Aug 20 19:46:02 2009 | Manfred Valentan | alignment_laser | laser at high intensity, far sensor in 2nd position | laser005 | 50000 | 20.08.2009  19:45:16 | 20.08.2009  19:53:01 | 
| far sensor in 2nd position; laser at high intensity (saturation on near sensor, good signal on far sensor) HV=70V, 40MHz, 6 samples, beam off, far sensor in 2nd position5ns trigger pulse width, 1 kHz trigger,
 current_laser=10mA,
 Photodiode: pulse_width=50ns, amplitude=45mV
   | 
| 39 | Thu Aug 20 19:56:21 2009 | Manfred Valentan | alignment_laser | background mesurement with laser OFF | laser006 | 10k | 20.08.2009  19:54:04 | 20.08.2009  19:55:38 | 
|  | 
| 40 | Thu Aug 20 20:06:06 2009 | Manfred Valentan | alignment_laser | low intensity (like laser001), but far sensor in 2nd position | laser007 | 50k | 20.08.2009  19:57:52 | 20.08.2009  20:05:34 | 
| HV=70V, 40MHz, 6 samples, beam off, far sensor in 2nd position5ns trigger pulse width, 1 kHz trigger,
 current_laser=10mA,
 Photodiode: pulse_width=15ns, amplitude=7mV
 | 
| 23 | Thu Aug 20 10:48:39 2009 | Christian Irmler | alignment_beam | internal calibration | cal002 |  | 20.08.2009  10:49:07 | 20.08.2009  10:59:43 | 
| 2 alignement modules location in beam direction: h04-h03 HV=70V, 40MHz, 1 sampleno beam
 module 1 (h03) is used w inverter off and higher base line | 
| 24 | Thu Aug 20 11:05:26 2009 | Christian Irmler | alignment_beam | pedeatal correction | pedcorr002 |  | 20.08.2009  11:05:41 | 20.08.2009  11:09:35 | 
| 2 alignement modules location in beam direction: h04-h03 HV=70V, 40MHz, 1 sample beam on module 1 (h03) is used w inverter off and higher base line | 
| 25 | Thu Aug 20 11:23:04 2009 | Christian Irmler | alignment_beam | beam in center of sensor w telescope | run004 (6860 telescope) | 10600 | 20.08.2009  11:09:50 | 20.08.2009  11:25:16 | 
| 2 alignement modules location in beam direction: h04-h03 beam in center of sensor HV=70V, 40MHz, 6 samples beam on, 120 GeV module 1 (h03) is used w inverter off and higher base line XY coordinates: X:50 y:141.3 (center- center, point 1) | 
| 26 | Thu Aug 20 11:38:11 2009 | Christian Irmler | alignment_beam | top center, point 7 | run6861 (+6862) | 10600 | 20.08.2009  11:36:35 | 20.08.2009  11:53:51 | 
| 2 alignement modules location in beam direction: h04-h03 beam in center of sensor HV=70V, 40MHz, 6 samples beam on, 120 GeV module 1 (h03) is used w inverter off and higher base line XY coordinates: X:50 y:121.3 (top center, point 7) | 
| 27 | Thu Aug 20 12:18:40 2009 | Christian Irmler | alignment_beam | top left on sensor, point 2 | run6863 (telescope 6864) | 10600 | 20.08.2009  12:07:28 | 20.08.2009  12:25:57 | 
| 2 alignement modules location in beam direction: h04-h03 beam in center of sensor HV=70V, 40MHz, 6 samples beam on, 120 GeV module 1 (h03) is used w inverter off and higher base line XY coordinates: X:57 y:121.3 (top left on sensor in beam direction) | 
| 28 | Thu Aug 20 12:35:13 2009 | Christian Irmler | alignment_beam | top right on sensor, point 3 | run6865 | 10600 | 20.08.2009  12:31:35 | 20.08.2009  12:48:04 | 
| 2 alignement modules location in beam direction: h04-h03 beam in center of sensor HV=70V, 40MHz, 6 samples beam on, 120 GeV module 1 (h03) is used w inverter off and higher base line XY coordinates: X:43 y:121.3 (top right on sensor in beam direction) | 
| 29 | Thu Aug 20 12:50:59 2009 | Christian Irmler | alignment_beam | bottom right on sensor, point 4 | run6866 | 8467 | 20.08.2009  12:51:04 | 20.08.2009  13:05:01 | 
| 2 alignement modules location in beam direction: h04-h03 beam in center of sensor HV=70V, 40MHz, 6 samples beam on, 120 GeV module 1 (h03) is used w inverter off and higher base line XY coordinates: X:43 y:155 (bottom right on sensor in beam direction) | 
| 30 | Thu Aug 20 14:31:29 2009 | Christian Irmler | alignment_beam | bottom left on sensor, point 5 | run6868 | 10600 | 20.08.2009  14:36:00 | 20.08.2009  14:51:57 | 
| 2 alignment modules location in beam direction: h04-h03 beam in center of sensor HV=70V, 40MHz, 6 samples beam on, 120 GeV module 1 (h03) is used w inverter off and higher base line XY coordinates: X:57 y:155 (bottom left on sensor in beam direction) | 
| 31 | Thu Aug 20 15:15:33 2009 | Christian Irmler | alignment_beam | bottom center on sensor, point 6 | run6869 | 615 (beam manipulation by students) | 20.08.2009  14:56:16 | 20.08.2009  15:14:11 | 
| 2 alignment modules location in beam direction: h04-h03 beam in center of sensor HV=70V, 40MHz, 6 samples beam on, 120 GeV module 1 (h03) is used w inverter off and higher base line XY coordinates: X:50 y:155 (bottom center on sensor in beam direction) | 
| 1 | Mon Jul  6 12:22:47 2009 | Stephan Hänsel | SiLC | Measurements - hybrids with APV |  |  |  |  | 
| Pt Modules:    Optical Modules:   ITE Modules:  | 
| 2 | Mon Jul  6 12:24:53 2009 | Stephan Hänsel | SiLC | Module Drawings |  |  |  |  | 
|  Pt Modules:    Optical Modules:   ITE Modules: :   | 
| 5 | Mon Jul  6 12:29:20 2009 | Stephan Hänsel | SiLC | Sensors - layout |  |  |  |  | 
|  Pt Modules:  CMS OB1 Sensors:    Optical Modules:  Sensors:     ITE Modules:  | 
| Attachment 1: Wafer-Screenshot.png | 
|  | 
| 7 | Mon Jul  6 16:22:36 2009 | Stephan Hänsel | SiLC | Measurements - Sensors |  |  |  |  | 
|  Pt Modules:    Optical Modules:    ITE Modules:      | 
| 8 | Mon Jul  6 16:23:51 2009 | Stephan Hänsel | SiLC | Module Components |  |  |  |  | 
|  Pt Modules:  Pt-1:
 hybrid:  h01-4APV
 bottom sensor:  30210331516116
 top sensor: 30210332911309
 
 Pt-2:
 hybrid:  h02-4APV
 bottom sensor:  30210331415917
 top sensor:  30210314845402
    Optical Modules:  Opt_AC-Test-1:
 hybrid:  h21-2APV
 sensor:  HPK-ILC-TS-SPL-6687-05
 
 Opt_AC-Test-2:
 hybrid:  h22-2APV
 sensor:  HPK-ILC-TS-SPL-6687-07
 modules with SiLC alignment sensors:
 Opt-1:
 hybrid: h03
 sensor: HPK-SPL-6686-03
 
