Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS June 2009  Not logged in ELOG logo
Message ID: 28     Entry time: Thu Aug 20 12:35:13 2009
Author: Christian Irmler 
Project: alignment_beam 
Subject: top right on sensor, point 3 
Run Number: run6865 
Events: 10600 
StartTime: 20.08.2009 12:31:35 
EndTime: 20.08.2009 12:48:04 

2 alignement modules

location in beam direction: h04-h03

beam in center of sensor

HV=70V, 40MHz, 6 samples

beam on, 120 GeV

module 1 (h03) is used w inverter off and higher base line

XY coordinates: X:43 y:121.3 (top right on sensor in beam direction)

ELOG V3.1.5-fc6679b