Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  Belle testbeam at SPS in June 2015, Page 6 of 6  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
IDdown Date Author Project Subject Run Number Events XYPosition Cooling Data
  7   Thu Jun 4 18:44:50 2015 Hao YinBelle II FADC (H6A)Hardware002500002NoGood

room temp, FIRRun001, pedestal run 003

Attachment 1: -Z_p-side_002ModProp.pdf
Attachment 2: -Z_n-side_002ModProp.pdf
Attachment 3: -Z_p-side_002Result.pdf
Attachment 4: L6_p-side_002ModProp.pdf
Attachment 5: -Z_n-side_002Result.pdf
Attachment 6: L6_n-side_002ModProp.pdf
Attachment 7: L6_p-side_002Result.pdf
Attachment 8: L5_p-side_002ModProp.pdf
Attachment 9: L6_n-side_002Result.pdf
Attachment 10: L5_n-side_002ModProp.pdf
Attachment 11: L5_p-side_002Result.pdf
Attachment 12: L3_p-side_002ModProp.pdf
Attachment 13: L5_n-side_002Result.pdf
Attachment 14: L3_n-side_002ModProp.pdf
Attachment 15: L3_p-side_002Result.pdf
Attachment 16: L3_n-side_002Result.pdf
Attachment 17: L4_p-side_002ModProp.pdf
Attachment 18: L4_n-side_002ModProp.pdf
Attachment 19: L4_p-side_002Result.pdf
  6   Thu Jun 4 15:12:41 2015 Hao YinBelle II FADC (H6A)Hardware001500001NoGood

PedestalRun001, FIRRun001, room temp
telescope n-side switched.
In order to correct the position change the

Attachment 1: BW_p-side_001Result.pdf
Attachment 2: BW_n-side_001Result.pdf
Attachment 3: L6_p-side_001ModProp.pdf
Attachment 4: L6_n-side_001ModProp.pdf
Attachment 5: L6_p-side_001Result.pdf
Attachment 6: L5_p-side_001ModProp.pdf
Attachment 7: L6_n-side_001Result.pdf
Attachment 8: L5_n-side_001ModProp.pdf
Attachment 9: L5_p-side_001Result.pdf
Attachment 10: L3_p-side_001ModProp.pdf
Attachment 11: L5_n-side_001Result.pdf
Attachment 12: L3_p-side_001Result.pdf
Attachment 13: L3_n-side_001ModProp.pdf
Attachment 14: L3_n-side_001Result.pdf
Attachment 15: L4_p-side_001ModProp.pdf
Attachment 16: L4_n-side_001ModProp.pdf
Attachment 17: L4_p-side_001Result.pdf
Attachment 18: L4_n-side_001Result.pdf
Attachment 19: BW_p-side_001ModProp.pdf
Attachment 20: BW_n-side_001ModProp.pdf
  5   Thu Jun 4 14:16:20 2015 Hao YinBelle II FADC (H6A)Pedestal00110000  Good

FirRun001, room temp
telescope n-side switched.

  4   Thu Jun 4 14:15:50 2015 Hao YinBelle II FADC (H6A)FIR001   Good

FIR filer and ADC delay with all sensor and telescope.
telescope n-side switched.

  3   Wed Jun 3 17:23:07 2015 Thomas BergauerBelle II FADC (H6A)XY stage positions    Unknown

x-Achse: positiv Richtung Saleve (counting room)

y-Achse: positiv Richtung UNTEN!!

 

position of laddertestbox xy stages:

Rev. Pos (BWD Sensor, BWD, Oben) x= 82.3, y=110.6

Mitte Sensor:

Pos 1: (mitte BWD sensor): x=144.74, y=80.8

Pos 2: (mitte Origami -z): x=269.62, y=80.8

Pos 3: (mitte Origami ce): x=394.42, y=80.8

Pos 4 (mitte FWD Micron Sensor): x=517, y=80.8

Ecke:

Pos 5 (Ecke BWD sensor): x=92.3, y=105.6

Pos 6 (Ecke Origami -z): x=217.18, y=105.6

Pos 7 (Ecke Origami ce): x=342.06, y=105.6

Pos 8 (Ecke FWD sensor): x=467,62, y=56,3 

Pos 9 (Ecke FWD sensor): x=568,33 y=64,48

Attachment 1: L5_Class_B-.PNG
L5_Class_B-.PNG
  2   Wed Jun 3 10:48:42 2015 Benedikt WürknercommonNetworking    Unknown

WLAN Router:

SSID: Hephy

password: 20supersecret14

DHCP Range: 192.168.0.200 to 239

Netmask: /24

DNS Server: 192.168.0.254

Gateway: 192.168.0.254

external IP: 128.141.174.109 (für diverse Port Forwardings)

 

Manuell vergebene IP Adressen bitte unbedingt Benni mitteilen oder/und in der folgenden Tabelle eintragen! 

IP/MAC Zuweisung:

IP Machine/Name intern Port Forwarding (aussen)
192.168.0.124 SVD Kenwood  VNC(5900)  VNC(9000)
192.168.0.11 SVD3 DAQ  VNC(5900)  VNC(9001)
192.168.0.12 TUX DAQ  VNC(5900), VNC(5901), SSH(22)  VNC(9009), VNC(9002), SSH(9003),
192.168.0.13 Belle XY Tisch    
192.168.0.14 TUXOA  SSH(22), VNC(5900)  SSH(9004), VNC(9012)
192.168.0.20 JTAG Server    
192.168.0.148 alixcool    
192.168.0.16 slowcontrol  VNC(5900)  VNC(9005)
192.168.0.144 CAEN Power supply    
192.168.0.17 zenpixelwiki  SSH(22), VNC(5900)  SSH(9006), VNC(9008)
192.168.0.18 TLU (pcx25042, XY)  VNC(5900)  VNC(9007)
192.168.0.19 Cooling control PC VNC(5900) VNC(9011)
192.168.0.240 NI GPIB - ENET / 1000    
192.168.0.150 Printserver  VNC(5900)  VNC(9010)
       
137.138.113.254 Aida PC   vnc(5900)

 

Admin Zugang Wlan Router:

IP: 192.168.0.254

Username: admin

password: Hephy2014

 

  1   Tue May 12 10:27:39 2015 Benedikt WürknerSVD3 (H6B)Setup information    Unknown

Information concerning the SVD3 setup during a beam test

In the beam area setup the whole crate and the power supply with the usual spider cable and the two Keithly 2410 high voltage supplies. Monitoring of the 2410 happens via a NI MAX interface that connects to the GPIB-Ethernet interface and needs to be configured there. The IP and password are noted on the device. The software can be found on heros in medialib/LONGTERM/longterm R3.1_doubleSided as a normal *.vi file. 

Default adresses 16 and 17 as defined in labview, need to figure out on site which is which, if the voltage selected (e.g. 100V) is applied as +50/-50 or if it is applied as +100/-100 before connecting the cables. 

Take a run without dut as well to check the telescope integrity. Without dut in beamline!!!!!

Attachment 1: spider-config.jpg
spider-config.jpg
ELOG V3.1.5-fc6679b