 Opt-2:
 hybrid: h04
 sensor: HPK-SPL-6686-07
   ITE Modules:  | 
| 9 | Thu Jul  9 10:29:58 2009 | Stephan Hänsel | SiLC | Measurements - Modules |  |  |  |  | 
|  Pt Modules:  - Sensoren sind Luftfeuhtigkeitsempfindlich - die Sensoren brauchen einige Zeit unter Spannung bis sie sich bei einem akzeptablen Strom stabilisieren  small Problems:   Optical Modules:  small Problems with h03-Module: ITE Modules:    | 
| 17 | Wed Aug 19 15:41:17 2009 | Wolfgang Kiesenhofer | SiLC | angle scan templates |  |  |  |  | 
| Linie am rechten Seitenrand (in der Vorschau unten leider nicht gut zu sehen) sollte mit dem rechten Rand der Basisplatte abschließen (bezogen auf die Beam Richtung). | 
| Attachment 1: angle_scan0.pdf | 
| Attachment 2: angle_scan5.pdf | 
| Attachment 3: angle_scan10.pdf | 
| Attachment 4: angle_scan15.pdf | 
| Attachment 5: angle_scan20.pdf | 
| Attachment 6: angle_scan25.pdf | 
| Attachment 7: angle_scan30.pdf | 
| Attachment 8: angle_scan35.pdf | 
| Attachment 9: angle_scan40.pdf | 
| Attachment 10: angle_scan45.pdf | 
| Attachment 11: angle_scan50.pdf | 
| Attachment 12: angle_scan55.pdf | 
| Attachment 13: angle_scan60.pdf | 
| 14 | Fri Aug 14 19:35:43 2009 | Thomas Bergauer | Pt_ITE512 | intcal |  |  |  |  | 
| HV=100V except h05-ITE-512 and h06-ITE-512 (runaway, HV off) h01-Pt: 10uA h02-Pt: 1.6uA 3 SiLC DUTs mit je ca. 38nA h07-ITE-512: 3.77uA h05-ITE-512: breakthrough h06-ITE-512: breakthrough | 
| 67 | Sat Aug 22 13:28:53 2009 | Wolfgang Kiesenhofer | Pt_ITE512 | runlist for pt-module angle-scan |  |  |  |  | 
| Preliminary run list for pt-modules + ite512 + silc1, silc2, silc5, silc6 
    
