| ID | 
Date | 
Author | 
Project  | 
Subject | 
Run Number | 
Events | 
StartTime | 
EndTime | 
Text | 
  |  
| 
  92  
 | 
Mon Aug 24 22:12:22 2009 | 
Georg Auzinger | Pt_ITE512 | Pt_ITE512 15deg air | run032 | 19456 | 24.08.09 22:18:08 | 24.08.09 23:25:52 | Pt: 15 Grad, HV=200V, 0% RH, beam on, 120GeV
 
ITE512: HV=70V,
 
X-Y-Table: 
x=99.6, y=36
 
 
 
no | 
   |  | 
  93  
 | 
Tue Aug 25 01:33:18 2009 | 
Georg Auzinger | Pt_ITE512 | Pt_ITE512 0deg air | run033 | 151724 | 25.08.09 01:35:18 | 25.08.2009  08:44:27 | Pt: 0 Grad, HV=200V, 0% RH, beam on, 120GeV
 
ITE512: HV=70V,
 
X-Y-Table: 
x=99.6, y=36 | 
   |  | 
  95  
 | 
Tue Aug 25 09:01:12 2009 | 
Marko Dragicevic | Pt_ITE512 | Pt_ITE512 2deg air  | run034 | 20k | 25.08.09 08:56:18  | 25.08.09 09:45:  | Pt: 2 Grad, HV=200V, 0% RH, beam on, 120GeV
 
ITE512: HV=70V,
 
X-Y-Table: 
x=99.6, y=36 | 
   |  | 
  96  
 | 
Tue Aug 25 09:53:16 2009 | 
Marko Dragicevic | Pt_ITE512 | Pt_ITE512 4deg  NO air! | run035 | 20k | 25.08.2009  09:50 | 25.08.2009  11:00 | Pt: 4 Grad, HV=200V, 0% (start run) to 
14% (end run) RH, beam on, 120GeV
 
ITE512: HV=70V,
 
X-Y-Table: | 
   |  | 
  97  
 | 
Tue Aug 25 11:26:23 2009 | 
Thomas Bergauer | Pt_ITE512 | Pt_ITE512 6deg NO air! | run036 | 20k | 25.08.2009 11:25 | 25.08.2009  12:19:55 | Pt: 6 Grad, HV=200V, 20% (start run) 
to % (end run) RH, beam on, 120GeV
 
ITE512: HV=70V,
 
X-Y-Table: | 
   |  | 
  98  
 | 
Tue Aug 25 12:30:04 2009 | 
Marko Dragicevic | Pt_ITE512 | Pt_ITE512 8deg  NO air! | run037 | 20k | 25.08.2009  12:45 | 25.08.2009  13:40:13 | Pt: 8 Grad, HV=200V, 28% (start run) to 
31% (end run) RH, beam on, 120GeV
 
ITE512: HV=70V, I=49.1muA
 
X-Y-Table: | 
   |  | 
  99  
 | 
Tue Aug 25 13:48:30 2009 | 
Marko Dragicevic | Pt_ITE512 | Pt_ITE512 10deg  NO air! | run038 | 20k | 25.08.2009  13:54:54 | 25.08.2009  15:22:38 | Pt: 10 Grad, HV=200V, 31.7% (start run) 
to 33.8% (end run) RH, beam on, 120GeV
 
ITE512: HV=70V, I=50muA
 
X-Y-Table: | 
   |  | 
  100  
 | 
Tue Aug 25 15:33:07 2009 | 
Marko Dragicevic | Pt_ITE512 | Pt_ITE512 12deg NO air!  | run039 | 20k | 25.08.2009 15:35 | 25.08.2009 17:10 | Pt: 12 Grad, HV=200V, 34.4% (start run) 
to 36.1% (end run) RH, beam on, 120GeV
 
ITE512: HV=70V, I=50muA
 
X-Y-Table: | 
   |  | 
  101  
 | 
Tue Aug 25 17:14:52 2009 | 
Marko Dragicevic | Pt_ITE512 | Pt_ITE512 17deg NO air! | run040 | 20k | 25.08.2009  17:17:11 | 25.08.2009  18:08:57 | Pt: 17 Grad, HV=200V, 36.5% (start run) 
to xx.1% (end run) RH, beam on, 120GeV
 
