| 
| ID | Date | Author | Project  | Subject | Run Number | Events | StartTime | EndTime |  | 92 | Mon Aug 24 22:12:22 2009 | Georg Auzinger | Pt_ITE512 | Pt_ITE512 15deg air | run032 | 19456 | 24.08.09 22:18:08 | 24.08.09 23:25:52 |  | Pt: 15 Grad, HV=200V, 0% RH, beam on, 120GeV ITE512: HV=70V, X-Y-Table: x=99.6, y=36   no beam --> run stopped after 19456 events |  | 93 | Tue Aug 25 01:33:18 2009 | Georg Auzinger | Pt_ITE512 | Pt_ITE512 0deg air | run033 | 151724 | 25.08.09 01:35:18 | 25.08.2009  08:44:27 |  | Pt: 0 Grad, HV=200V, 0% RH, beam on, 120GeV ITE512: HV=70V, X-Y-Table: x=99.6, y=36 |  | 95 | Tue Aug 25 09:01:12 2009 | Marko Dragicevic | Pt_ITE512 | Pt_ITE512 2deg air | run034 | 20k | 25.08.09 08:56:18 | 25.08.09 09:45: |  | Pt: 2 Grad, HV=200V, 0% RH, beam on, 120GeV ITE512: HV=70V, X-Y-Table: x=99.6, y=36 |  | 96 | Tue Aug 25 09:53:16 2009 | Marko Dragicevic | Pt_ITE512 | Pt_ITE512 4deg  NO air! | run035 | 20k | 25.08.2009  09:50 | 25.08.2009  11:00 |  | Pt: 4 Grad, HV=200V, 0% (start run) to 14% (end run) RH, beam on, 120GeV ITE512: HV=70V, X-Y-Table: x=99.6, y=36 |  | 97 | Tue Aug 25 11:26:23 2009 | Thomas Bergauer | Pt_ITE512 | Pt_ITE512 6deg NO air! | run036 | 20k | 25.08.2009 11:25 | 25.08.2009  12:19:55 |  | Pt: 6 Grad, HV=200V, 20% (start run) to % (end run) RH, beam on, 120GeV ITE512: HV=70V, X-Y-Table: x=99.6, y=36 MOEGLICHERWEISE WAR EIN MODUL AUF 8 GRAD |  | 98 | Tue Aug 25 12:30:04 2009 | Marko Dragicevic | Pt_ITE512 | Pt_ITE512 8deg  NO air! | run037 | 20k | 25.08.2009  12:45 | 25.08.2009  13:40:13 |  | Pt: 8 Grad, HV=200V, 28% (start run) to 31% (end run) RH, beam on, 120GeV ITE512: HV=70V, I=49.1muA X-Y-Table: x=99.6, y=36 |  | 99 | Tue Aug 25 13:48:30 2009 | Marko Dragicevic | Pt_ITE512 | Pt_ITE512 10deg  NO air! | run038 | 20k | 25.08.2009  13:54:54 | 25.08.2009  15:22:38 |  | Pt: 10 Grad, HV=200V, 31.7% (start run) to 33.8% (end run) RH, beam on, 120GeV ITE512: HV=70V, I=50muA X-Y-Table: x=99.6, y=36 |  | 100 | Tue Aug 25 15:33:07 2009 | Marko Dragicevic | Pt_ITE512 | Pt_ITE512 12deg NO air! | run039 | 20k | 25.08.2009 15:35 | 25.08.2009 17:10 |  | Pt: 12 Grad, HV=200V, 34.4% (start run) to 36.1% (end run) RH, beam on, 120GeV ITE512: HV=70V, I=50muA X-Y-Table: x=99.6, y=36 |  | 101 | Tue Aug 25 17:14:52 2009 | Marko Dragicevic | Pt_ITE512 | Pt_ITE512 17deg NO air! | run040 | 20k | 25.08.2009  17:17:11 | 25.08.2009  18:08:57 |  | Pt: 17 Grad, HV=200V, 36.5% (start run) to xx.1% (end run) RH, beam on, 120GeV ITE512: HV=70V, I=51muA X-Y-Table: x=99.6, y=36 |  | Attachment 1: Pt-17deg.png |  |  |  | 102 | Tue Aug 25 18:22:25 2009 | Manfred Valentan | Pt_ITE512 | Pt_ITE512 40deg NO air! (for calibration) | run041 | 10k | 25.08.2009 18:20:30 | 25.08.2009 |  | Pt: 40 Grad, HV=200V, 36.9% (start run) to xx% (end run) RH, beam on, 120GeV ITE512: HV=70V, I=51muA X-Y-Table: x=99.6, y=36 |  | 16 | Wed Aug 19 15:37:37 2009 | Christian Irmler | ITE128 | internal calibration | cal001 |  | 15:31:29 |  |  | 8 modules, HV=70V, 40MHz, 1 sampleno beam