        
            | run | angle[deg] | pos | height (xy-table) | importance | events |  
            | 1 | 1 | center module |  | + | 10k |  
            | 2 | 2 | center module |  | + | 10k |  
            | 3 | 3 | center module |  | + | 10k |  
            | 4 | 4 | center module |  | + | 10k |  
            | 5 | 5 | center module |  | + | 10k |  
            | 6 | 6 | center module |  | + | 10k |  
            | 7 | 7 | center module |  | + | 10k |  
            | 8 | 8 | center module |  | + | 10k |  
            | 9 | 9 | center module |  | + | 10k |  
            | 10 | 10 | center module |  | + | 10k |  
            | 11 | 12 | center module |  | + | 10k |  
            | 12 | 14 | center module |  | - | 10k |  
            | 13 | 16 | center module |  | - | 10k |  
            | 14 | 0 | center module |  | + | ? depends on ite512 |  
            | 15 | 0 | upper pos |  | + | 10k |  
            | 16 | 0 | lower pos |  | + | 10k |    | 
| 80 | Sun Aug 23 13:15:42 2009 | Marko Dragicevic | Pt_ITE512 | Current and Humindity during first Run |  |  |  |  | 
| Current of Pt modules during first runData of the run was dicarded. Compressed air flow was at ~2 bars during run. Graph shows RH rise after switching of CA flow. Restarted at around 7% with very low pressure. Timescales for RH and I graph are different!!! after 3 hours first bottle of compressed air (dewpoint -170 degree C) is gone and sensor Pt-h01 starts to fluctuate again   Current of ITE512 plus 2 SiLC08 modulesHV=70V, Current: 25uA first, 29uA then, 35uA latest. now stable   | 
| Attachment 1: IandRH_first_Pt_run.png | 
|  | 
| Attachment 2: Picture_1.png | 
|  | 
| 81 | Sun Aug 23 14:03:14 2009 | Manfred Valentan | Pt_ITE512 | Pt & ITE512 center position, 1 deg | run024 | 20000 | 23.08.2009 13:59:06 |  | 
| Pt: 1 Grad, HV=200V, 0% RHITE512: HV=70V
 X-Y-Table: x=99.6, y=36
 Telescope: run7316
 | 
| 82 | Sun Aug 23 17:18:25 2009 | Christian Irmler | Pt_ITE512 | pedestal correction | pedcorr008 |  | 23.08.2009  17:17:36 |  | 
| Pt: 1 Grad, HV=200V, 0% RH, intcal, beam offITE512: HV=70V,
 X-Y-Table: x=99.6, y=36
 | 
| 83 | Sun Aug 23 17:19:50 2009 | Christian Irmler | Pt_ITE512 | internal calibration | cal011 |  | 23.08.2009  16:30:43 | 23.08.2009  17:02:14 | 
| Pt: 1 Grad, HV=200V, 0% RH, intcal, beam offITE512: HV=70V,
 X-Y-Table: x=99.6, y=36
 | 
| 85 | Mon Aug 24 11:58:23 2009 | Georg Auzinger | Pt_ITE512 | Pt_ITE512 1deg air | run025 | 20k | 24.08.09 11:24:33 | 24.08.09 12:40:25 | 
| Pt: 1 Grad, HV=200V, 0% RH, beam on, 120GeV ITE512: HV=70V, X-Y-Table: x=99.6, y=36 | 
| 86 | Mon Aug 24 13:01:14 2009 | Georg Auzinger | Pt_ITE512 | Pt_ITE512 3deg air | run026 | 20k | 24.08.09 11:24:33 | 24.08.2009  14:11:45 | 
| Pt: 3 Grad, HV=200V, 0% RH, beam on, 120GeV ITE512: HV=70V, X-Y-Table: x=99.6, y=36 | 
| 87 | Mon Aug 24 14:23:01 2009 | Georg Auzinger | Pt_ITE512 | Pt_ITE512 5deg air | run027 | 20k | 24.08.2009  14:27:07 | 24.08.2009  15:26:20 | 
| Pt: 5 Grad, HV=200V, 0% RH, beam on, 120GeV ITE512: HV=70V, X-Y-Table: x=99.6, y=36 | 
| 88 | Mon Aug 24 15:28:49 2009 | Georg Auzinger | Pt_ITE512 | Pt_ITE512 7deg air | run028 | 20k | 24.08.09 15:39:50 | 24.08.09 16:40:54 | 
| Pt: 7 Grad, HV=200V, 0% RH, beam on, 120GeV ITE512: HV=70V, X-Y-Table: x=99.6, y=36 | 
| 89 | Mon Aug 24 16:44:36 2009 | Georg Auzinger | Pt_ITE512 | Pt_ITE512 9deg air | run029 | 20k | 24.08.09 17:03:21 | 24.08.09 18:20:55 | 
| Pt: 9 Grad, HV=200V, 0% RH, beam on, 120GeV ITE512: HV=70V, X-Y-Table: x=99.6, y=36 | 
| 90 | Mon Aug 24 18:30:07 2009 | Georg Auzinger | Pt_ITE512 | Pt_ITE512 11deg air | run030 | 20k | 24.08.09 18:45:09 | 24.08.09  20:37:04 | 
| Pt: 11 Grad, HV=200V, 0% RH, beam on, 120GeV ITE512: HV=70V, X-Y-Table: x=99.6, y=36 | 
| 91 | Mon Aug 24 22:04:56 2009 | Georg Auzinger | Pt_ITE512 | Pt_ITE512 13deg air | run031 | 20k | 24.08.09 20:53:50 | 24.08.09 22:00:49 | 
| Pt: 13 Grad, HV=200V, 0% RH, beam on, 120GeV ITE512: HV=70V, X-Y-Table: x=99.6, y=36 | 
| 92 | Mon Aug 24 22:12:22 2009 | Georg Auzinger | Pt_ITE512 | Pt_ITE512 15deg air | run032 | 19456 | 24.08.09 22:18:08 | 24.08.09 23:25:52 | 
| Pt: 15 Grad, HV=200V, 0% RH, beam on, 120GeV ITE512: HV=70V, X-Y-Table: x=99.6, y=36   no beam --> run stopped after 19456 events | 
| 93 | Tue Aug 25 01:33:18 2009 | Georg Auzinger | Pt_ITE512 | Pt_ITE512 0deg air | run033 | 151724 | 25.08.09 01:35:18 | 25.08.2009  08:44:27 | 
| Pt: 0 Grad, HV=200V, 0% RH, beam on, 120GeV ITE512: HV=70V, X-Y-Table: x=99.6, y=36 | 
| 95 | Tue Aug 25 09:01:12 2009 | Marko Dragicevic | Pt_ITE512 | Pt_ITE512 2deg air | run034 | 20k | 25.08.09 08:56:18 | 25.08.09 09:45: | 
| Pt: 2 Grad, HV=200V, 0% RH, beam on, 120GeV ITE512: HV=70V, X-Y-Table: x=99.6, y=36 | 
| 96 | Tue Aug 25 09:53:16 2009 | Marko Dragicevic | Pt_ITE512 | Pt_ITE512 4deg  NO air! | run035 | 20k | 25.08.2009  09:50 | 25.08.2009  11:00 | 
| Pt: 4 Grad, HV=200V, 0% (start run) to 14% (end run) RH, beam on, 120GeV ITE512: HV=70V, X-Y-Table: x=99.6, y=36 | 
| 97 | Tue Aug 25 11:26:23 2009 | Thomas Bergauer | Pt_ITE512 | Pt_ITE512 6deg NO air! | run036 | 20k | 25.08.2009 11:25 | 25.08.2009  12:19:55 | 
| Pt: 6 Grad, HV=200V, 20% (start run) to % (end run) RH, beam on, 120GeV ITE512: HV=70V, X-Y-Table: x=99.6, y=36 MOEGLICHERWEISE WAR EIN MODUL AUF 8 GRAD | 
| 98 | Tue Aug 25 12:30:04 2009 | Marko Dragicevic | Pt_ITE512 | Pt_ITE512 8deg  NO air! | run037 | 20k | 25.08.2009  12:45 | 25.08.2009  13:40:13 | 
| Pt: 8 Grad, HV=200V, 28% (start run) to 31% (end run) RH, beam on, 120GeV ITE512: HV=70V, I=49.1muA X-Y-Table: x=99.6, y=36 | 
| 99 | Tue Aug 25 13:48:30 2009 | Marko Dragicevic | Pt_ITE512 | Pt_ITE512 10deg  NO air! | run038 | 20k | 25.08.2009  13:54:54 | 25.08.2009  15:22:38 | 
| Pt: 10 Grad, HV=200V, 31.7% (start run) to 33.8% (end run) RH, beam on, 120GeV ITE512: HV=70V, I=50muA X-Y-Table: x=99.6, y=36 | 
| 100 | Tue Aug 25 15:33:07 2009 | Marko Dragicevic | Pt_ITE512 | Pt_ITE512 12deg NO air! | run039 | 20k | 25.08.2009 15:35 | 25.08.2009 17:10 | 
| Pt: 12 Grad, HV=200V, 34.4% (start run) to 36.1% (end run) RH, beam on, 120GeV ITE512: HV=70V, I=50muA X-Y-Table: x=99.6, y=36 | 
| 101 | Tue Aug 25 17:14:52 2009 | Marko Dragicevic | Pt_ITE512 | Pt_ITE512 17deg NO air! | run040 | 20k | 25.08.2009  17:17:11 | 25.08.2009  18:08:57 | 
| Pt: 17 Grad, HV=200V, 36.5% (start run) to xx.1% (end run) RH, beam on, 120GeV ITE512: HV=70V, I=51muA X-Y-Table: x=99.6, y=36 | 
| Attachment 1: Pt-17deg.png | 
|  | 
| 102 | Tue Aug 25 18:22:25 2009 | Manfred Valentan | Pt_ITE512 | Pt_ITE512 40deg NO air! (for calibration) | run041 | 10k | 25.08.2009 18:20:30 | 25.08.2009 | 
| Pt: 40 Grad, HV=200V, 36.9% (start run) to xx% (end run) RH, beam on, 120GeV ITE512: HV=70V, I=51muA X-Y-Table: x=99.6, y=36 | 
| 16 | Wed Aug 19 15:37:37 2009 | Christian Irmler | ITE128 | internal calibration | cal001 |  | 15:31:29 |  | 
| 8 modules, HV=70V, 40MHz, 1 sampleno beam
 APV 4,5: inverter off, higher baseline = PAD modules | 
| 18 | Wed Aug 19 20:43:14 2009 | Christian Irmler | ITE128 | ITE128 shooting into strips w/o pitch adapter, low position | run001 | 100600 | 19.08.2009  20:42:08 | 19.08.2009  22:54:21 | 
| DUT: SiLC 08_1, 6 x ITE128, SiLC 08_2HV = 70V, 40MHz, 120 GeV
 TLU trigger, w/o telescope
 9x9 mm beam spot
 height (y) = 154.0979 ITE128 shooting into strips w/o pitch adapter, low position | 
| 19 | Wed Aug 19 22:56:07 2009 | Christian Irmler | ITE128 | ITE128 shooting into strips w pitch adapter, upper position | run002 | 100600 | 19.08.2009  22:54:23 | 20.08.2009  00:11:31 | 
| DUT: SiLC 08_1, 6 x ITE128, SiLC 08_2HV = 70V, 40MHz, 120 GeV
 TLU trigger, w/o telescope
 9x9 mm beam spot
 height (y) = 144.3099 ITE128 shooting into strips w pitch adapter, upper position | 
| 21 | Thu Aug 20 00:16:45 2009 | Christian Irmler | ITE128 | pedestal correction | pedcorr001 |  | 20.08.2009  00:14:21 | 20.08.2009  00:24:28 | 
| DUT: SiLC 08_1, 6 x ITE128, SiLC 08_2HV = 70V, 40MHz
 pedestal correction beam on   | 
| 22 | Thu Aug 20 00:31:45 2009 | Christian Irmler | ITE128 | ITE128 shooting into strips w pitch adapter, upper position | run003 | 100600 | 20.08.2009  00:27:36 |  | 
| DUT: SiLC 08_1, 6 x ITE128, SiLC 08_2HV = 70V, 40MHz, 120 GeV
 TLU trigger, w/o telescope
 9x9 mm beam spot
 height (y) = 139.3100 ITE128 shooting into strips w pitch adapter, upper edge of sensor | 
| 77 | Sun Aug 23 01:46:03 2009 | Thomas Bergauer | ITE128 | 2nd run with ITE128: central position | run021 | 100k | 23.08.09 00:10 (ca.) | 23.08.2009  02:15:10 | 
| ITE128 HV = 70V, 40MHz, 120 GeV TLU trigger w telescope  XY-Table: x=48, y=115.31 new beam position (used TRIM4 magnet at 7A): y down by 2mm. see attached picture | 
| Attachment 1: Picture_1.png | 
|  | 
| 78 | Sun Aug 23 02:18:20 2009 | Thomas Bergauer | ITE128 | 2nd run with ITE128: top position (3mm below center); during night | run022 | 407895 | 23.08.2009  02:16:21 | 23.08.2009  08:04:09 | 
| ITE128 HV = 70V, 40MHz, 120 GeV TLU trigger w telescope  XY-Table: x=48, y=112.31 | 
| Attachment 1: Picture_1.png | 
|  | 
| 79 | Sun Aug 23 08:13:31 2009 | Thomas Bergauer | ITE128 | 2nd run with ITE128: top position (4mm below center) | run023 | 100k | 23.08.2009  08:06:58 | 23.08.2009  09:30:53 | 
| ITE128 HV = 70V, 40MHz, 120 GeV TLU trigger w telescope  XY-Table: x=48, y=111.31 | 
| 106 | Wed Aug 26 14:26:13 2009 | Wolfgang Kiesenhofer | ITE128 | S/N final Single-Metal | run001 & run002 |  |  |  | 
| Most probable S/N, Single Metal Layer, 2D histogram fitted with langau in 5 bin (strips) slices. | 
| Attachment 1: sn-pos_h13-h14_strips_pa_5bins.pdf | 
| 107 | Wed Sep  2 14:15:17 2009 | Wolfgang Kiesenhofer | ITE128 | ITE 128 Cross-Talk | run002 |  |  |  | 
| Preliminary strip correlation (Kendalls Tau) for threshold = 3*stripnoise. | 
| Attachment 1: stripcorr_modall_thrs3_ktau.pdf | 
| 33 | Thu Aug 20 15:54:45 2009 | Manfred Valentan | BELLE | temp/humidty logger data |  |  |  |  | 
| position: underneath telescope. dewpoint ~ 15 degree test with chiller: running 4 hours at 15 degress: NO condensation on alu pipe | 
| Attachment 1: easylog_under_telescope.gif | 
|  | 
| 41 | Fri Aug 21 06:16:15 2009 | Christian Irmler | BELLE | internal calibration 40 MHz transparent mode | cal003 |  | 20.08.2009  23:27:12 | 21.08.2009  00:05:16 | 
| Belle DUT, intcalHV=80V, 40 MHz, no beam
 transparent mode | 
| 42 | Fri Aug 21 06:24:10 2009 | Christian Irmler | BELLE | APVDAQ + telescope (beam alignement) | run6872 | 5785 | 21.08.2009  00:12:26 | 21.08.2009  00:27:11 | 
| 4 Belle DUTsHV=80V, 40 MHz, 6 sample, 120 GeV
 
