Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS June 2009  Not logged in ELOG logo
Message ID: 74     Entry time: Sat Aug 22 19:19:20 2009
Author: Christian Irmler 
Project: BELLE 
Subject: APVDAQ + telescope 40 MHz transparent mode + cooling 
Run Number: run020 
Events: 75k 
StartTime: 22.08.2009 19:17:29 
EndTime: 22.08.2009 22:09:53 

Belle DUT, HV=80V, 40 MHz, 120 GeV
6 samples, transparent mode
chiller set to 13 deg,  2900 rpm

water flow checked befor start of run

ELOG V3.1.5-fc6679b