Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS June 2009  Not logged in ELOG logo
Message ID: 77     Entry time: Sun Aug 23 01:46:03 2009
Author: Thomas Bergauer 
Project: ITE128 
Subject: 2nd run with ITE128: central position 
Run Number: run021 
Events: 100k 
StartTime: 23.08.09 00:10 (ca.) 
EndTime: 23.08.2009 02:15:10 

ITE128

HV = 70V, 40MHz, 120 GeV

TLU trigger w telescope 

XY-Table: x=48, y=115.31

new beam position (used TRIM4 magnet at 7A): y down by 2mm. see attached picture

Attachment 1: Picture_1.png  30 kB  Uploaded Sun Aug 23 02:47:30 2009  | Hide | Hide all
Picture_1.png
ELOG V3.1.5-fc6679b