 beam alignementOrigami is hit between in center of sensor (APV 1 and 2 on both sides)
 | 
| 43 | Fri Aug 21 06:31:29 2009 | Christian Irmler | BELLE | APVDAQ + telescope | run6873 | 80173 | 21.08.2009  00:47:38 | 21.08.2009  06:07:02 | 
| 4 Belle DUTsHV=80V, 40 MHz, 6 sample, 120 GeV
 
 beam position:  p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors)
 JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped) run interrupted after 80173 --> bad timing, peak was at 4 th or 5 th sample | 
| 44 | Fri Aug 21 06:34:39 2009 | Christian Irmler | BELLE | APVDAQ + telescope 40 MHz | run005 | 75000 | 21.08.2009  06:10:41 | 21.08.2009  10:37:33 | 
| was originally  run004, renamed after run was stopped to avoid duplicate names4 Belle DUTs
 HV=80V, 40 MHz, 6 sample, 120 GeV
 beam position:  p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors)
 table position y (height):  94.3
 JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped) same as run6873, but w improved timing  --> peak is now at sample 2 or 3 since eudetmac was not reachable by VNC, the telescope has not been restarted !   | 
| 45 | Fri Aug 21 12:05:31 2009 | Christian Irmler | BELLE | APVDAQ  standalone 40 MHz hit mode | run006 | interrupted | 21.08.2009  10:41:51 | 21.08.2009  10:54:37 | 
| 4 Belle DUTsHV=80V, 40 MHz, 6 sample, 120 GeV
 
 beam position:  p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors)
 table position y (height):  94.3
 zero supressed w/o bad strip definition of origami module JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped)     | 
| 46 | Fri Aug 21 12:06:06 2009 | Christian Irmler | BELLE | APVDAQ  standalone 40 MHz | run007 | interrupted | 21.08.2009  11:06:45 | 21.08.2009  11:10:40 | 
| 4 Belle DUTsHV=80V, 40 MHz, 6 sample, 120 GeV
 
 beam position:  p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors)
 JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped) zero supressed w bad strip definition of origami module, but reverse readout order of APV 2 and 3 on p-side | 
| 47 | Fri Aug 21 12:06:29 2009 | Christian Irmler | BELLE | APVDAQ  standalone hit mode 40 MHz | run008 | 75000 | 21.08.2009  11:15:09 | 21.08.2009  11:29:53 | 
| 4 Belle DUTsHV=80V, 40 MHz, 6 sample, 120 GeV
 
 beam position:  p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors)
 JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped) same as run6873, but w improved timing  --> peak is now at sample 2 or 3 since eudetmac was not reachable by VNC, the telescope has not been restarted !   zero supressed w bad strip definition of origami module, but natural readout order of APV 2 and 3 on p-side hit cut = 4 | 
| 48 | Fri Aug 21 12:06:39 2009 | Christian Irmler | BELLE | APVDAQ  standalone hit mode 40 MHz | run009 | 75000 | 21.08.2009  11:48:22 | 21.08.2009  12:01:53 | 
| 4 Belle DUTsHV=80V, 40 MHz, 6 sample, 120 GeV
 
 beam position:  p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors)
 JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped) same as run6873, but w improved timing  --> peak is now at sample 2 or 3 since eudetmac was not reachable by VNC, the telescope has not been restarted !   zero supressed w bad strip definition of origami module, but natural readout order of APV 2 and 3 on p-side hit cut = 5 | 
| 49 | Fri Aug 21 12:08:44 2009 | Christian Irmler | BELLE | APVDAQ  standalone 40 MHz | pedcorr003 |  | 21.08.2009  12:08:33 | 21.08.2009  12:18:45 | 
| 4 Belle DUTsHV=80V, 40 MHz
 pedestal correction
 beam position:  p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors)
 
 | 
| 50 | Fri Aug 21 12:22:43 2009 | Christian Irmler | BELLE | APVDAQ  standalone 31.8 MHz hit mode | run010 | 75000 | 21.08.2009  12:53:02 | 21.08.2009  13:35:01 | 
| 4 Belle DUTsHV=80V, 31.8 MHz, 6 sample, 120 GeV
 switched to external clock source
 processed mode, hit cut = 4
 beam position:  p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors)
 JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped) | 
| 51 | Fri Aug 21 13:38:20 2009 | Christian Irmler | BELLE | APVDAQ  standalone 31.8 MHz hit mode | run011 | 75000 | 21.08.2009  13:35:25 |  | 
| 4 Belle DUTsHV=80V, 31.8 MHz, 6 sample, 120 GeV
 external clock source
 processed mode, hit cut = 5
 beam position:  p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors)
 JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped) | 
| 52 | Fri Aug 21 14:18:11 2009 | Christian Irmler | BELLE | internal calibration 31.8 MHz transparent mode | cal004 |  | 21.08.2009  14:21:40 | 21.08.2009  15:01:24 | 
| Belle DUT, intcalHV=80V, 31.8 MHz, no beam
 transparent mode
 Origami p-side APV 2&3 with reverse readout order | 
| 53 | Fri Aug 21 15:27:08 2009 | Christian Irmler | BELLE | internal calibration 31.8 MHz hit mode | cal005 |  | 21.08.2009  15:34:43 | 21.08.2009  16:29:47 | 
| Belle DUT, intcalHV=80V, 31.8 MHz, no beam
 hit mode
 Origami p-side APV 2&3 with reverse readout order | 
| 54 | Fri Aug 21 16:37:22 2009 | Christian Irmler | BELLE | internal calibration 40 MHz hit mode | cal006 |  | 21.08.2009  16:30:33 |  | 
| Belle DUT, intcalHV=80V, 40 MHz, no beam
 hit mode
 switched back to internal 40 MHz clock | 
| 56 | Fri Aug 21 18:07:57 2009 | Christian Irmler | BELLE | APVDAQ  standalone 31.8 MHz | pedcorr004 |  | 21.08.2009  17:49:10 | 21.08.2009  18:24:31 | 
| 4 Belle DUTsHV=80V, 31.8 MHz
 pedestal correction
 transparent mode
 beam on
 
