Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS October 2011, all entries  Not logged in ELOG logo
Entry  Wed Feb 22 18:32:24 2012, Christian Irmler, BELLE, Origami Module #4, run107, 50k, 22.02.2012 18:30:33, 22.02.2012 18:40:11, Good run107_apv5_raw_data.jpgrun107.jpg
Sr90, large scintillator, 
Origami Mod. #4
HV=+-40V, Ibias=1,6µA
Entry  Wed Feb 22 18:10:29 2012, Christian Irmler, BELLE, Origami Module #4, run106, 50k, 22.02.2012 17:39:10 , 22.02.2012 18:23:47, Good run106.jpg
Sr90, large scintillator, 
Origami Mod. #4
HV=+-40V, Ibias=1,6µA
Entry  Wed Feb 22 17:38:29 2012, Christian Irmler, BELLE, Origami Module #4, run105, 100k, 22.02.2012 17:39:10 , 22.02.2012 17:58:01, Good run105.jpg
Sr90, large scintillator, 
Origami Mod. #4
HV=+-40V, Ibias=1,6µA
Entry  Wed Feb 22 17:25:34 2012, Christian Irmler, BELLE, Origami Module #4, cal105, 83800, 22.02.2012 17:23:13 , 22.02.2012 17:34:27, Good 
Sr90, large scintillator, 
Origami Mod. #4
HV=+-40V, Ibias=1,6µA
Entry  Wed Feb 22 16:49:29 2012, Christian Irmler, BELLE, Origami Module #4, cal104, 83800, 22.02.2012 16:51:13, 22.02.2012 17:02:11, Good 
Sr90, large scintillator, 
Origami Mod. #4
HV=+-40V, Ibias=1,6µA
Entry  Wed Feb 22 16:21:23 2012, Christian Irmler, BELLE, Origami Module #4, run104, 100k, 22.02.2012 16:22:34, 22.02.2012 16:41:26, Good run104.jpgrun104_current.xls
Sr90, large scintillator, 
Origami Mod. #4
HV=+-40V, Ibias=1,6µA
Entry  Wed Feb 22 13:37:11 2012, Christian Irmler, BELLE, Origami Module #4, run103, 100k, 22.02.2012 13:35:08, 22.02.2012 13:54:08 , Crap 
Sr90, large scintillator, 
HVret @ Origami closed
HVret @ SMU connected
Entry  Wed Feb 22 13:17:34 2012, Christian Irmler, BELLE, Origami Module #4, cal102, 83800, 22.02.2012 13:11:30, 22.02.2012 13:25:18, Good 
Sr90, large scintillator, HVret @ Origami open
Origami Mod. #4
HV=+-40V, