Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS June 2009  Not logged in ELOG logo
Message ID: 49     Entry time: Fri Aug 21 12:08:44 2009
Author: Christian Irmler 
Project: BELLE 
Subject: APVDAQ standalone 40 MHz 
Run Number: pedcorr003 
Events:  
StartTime: 21.08.2009 12:08:33 
EndTime: 21.08.2009 12:18:45  

4 Belle DUTs
HV=80V, 40 MHz
pedestal correction
beam position:  p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors)
 

ELOG V3.1.5-fc6679b