 | 
| 57 | Fri Aug 21 18:35:13 2009 | Christian Irmler | BELLE | APVDAQ  + telescope 31.8 MHz transparent mode | run012 | 60000 | 21.08.2009  18:31:01 | 21.08.2009  23:25:03 | 
| 4 Belle DUTsHV=80V, 31.8 MHz, 6 sample, 120 GeV
 external clock source
 transparent mode
 beam position:  p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors), beam spot: 9x9 mm
 JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped) APVDAQ and telescope runs are not synchronized | 
| 59 | Sat Aug 22 01:06:34 2009 | Christian Irmler | BELLE | APVDAQ + telescope 40 MHz transparent mode (cooling?) | run013 | 75000 | 21.08.2009  23:49:38 | 22.08.2009  03:21:48 | 
| Belle DUT, tranparent modeHV=80V, 40 MHz, beam on, 120 GeV
 6 samples
 chiller set to 13 deg.
 beam position:  p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors), beam spot: 9x9 mmJP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped)
 APVDAQ and telescope runs are not synchronized trigger rate: about 300 - 500 ev / spill there was probably no water flow throught the pipe of the origami module during this run --> must be repeated | 
| 60 | Sat Aug 22 03:27:13 2009 | Thomas Bergauer | BELLE | APVDAQ + telescope 31,8 MHz transparent mode (cooling?) | run014 | 75k | 22.08.2009  03:25:23 | 22.08.2009  07:08:09 | 
|  HV=80V, 31.8 MHz, beam on, 120 GeV 6 samples chiller set to 13 deg.   
f=31.8 MHz config file: cern09_belle_31.8mhz_multi6.cfg   there was probably no water flow throught the pipe of the origami module during this run --> must be repeated | 
| 61 | Sat Aug 22 08:32:02 2009 | Thomas Bergauer | BELLE | APVDAQ + telescope 31,8 MHz hit mode (cooling?) | run015 | 75k | 22.08.2009  08:15:05 | 22.08.2009  09:25:21 | 
|  HV=80V, 31.8 MHz, beam on, 120 GeV 6 samples, hit mode, hitcut=4 chiller set to 13 deg.   
f=31.8 MHz config file: cern09_belle_31.8mhz_hit_multi6.cfg   there was probably no water flow throught the pipe of the origami module during this run --> must be repeated | 
| 62 | Sat Aug 22 09:44:50 2009 | Thomas Bergauer | BELLE | APVDAQ + telescope 31,8 MHz hit mode (cooling?) | run016 | 75k | 22.08.2009  09:42:38 | 22.08.2009  10:24:05 | 
|  HV=80V, 31.8 MHz, beam on, 120 GeV 6 samples, hit mode, hitcut=5 chiller set to 13 deg.   
f=31.8 MHz config file: cern09_belle_31.8mhz_hit_cut5_multi6.cfg   there was probably no water flow throught the pipe of the origami module during this run! | 
| 63 | Sat Aug 22 10:28:50 2009 | Thomas Bergauer | BELLE | APVDAQ + telescope 40 MHz hit mode (cooling?) | run017 | 75k | 22.08.2009  10:26:28 | 22.08.2009  11:16:12 | 
|  HV=80V, 40 MHz, beam on, 120 GeV 6 samples, hit mode, hitcut=4 chiller set to 13 deg.   
f=40 MHz config file: cern09_belle_hit_multi6.cfg   there was probably no water flow throught the pipe of the origami module during this run! | 
| 64 | Sat Aug 22 11:26:00 2009 | Thomas Bergauer | BELLE | APVDAQ + telescope 40 MHz hit mode (cooling?) | run018 | 75k | 22.08.2009  11:16:57 | 22.08.2009  11:58:56 | 
|  HV=80V, 40 MHz, beam on, 120 GeV 6 samples, hit mode, hitcut=5 chiller set to 13 deg.   
f=40 MHz config file: cern09_belle_hit_cut5_multi6.cfg   trigger rate about 3500 ev / spill   there was probably no water flow throught the pipe of the origami module during this run! | 
| 66 | Sat Aug 22 12:12:34 2009 | Christian Irmler | BELLE | internal calibration 40 MHz  transparent mode (cooling?) | cal007 |  | 22.08.2009  12:10:32 | 22.08.2009  12:49:09 | 
| Belle DUT, intcalHV=80V, 40 MHz, beam off
 1 sample, transparent mode
 chiller set to 13 deg.
 external 40 MHz clock there was probably no water flow throught the pipe of the origami module during this run --> must be repeated | 
| 68 | Sat Aug 22 13:30:28 2009 | Christian Irmler | BELLE | internal calibration 31.8 MHz  transparent mode (cooling?) | cal008 |  | 22.08.2009  12:50:48 | 22.08.2009  13:29:25 | 
| Belle DUT, intcalHV=80V, 31.8 MHz, beam off
 1 sample, transparent mode
 chiller set to 13 deg.
 external 31.8 MHz clock there was probably no water flow throught the pipe of the origami module during this run --> must be repeated | 
| 69 | Sat Aug 22 13:34:14 2009 | Christian Irmler | BELLE | pedestal correction 31.8 MHz  transparent mode (cooling?) | pedcorr005 |  | 22.08.2009  13:31:27 | 22.08.2009  13:41:42 | 
| Belle DUT, intcalHV=80V, 31.8 MHz, beam off
 1 sample, transparent mode
 chiller set to 13 deg.
 external 31.8 MHz clock
 there was probably no water flow throught the pipe of the origami module during this run --> must be repeated! | 
| 70 | Sat Aug 22 14:46:12 2009 | Christian Irmler | BELLE | internal calibration 31.8 MHz  transparent mode + cooling | cal009 |  | 22.08.2009  14:43:55 | 22.08.2009  15:22:37 | 
| Belle DUT, intcalHV=80V, 31.8 MHz, beam off
 1 sample, transparent mode
 cooling
 chiller set to 13 deg.
 Since there was no (or to less) water flow through the small pipe of the origami module, all previous runs with cooling must be repeated. Bypass removed to achieve better watter flow at the module!Chiller pump is set to 2800 rpm
 | 
| 72 | Sat Aug 22 15:28:00 2009 | Christian Irmler | BELLE | pedestal correction 31.8 MHz  transparent mode + cooling | pedcorr006 |  | 22.08.2009  15:25:35 | 22.08.2009  15:36:00 | 
| Belle DUT, HV=80V, 31.8 MHz, beam off1 sample, transparent mode
 pedestal correction
 chiller set to 13 deg, 2900 rpm | 
| 73 | Sat Aug 22 15:52:33 2009 | Christian Irmler | BELLE | APVDAQ + telescope 31.8 MHz transparent mode + cooling | run019 | 75k | 22.08.2009  15:50:40 | 22.08.2009  19:14:21 | 
| Belle DUT, HV=80V, 31.8 MHz, 120 GeV6 samples, transparent mode
 chiller set to 13 deg,  2900 rpm
 
 water flow checked befor start of run
 | 
| 74 | Sat Aug 22 19:19:20 2009 | Christian Irmler | BELLE | APVDAQ + telescope 40 MHz transparent mode + cooling | run020 | 75k | 22.08.2009  19:17:29 | 22.08.2009  22:09:53 | 
| Belle DUT, HV=80V, 40 MHz, 120 GeV6 samples, transparent mode
 chiller set to 13 deg,  2900 rpm
 
 water flow checked befor start of run
 | 
| 75 | Sat Aug 22 22:14:50 2009 | Christian Irmler | BELLE | internal calibration 40 MHz  transparent mode + cooling | cal010 |  | 22.08.2009  22:24:22 |  | 
| Belle DUT, intcalHV=80V, 40 MHz, beam off
 1 sample, transparent mode
 external clock
 cooling
 chiller set to 13 deg.
 Bypass removed to achieve better watter flow at the module!Chiller pump is set to 2800 rpm
 | 
| 76 | Sat Aug 22 23:06:22 2009 | Christian Irmler | BELLE | pedestal correction 40 MHz  transparent mode + cooling | pedcorr007 |  | 22.08.2009  23:04:29 | 22.08.2009  23:13:51 | 
| Belle DUT, HV=80V, 40 MHz, beam off1 sample, transparent mode
 pedestal correction
 chiller set to 13 deg, 2900 rpm | 
| 103 | Tue Aug 25 20:21:31 2009 | Christian Irmler | BELLE | APVDAQ + telescope 40 MHz transparent mode | run042 | 85189 | 25.08.2009  20:18:18 | 26.08.2009  01:27:12 | 
| Belle DUT, HV=80V,  40 MHz, 120 GeV6 samples, transparent mode
 no cooling
 after realignement of modules
 new beam spot:
 
