Message ID: 66     Entry time: Sat Aug 22 12:12:34 2009
Author: Christian Irmler 
Project: BELLE 
Subject: internal calibration 40 MHz transparent mode (cooling?) 
Run Number: cal007 
Events:  
StartTime: 22.08.2009 12:10:32  
EndTime: 22.08.2009 12:49:09 

Belle DUT, intcal
HV=80V, 40 MHz, beam off
1 sample, transparent mode
chiller set to 13 deg.

external 40 MHz clock

there was probably no water flow throught the pipe of the origami module during this run --> must be repeated