Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS June 2009  Not logged in ELOG logo
Message ID: 76     Entry time: Sat Aug 22 23:06:22 2009
Author: Christian Irmler 
Project: BELLE 
Subject: pedestal correction 40 MHz transparent mode + cooling 
Run Number: pedcorr007 
Events:  
StartTime: 22.08.2009 23:04:29 
EndTime: 22.08.2009 23:13:51 

Belle DUT, HV=80V, 40 MHz, beam off
1 sample, transparent mode
pedestal correction

chiller set to 13 deg, 2900 rpm

ELOG V3.1.5-fc6679b