 
    
        
            | APV # 
 | n-side 
 | p-side 
 |  
            | JP 
 | 1/2 
 | 1/2 
 |  
            | Origami 
 | 2/3 
 | 1/2 |  
            | Flex 
 | 1/2 
 | 1/2 |  
            | Micron 
 | 0/1 
 | 1/2 |    | 
| 104 | Wed Aug 26 01:32:25 2009 | Christian Irmler | BELLE | APVDAQ + telescope 40 MHz transparent mode + cooling | run043 | 100600 | 26.08.2009  01:46:38 | 26.08.2009  07:10:14 | 
| Belle DUT, HV=80V,  40 MHz, 120 GeV6 samples, transparent mode
 w cooling, chiller set to 13 deg, 2900 rpm
 after realignement of modules
 new beam spot:
 
 
    
        
            | APV # 
 | n-side 
 | p-side 
 |  
            | JP 
 | 1/2 
 | 1/2 
 |  
            | Origami 
 | 2/3 
 | 1/2 |  
            | Flex 
 | 1/2 
 | 1/2 |  
            | Micron 
 | 0/1 
 | 1/2 |    | 
| 105 | Wed Aug 26 07:19:42 2009 | Christian Irmler | BELLE | APVDAQ + telescope 31.8 MHz transparent mode + cooling | run044 | 13504 | 26.08.2009  07:18:19 | 26.08.2009  08:46:11  (beam shut down @ 8:00) | 
| Belle DUT, HV=80V,  31.8 MHz, 120 GeV6 samples, transparent mode
 w cooling, chiller set to 13 deg, 2900 rpm
 after realignement of modules
 new beam spot:
 
 
    
        
            | APV # 
 | n-side 
 | p-side 
 |  
            | JP 
 | 1/2 
 | 1/2 
 |  
            | Origami 
 | 2/3 
 | 1/2 |  
            | Flex 
 | 1/2 
 | 1/2 |  
            | Micron 
 | 0/1 
 | 1/2 |    | 
| 6 | Mon Jul  6 14:30:45 2009 | Marko Dragicevic |  | Equipment List |  |  |  |  | 
| Slow Control: Source Measurement Unit Keithley K2410, Inv.Nr.: 540-702, 2000EUR
 -- Koax-Kabel + Adapter auf Banane
 Scanning Voltmeter Keithley K2700 , Inv.Nr.: 540-698, 2000EUR
 -- Shunt-Widerstand-Platine
 -- Flachbandkabel fuer Verbindung Shunt-Platine<->K2700
 TRHX
 -- 3 Sensoren
 -- 2 lange Flachbandkabel, 1 serielles Kabel
 LV-Power-Supplies, je 150EUR
 -- GW Instek GPC-1850, SN.: 4080392
 -- GW Instek GPC-1850D, Inv.Nr.: 545-059
 -- GW Instek GPC-1850D, Inv.Nr.: 545-062
 -- Systron Donner HR 20-10A, SN.: 781-092
 -- Systron Donner HR 20-10A, SN.: 781-096
 Oszilloskop Tektronix TDS 3054, SN.: B011109, 4000EUR
 -- 4 probes
 Die Katze (Belle-HV-Supply)
 -- HV-Kabel 30m
 GBIP-Kabel, 1x lang, 1x kurz
 Signalgenerator Agilent 81110A, Inv.Nr.: 541-054, 3000EUR
 
 DAQ:
 Chrisu-PC, Inv.Nr.: 401-925
 -- Monitore
 ---- Belinea, Inv.Nr.: 401-696
 ---- Gericom, SN.: M1132GR5467345
 -- Keyboard & Maus
 Wiener 9U-VME-Crate, Inv.Nr.: 545-043, 3000EUR
 -- Power Supply
 -- VME-Controller
 -- 4 VME-Module (1x Buffer, 3x FADC)
 DOCK-Box
 -- Power Kabel
 VME-Kabel (bockig) + Verlaengerung
 30m-Kabel (8xCat7, 2xCat5, 2xgrau)
 Lemo-Kabel
 100pin-Flachkabel Neco-Buffer
 Bananenkabel
 Hybridkabel (8x SiLC, Belle-Kabel)
 Special TLU-Adapter (flipping pin order of RJ45)
 Schrauben für Crate-Montage
 Erdungskabel (liegen am CERN im Labor)
 THRX + Hum. Sensoren!
 Magic Box
 
 DUT:
 Schrauben für Montage am Drehteller
 4mm Steckschlauch Stickstoff (Laenge?)
 Anschluss 1/8" auf 4mm Steckschlauch
 Druckminderer, SN.: 717.06143
 -- 6mm Snap-In
 -- 6mm Schlauch
 Chiller Huber ministat 230, Inv.Nr.: 482-021, 4000EUR
 -- Manual
 -- Netzteil
 -- langes serielles Kabel
 -- 5-6mm Schlauch
 -- Adapter
 -- 5 Liter dest. Wasser (falls noch Platz ist)
 -- LabView (falls ferngesteuert)
 Box-Deckel
 Baseplates (4?)
 Gaffa
 Doppelscotch
 Schwarze Selbstklebefolie
 Alufolie
 Sockel (2 verschiedene)
 Schablonen für SiLC-Angle Scan (08-Modules)
 gscheites Verlängerungskabel
 genug Schrauben, Gewindestangen, Flügelmuttern
 2 Balken für Pt-Module Drehungen (+ genug "Bolzen")
 GROSSES SCHWARZES LICHTDICHTES TUCH !!!!
 THRX-Kabel & Sensoren
 25 Module
 -- 4 Belle-Module (1 Stack)
 -- 2 pt-Module
 -- 2 Alignment-Module
 -- 2 Stacks mit Warschau-Sensoren (1x 6 Sensoren, 1x 3 Sensoren)
 -- 8 SiLC-Module (1 Stack)
 
 
 EDV:
 Netzwerkkabel
 Netzwerk-Switch:
 -- 3com Gigabit Switch 8, SN.: AB/9XRQ9J00171B0
 -- D-Link 8-Port GBit-Switch
 WLAN-Router: Linksys WRT54GL-DE, SN.: CL7B1H502248, 60 EUR
 1TB externe Festplatte: Western Digital MyBook, SN.: WCA551469094
 -- Netzgeraet
 -- USB-Kabel
 -- Firewire 400/800 Kabel
 Webcam
 USB-Stick
 Etikettiergeraet: Brother P-touch 1000
 Verlaengerungskabel ohne Ende…
 1 Dose Druckluft zur Reinigung
 Laptops
 -- Apple MacBook (MV) Inv.Nr.: 401-810
 -- Apple MacBook Pro (MD) Inv Nr.: 401-831
 -- Apple MacBook (GA) SN.:W87411Q3Z5Z
 2x PCI Express-Karten (noch zu kaufen), je 30EUR
 2x USB-Seriell Adapter
 1 Trommel Ethernet-Kabel (100m, vom Walzel)
 einige RJ-45 Stecker
 2.5" externe HD
 CD und DVD Rohlinge
 
 Tools:
 Diverse Adaptoren Lemo-BNC, Lemo-Lemo
 Taschenlampe +  2x Hirnbirn
 Massband
 Multimeter
 Werkzeug (Schraubenzieher & Co)
 Pinzetten
 Laserpointer
 Schwarze Fetzen
 Scotch tape
 Kabelbinder
 Adapter f. Steckdosen
 Verteiler-Leisten
 Tixo klein & gross
 Loetstation Advanced JBC, SN.: 76841165, inkl. Zubehoer
 Ethernet-Crimp-Zange
 Eisensagl
 Schublehre
 
