Home Clean room MedAustron HEPHY testbeams old
testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS June 2009  Not logged in ELOG logo
Message ID: 106     Entry time: Wed Aug 26 14:26:13 2009
Author: Wolfgang Kiesenhofer 
Project: ITE128 
Subject: S/N final Single-Metal 
Run Number: run001 & run002 
Events:  
StartTime:  
EndTime:  

Most probable S/N, Single Metal Layer, 2D histogram fitted with langau in 5 bin (strips) slices.

Attachment 1: sn-pos_h13-h14_strips_pa_5bins.pdf  116 kB  Uploaded Wed Sep 2 14:51:16 2009  | Hide | Hide all
sn-pos_h13-h14_strips_pa_5bins.pdf
ELOG V3.1.4-966e3dd