Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS June 2009  Not logged in ELOG logo
Message ID: 69     Entry time: Sat Aug 22 13:34:14 2009
Author: Christian Irmler 
Project: BELLE 
Subject: pedestal correction 31.8 MHz transparent mode (cooling?) 
Run Number: pedcorr005 
Events:  
StartTime: 22.08.2009 13:31:27 
EndTime: 22.08.2009 13:41:42 

Belle DUT, intcal
HV=80V, 31.8 MHz, beam off
1 sample, transparent mode
chiller set to 13 deg.


external 31.8 MHz clock

there was probably no water flow throught the pipe of the origami module during this run --> must be repeated!

ELOG V3.1.5-fc6679b