 APV 4,5: inverter off, higher baseline = PAD modules |  | 18 | Wed Aug 19 20:43:14 2009 | Christian Irmler | ITE128 | ITE128 shooting into strips w/o pitch adapter, low position | run001 | 100600 | 19.08.2009  20:42:08 | 19.08.2009  22:54:21 |  | DUT: SiLC 08_1, 6 x ITE128, SiLC 08_2HV = 70V, 40MHz, 120 GeV
 TLU trigger, w/o telescope
 9x9 mm beam spot
 height (y) = 154.0979 ITE128 shooting into strips w/o pitch adapter, low position |  | 19 | Wed Aug 19 22:56:07 2009 | Christian Irmler | ITE128 | ITE128 shooting into strips w pitch adapter, upper position | run002 | 100600 | 19.08.2009  22:54:23 | 20.08.2009  00:11:31 |  | DUT: SiLC 08_1, 6 x ITE128, SiLC 08_2HV = 70V, 40MHz, 120 GeV
 TLU trigger, w/o telescope
 9x9 mm beam spot
 height (y) = 144.3099 ITE128 shooting into strips w pitch adapter, upper position |  | 21 | Thu Aug 20 00:16:45 2009 | Christian Irmler | ITE128 | pedestal correction | pedcorr001 |  | 20.08.2009  00:14:21 | 20.08.2009  00:24:28 |  | DUT: SiLC 08_1, 6 x ITE128, SiLC 08_2HV = 70V, 40MHz
 pedestal correction beam on   |  | 22 | Thu Aug 20 00:31:45 2009 | Christian Irmler | ITE128 | ITE128 shooting into strips w pitch adapter, upper position | run003 | 100600 | 20.08.2009  00:27:36 |  |  | DUT: SiLC 08_1, 6 x ITE128, SiLC 08_2HV = 70V, 40MHz, 120 GeV
 TLU trigger, w/o telescope
 9x9 mm beam spot
 height (y) = 139.3100 ITE128 shooting into strips w pitch adapter, upper edge of sensor |  | 77 | Sun Aug 23 01:46:03 2009 | Thomas Bergauer | ITE128 | 2nd run with ITE128: central position | run021 | 100k | 23.08.09 00:10 (ca.) | 23.08.2009  02:15:10 |  | ITE128 HV = 70V, 40MHz, 120 GeV TLU trigger w telescope  XY-Table: x=48, y=115.31 new beam position (used TRIM4 magnet at 7A): y down by 2mm. see attached picture |  | Attachment 1: Picture_1.png |  |  |  | 78 | Sun Aug 23 02:18:20 2009 | Thomas Bergauer | ITE128 | 2nd run with ITE128: top position (3mm below center); during night | run022 | 407895 | 23.08.2009  02:16:21 | 23.08.2009  08:04:09 |  | ITE128 HV = 70V, 40MHz, 120 GeV TLU trigger w telescope  XY-Table: x=48, y=112.31 |  | Attachment 1: Picture_1.png |  |  |  | 79 | Sun Aug 23 08:13:31 2009 | Thomas Bergauer | ITE128 | 2nd run with ITE128: top position (4mm below center) | run023 | 100k | 23.08.2009  08:06:58 | 23.08.2009  09:30:53 |  | ITE128 HV = 70V, 40MHz, 120 GeV TLU trigger w telescope  XY-Table: x=48, y=111.31 |  | 106 | Wed Aug 26 14:26:13 2009 | Wolfgang Kiesenhofer | ITE128 | S/N final Single-Metal | run001 & run002 |  |  |  |  | Most probable S/N, Single Metal Layer, 2D histogram fitted with langau in 5 bin (strips) slices. |  | Attachment 1: sn-pos_h13-h14_strips_pa_5bins.pdf |  | 107 | Wed Sep  2 14:15:17 2009 | Wolfgang Kiesenhofer | ITE128 | ITE 128 Cross-Talk | run002 |  |  |  |  | Preliminary strip correlation (Kendalls Tau) for threshold = 3*stripnoise. |  | Attachment 1: stripcorr_modall_thrs3_ktau.pdf |  |