Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS June 2009  Not logged in ELOG logo
Message ID: 41     Entry time: Fri Aug 21 06:16:15 2009
Author: Christian Irmler 
Project: BELLE 
Subject: internal calibration 40 MHz transparent mode 
Run Number: cal003 
Events:  
StartTime: 20.08.2009 23:27:12 
EndTime: 21.08.2009 00:05:16 

Belle DUT, intcal
HV=80V, 40 MHz, no beam

transparent mode

ELOG V3.1.5-fc6679b