ITE512: HV=70V, I=51muA
 
X-Y-Table: | 
    |  | 
  102  
 | 
Tue Aug 25 18:22:25 2009 | 
Manfred Valentan | Pt_ITE512 | Pt_ITE512 40deg NO air! (for calibration) | run041 | 10k | 25.08.2009 18:20:30 | 25.08.2009 | Pt: 40 Grad, HV=200V, 36.9% (start run) 
to xx% (end run) RH, beam on, 120GeV
 
ITE512: HV=70V, I=51muA
 
X-Y-Table: | 
   |  | 
  16  
 | 
Wed Aug 19 15:37:37 2009 | 
Christian Irmler | ITE128 | internal calibration | cal001 |   | 15:31:29 |   | 8 modules, HV=70V, 40MHz, 1 sample
 
no beam 
 
APV 4,5: inverter off, higher baseline | 
   |  | 
  18  
 | 
Wed Aug 19 20:43:14 2009 | 
Christian Irmler | ITE128 | ITE128 shooting into strips w/o pitch adapter, low position | run001 | 100600 | 19.08.2009  20:42:08 | 19.08.2009  22:54:21 | DUT: SiLC 08_1, 6 x ITE128, SiLC 08_2
 
HV = 70V, 40MHz, 120 GeV
 
TLU trigger, w/o telescope | 
   |  | 
  19  
 | 
Wed Aug 19 22:56:07 2009 | 
Christian Irmler | ITE128 | ITE128 shooting into strips w pitch adapter, upper position | run002 | 100600 | 19.08.2009  22:54:23 | 20.08.2009  00:11:31 | DUT: SiLC 08_1, 6 x ITE128, SiLC 08_2
 
HV = 70V, 40MHz, 120 GeV
 
TLU trigger, w/o telescope | 
   |  | 
  21  
 | 
Thu Aug 20 00:16:45 2009 | 
Christian Irmler | ITE128 | pedestal correction | pedcorr001 |   | 20.08.2009  00:14:21 | 20.08.2009  00:24:28 | DUT: SiLC 08_1, 6 x ITE128, SiLC 08_2
 
HV = 70V, 40MHz
 
pedestal correction | 
   |  | 
  22  
 | 
Thu Aug 20 00:31:45 2009 | 
Christian Irmler | ITE128 | ITE128 shooting into strips w pitch adapter, upper position | run003 | 100600 | 20.08.2009  00:27:36 |   | DUT: SiLC 08_1, 6 x ITE128, SiLC 08_2
 
HV = 70V, 40MHz, 120 GeV
 
TLU trigger, w/o telescope | 
   |  | 
  77  
 | 
Sun Aug 23 01:46:03 2009 | 
Thomas Bergauer | ITE128 | 2nd run with ITE128: central position | run021 | 100k | 23.08.09 00:10 (ca.) | 23.08.2009  02:15:10 | ITE128
 
HV = 70V, 40MHz, 120 GeV
 
TLU trigger w telescope  | 
    |  | 
  78  
 | 
Sun Aug 23 02:18:20 2009 | 
Thomas Bergauer | ITE128 | 2nd run with ITE128: top position (3mm below center); during night | run022 | 407895 | 23.08.2009  02:16:21 | 23.08.2009  08:04:09 | ITE128
 
HV = 70V, 40MHz, 120 GeV
 
TLU trigger w telescope  | 
    |  | 
  79  
 | 
Sun Aug 23 08:13:31 2009 | 
Thomas Bergauer | ITE128 | 2nd run with ITE128: top position (4mm below center) | run023 | 100k | 23.08.2009  08:06:58 | 23.08.2009  09:30:53 | ITE128
 
HV = 70V, 40MHz, 120 GeV
 
TLU trigger w telescope  | 
   |  | 
  106  
 | 
Wed Aug 26 14:26:13 2009 | 
Wolfgang Kiesenhofer | ITE128 | S/N final Single-Metal | run001 & run002 |   |   |   | Most probable S/N, Single Metal Layer, 
2D histogram fitted with langau in 5 bin 
(strips) slices. | 
    |  | 
  107  
 | 
Wed Sep  2 14:15:17 2009 | 
Wolfgang Kiesenhofer | ITE128 | ITE 128 Cross-Talk | run002 |   |   |   | Preliminary strip correlation (Kendalls 
Tau) for threshold = 3*stripnoise. | 
    |   
 |