 Misc:
 Fondueset
  Spiegelreflex Digitalkamera Canon 450D (400EUR)
 -- Stativ
 -- Reflexionszelt
 SLR Marko
 Stativ
 Scheinwerfer (fuer ordentliche Fotos)
 Akkus+Ladegerät
 Dickes Logbook
 Kugelschreiber/Bleistifte
 Pflaster
 Carnet ATA
 | 
| Attachment 1: carnet_aug09.xls | 
| 10 | Fri Jul 17 14:03:21 2009 | Stephan Hänsel |  | What to measure |  |  |  |  | 
|  Origami   Testbeam08 Module - Anglescan   Pt Modules (2Stück - je 2 Sensoren):  Anglescan - einzelne module (auch als "stub" (fixer Abstand zwischen ihnen) ?) wichtig: brauchen wir 2 Testbeam08 module um 90° verdreht für höheninformation??? (sensoren in den Pt-modulen sind nicht 100%ig parallel - MESSEN!)    Optical Modules:(DAUER ca 18 Stunden)
 - tests in box mit laserbeam (laser auf anderer Höhe al beam?!? - sonst geht der beam durch den Laser)   ITE Modules:  - 8 ter stack: (2 Testbeam08 module quer + 2 x 1stmetal128 + 2 x 2nd metal 128 + 2 x normal128) - 2ndmetal512 module 3 stück bauen und im beam versetzt einbauen parasitär bei den spanier-modulen)   zusätliche ideen: - CMS-Tracker slice (2Pt + 2 optische + 3 2ndmetal512 hintereinander in unterschiedlichen winkeln um einen tracker-slice zu simulieren - CMS-layout !?!)     | 
| 11 | Fri Jul 31 19:23:26 2009 | Thomas Bergauer |  | Laser Spot size |  |  |  |  | 
| 10cm nach Kollimator: Durchmesser 1.45mm (FWHM)
20cm nach Kollimator: Durchmesser 1,54mm (FWHM) | 
| Attachment 1: laser_spot_overview.jpg | 
|  | 
| Attachment 2: laser_spot_10cm.jpg | 
|  | 
| Attachment 3: laser_spot_20cm.jpg | 
|  | 
| Attachment 4: laser_spot_30cm.jpg | 
|  | 
| 12 | Tue Aug 11 14:03:57 2009 | Marko Dragicevic |  | Sensor Designs |  |  |  |  | 
| ScreenshotsHEPHY Gallery GDS File Viewer KLayout Website  Layer Properties File Warsaw.lypin den Attachments. | 
| Attachment 1: Wafer.gds | 
| Attachment 2: SensorSTD.gds | 
| Attachment 3: SensorPAS.gds | 
| Attachment 4: SensorPAD.gds | 
| Attachment 5: Sensor512.gds | 
| Attachment 6: Warsaw.lyp | 
| <?xml version="1.0"?>
<layer-properties>
 <properties>
  <frame-color>#01ff6b</frame-color>
  <fill-color>#01ff6b</fill-color>
  <frame-brightness>0</frame-brightness>
  <fill-brightness>0</fill-brightness>
  <dither-pattern>I3</dither-pattern>
  <visible>true</visible>
  <transparent>false</transparent>
  <width>1</width>
  <marked>false</marked>
  <animation>0</animation>
  <name>NPlus</name>
  <source>1/0@1</source>
 </properties>
 <properties>
  <frame-color>#ff0000</frame-color>
  <fill-color>#ff0000</fill-color>
  <frame-brightness>0</frame-brightness>
  <fill-brightness>0</fill-brightness>
  <dither-pattern>I9</dither-pattern>
  <visible>true</visible>
  <transparent>false</transparent>
  <width>1</width>
  <marked>false</marked>
  <animation>0</animation>
  <name>PPlus</name>
  <source>2/0@1</source>
 </properties>
 <properties>
  <frame-color>#ff8000</frame-color>
  <fill-color>#ff8000</fill-color>
  <frame-brightness>0</frame-brightness>
  <fill-brightness>0</fill-brightness>
  <dither-pattern>I0</dither-pattern>
  <visible>true</visible>
  <transparent>false</transparent>
  <width>1</width>
  <marked>false</marked>
  <animation>0</animation>
  <name>Via</name>
  <source>3/0@1</source>
 </properties>
 <properties>
  <frame-color>#00ffff</frame-color>
  <fill-color>#00ffff</fill-color>
  <frame-brightness>0</frame-brightness>
  <fill-brightness>0</fill-brightness>
  <dither-pattern>I15</dither-pattern>
  <visible>true</visible>
  <transparent>false</transparent>
  <width>1</width>
  <marked>false</marked>
  <animation>0</animation>
  <name>Metal</name>
  <source>4/0@1</source>
 </properties>
 <properties>
  <frame-color>#ff00ff</frame-color>
  <fill-color>#ff00ff</fill-color>
  <frame-brightness>0</frame-brightness>
  <fill-brightness>0</fill-brightness>
  <dither-pattern>I2</dither-pattern>
  <visible>true</visible>
  <transparent>false</transparent>
  <width>1</width>
  <marked>false</marked>
  <animation>0</animation>
  <name>Passivation</name>
  <source>5/0@1</source>
 </properties>
 <properties>
  <frame-color>#91ff00</frame-color>
  <fill-color>#91ff00</fill-color>
  <frame-brightness>0</frame-brightness>
  <fill-brightness>0</fill-brightness>
  <dither-pattern>I3</dither-pattern>
  <visible>true</visible>
  <transparent>false</transparent>
  <width>1</width>
  <marked>false</marked>
  <animation>0</animation>
  <name>PolySilicon</name>
  <source>6/0@1</source>
 </properties>
 <properties>
  <frame-color>#008050</frame-color>
  <fill-color>#008050</fill-color>
  <frame-brightness>0</frame-brightness>
  <fill-brightness>0</fill-brightness>
  <dither-pattern>I2</dither-pattern>
  <visible>true</visible>
  <transparent>false</transparent>
  <width>1</width>
  <marked>false</marked>
  <animation>0</animation>
  <name>PolySiHeads</name>
  <source>7/0@1</source>
 </properties>
 <properties>
  <frame-color>#ffa080</frame-color>
  <fill-color>#ffa080</fill-color>
  <frame-brightness>0</frame-brightness>
  <fill-brightness>0</fill-brightness>
  <dither-pattern>I0</dither-pattern>
  <visible>true</visible>
  <transparent>false</transparent>
  <width>1</width>
  <marked>false</marked>
  <animation>0</animation>
  <name>Via2</name>
  <source>8/0@1</source>
 </properties>
 <properties>
  <frame-color>#000080</frame-color>
  <fill-color>#000080</fill-color>
  <frame-brightness>0</frame-brightness>
  <fill-brightness>0</fill-brightness>
  <dither-pattern>I12</dither-pattern>
  <visible>true</visible>
  <transparent>false</transparent>
  <width>1</width>
  <marked>false</marked>
  <animation>0</animation>
  <name>Metal2</name>
  <source>10/0@1</source>
 </properties>
 <properties>
  <frame-color>#ffa080</frame-color>
  <fill-color>#ffa080</fill-color>
  <frame-brightness>0</frame-brightness>
  <fill-brightness>0</fill-brightness>
  <dither-pattern>I1</dither-pattern>
  <visible>true</visible>
  <transparent>false</transparent>
  <width>1</width>
  <marked>false</marked>
  <animation>0</animation>
  <name>Margins</name>
  <source>11/0@1</source>
 </properties>
 <properties>
  <frame-color>#805000</frame-color>
  <fill-color>#805000</fill-color>
  <frame-brightness>0</frame-brightness>
  <fill-brightness>0</fill-brightness>
  <dither-pattern>I0</dither-pattern>
  <visible>true</visible>
  <transparent>false</transparent>
  <width>1</width>
  <marked>false</marked>
  <animation>0</animation>
  <name>Dicing Lines</name>
  <source>12/0@1</source>
 </properties>
 <custom-dither-pattern>
  <pattern>
   <line>................................</line>
   <line>................................</line>
   <line>................................</line>
   <line>................................</line>
   <line>................................</line>
   <line>................................</line>
   <line>................................</line>
   <line>................................</line>
   <line>................................</line>
   <line>................................</line>
   <line>................................</line>
   <line>................................</line>
   <line>................................</line>
   <line>................................</line>
   <line>................................</line>
   <line>................................</line>
   <line>................................</line>
   <line>................................</line>
   <line>................................</line>
   <line>................................</line>
   <line>................................</line>
   <line>................................</line>
   <line>................................</line>
   <line>................................</line>
   <line>................................</line>
   <line>................................</line>
   <line>................................</line>
   <line>................................</line>
   <line>................................</line>
   <line>................................</line>
   <line>................................</line>
   <line>................................</line>
  </pattern>
  <order>1</order>
  <name></name>
 </custom-dither-pattern>
</layer-properties>
 | 
| 13 | Fri Aug 14 16:45:25 2009 | Stephan Hänsel |  | Module - Setups |  |  |  |  | 
|   
    5mm Inbus-Schlüssel3mm Inbus Schlüssel6- 2(1) x 30 Pt-Pinsbeim 5mm-Sockel müssen die 2 Löcher über die das optische Modul h03 verschraubt wird noch ausgeweitet werden (Thomas)bei Pt-Deckel oben einzeichnen welche Balkenstellung welchem Winkel entspricht (SK) ... SenkKopf (ZK) ... ZylinderKopf     OPTISCHER SETUP -  Setup-alignment-modules  upstream - BEAM VON UNTEN - APV-Nummerierung in Beamrichtung von links anfangend 1) Collimator 
    Alu-Spacer (neuer = höheren verwenden) + 4- M6 x 15 (ZK)schwarzer-Spanier-x-y-z-Tisch - Schreuben dabei -> Plastikschrauben abschneiden ?!? 2) 5mm Spacer + h03 - backplane richtung Collimator -  APV3210 
    2- M4 x 15  (SK) - 5mm Spacer durch Alignment-Boden mit h03 verschrauben3- M4 x 15  (SK) - Alignment-Boden auf Drehteller verschrauben 3) h04 - backplane richtung Collimator -  APV3210 
    2 Positionen2- M4 x 10  (SK)     Pt + ITE-512-Stack + 3 SiLC08-Module upstream - BEAM VON UNTEN - APV-Nummerierung in Beamrichtung von links anfangend 1) h06-ITE-512 - APV0123 (allerdings nur eineinhalb APVs gebondet!) 
 2) h05-ITE-512 - APV0123 3) h07-ITE-512 - APV3210 !!!
 4) SiLC08-2 - APV12 - 90° gedreht 5) SiLC08-1 - APV12 - 90° gedreht 6) SiLC08-0 - APV12 - 90° gedreht Stack 1) bis 6) 
    schwarzer Sockel +4- M4 x 35 (ZK) -> verschraubt in h06 und h072 Gewindestangen M6 x 80 + 4 Scheiben + 4 Muttern M6 -> die 3 ITE-512er zusammen3 Gewindestangen M6 x 160 + 6 Scheiben + 5 Flügelmuttern M6 + 1 Mutter M6 -> 3- SiLC08-Module VORSICHTIG dazu 7) h02-Pt - APV0123 - überprüfen - kann rotieren ;-) 
 
