Message ID: 43     Entry time: Fri Aug 21 06:31:29 2009
Author: Christian Irmler 
Project: BELLE 
Subject: APVDAQ + telescope 
Run Number: run6873 
Events: 80173 
StartTime: 21.08.2009 00:47:38 
EndTime: 21.08.2009 06:07:02 

4 Belle DUTs
HV=80V, 40 MHz, 6 sample, 120 GeV
 
beam position:  p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors)

JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped)

run interrupted after 80173 --> bad timing, peak was at 4 th or 5 th sample