    Schrauben gehen von oben (ausserhalb der Box): Balken - Box-Deckel - Beilagscheibe - Pt-ModulBalken + 4- 2(1) x 30 Pins + 2- Scheiben + 2- M4 x 20 8) h01-Pt - APV0123 - überprüfen - kann rotieren;-) 
 
    Schrauben gehen von oben (ausserhalb der Box): Balken - Box-Deckel - Beilagscheibe - Pt-ModulBalken + 4- 2(1) x 30 Pins + 2- Scheiben + 2- M4 x 20     ITE128-Stack  upstream - BEAM VON UNTEN - APV-Nummerierung in Beamrichtung von links anfangend 1) h21_alignment-TS05 - APV12 - 90°gedreht 2) h13_ITE-PAS - APV1 3) h14_ITE-PAS - APV1 4) h15_ITE-PAD - APV1 5) h16_ITE-PAD - APV1 6) h11_ITE-STD - APV1 7) h12_ITE-STD - APV1 8) h22-alignment-TS07 - APV12 - 90°gedreht Schrauben verwenden je nach Sockel und Spacer   SiLC08-Stack  upstream - BEAM VON UNTEN - APV-Nummerierung in Beamrichtung von links anfangend 1) SiLC08-7 - APV12 - Überprüfen 2) SiLC08-6 - APV12 - Überprüfen 3) SiLC08-5 - APV12 - Überprüfen 4) SiLC08-4 - APV12 - Überprüfen 5) SiLC08-3 - APV12 - Überprüfen 6) SiLC08-2 - APV12 - Überprüfen 7) SiLC08-1 - APV12 - Überprüfen 8) SiLC08-0 - APV12 - Überprüfen  Schrauben verwenden je nach Sockel und Spacer | 
| 15 | Fri Aug 14 21:36:17 2009 | Markus Friedl |  | Config files |  |  |  |  | 
| Status of config files as of Friday 14 August 2009 late evening 
    
        
            | Config file name | Timing adjusted | Sensor definition | Tested |  
            | cern09_ite128_single1 | YES | NOT YET (?) | YES |  
            | cern09_ite128_multi6 | YES | NOT YET (?) | YES |  
            | cern09_pt_ite512_single1
 | YES | NOT YET (?) | YES |  
            | cern09_pt_ite512_multi6 | YES | NOT YET (?) | NO |  
            | cern09_alignment_beam_single1 | YES | NOT YET (?) | YES |  
            | cern09_alignment_beam_multi6 | YES | NOT YET (?) | YES |  
            | cern09_belle_single
 | YES | NOT YET (?) | YES |  
            | cern09_belle_multi6 | YES | NOT YET (?) | YES |  
            | cern09_silc_all_single | YES (2008) | YES (2008) | NO |  
            | cern09_silc_all_multi6 | YES (2008) | YES (2008) | NO |  
 
 
 | 
| 20 | Wed Aug 19 22:57:13 2009 | Marko Dragicevic |  | How-To |  |  |  |  | 
| TLU (run from DAQPCHEPHY):ssh eudet@eudetmac001.cern.chssh tlupc
 ~\eudaq\bin\TLUControl.exe -d1 -a12
 -t100 internal trigger-aXX Mask for Szintis:
 1   4 mm (front)
 2   4 mm (front)
 4   9 mm (back)
 8   9 mm (back)
 DAQ:Hostname: DAQPCHEPHY.CERN.CH XY Table PC:Hostname: XYPCEUDET.CERN.CH Beam Control:Hostname: cwo-hna453-h6b1.cern.ch137.138.61.206
 Eudet DAQ:vnc eudetmac001.cern.chCycle Run:
 o) stop DAQ
 o) kill eudaq Run Control
 o) restart: ./STARTRUN.FORTIS.1
 o) load config: testfortis_with_eudrb_beam_backpressure_WITH_SILC
 o) press: Config (wait ~1 min.)
 o) press: Start
 | 
| 55 | Fri Aug 21 17:14:58 2009 | Wolfgang Kiesenhofer |  | S/N Histograms Raw (no data selection) | run001 (strips), run002 (pitch adapter), run003 (upper edge) |  |  |  | 
|  | 
| Attachment 1: sn_langaufit_raw_strips.pdf | 
| Attachment 2: sn_langaufit_raw_pa.pdf | 
| Attachment 3: sn_langaufit_raw_edgerun.pdf | 
| 84 | Sun Aug 23 23:38:27 2009 | Georg Auzinger |  | Phone numbers |  |  |  |  | 
|  Georg #70 Wolfgang - Building: 41, Room: 204, Tel: ? Manfred: Building 38, Room 522, Tel: 70522 Chrisu: B39, room 309, Tel: 79309 Bergi: Tel Zimmer: 79112, Handy: 16-2471 Maks: Tel Zimmer: 79117 | 
| 94 | Tue Aug 25 09:00:51 2009 | Thomas Bergauer |  | beam conditions |  |  |  |  | 
| manually changed TRIM3, TRIM4 and TRIM6 | 
| Attachment 1: magnet_settings_withH6B.802.jpg | 
|  | 
| Attachment 2: 20090825_0859_beam_conditions.jpg | 
|  | 
| 114 | Fri Dec  4 12:21:56 2009 | Wolfgang Kiesenhofer |  | ITE128 strip correlation kendall tau (preliminary result) |  |  |  |  | 
| Kendall tau (rank correlation) for module 1 (single layer 1 / h13), module 2 (single layer 2 / h14),  module 6 (standard sensor 2 / h12)     | 
| Attachment 1: stripcorr_mod1_thrs5_ktau_ev100000_run002_strip.pdf | 
| Attachment 2: stripcorr_mod2_thrs5_ktau_ev100000_run002_strip.pdf | 
| Attachment 3: stripcorr_mod6_thrs5_ktau_ev100000_run002_strip.pdf |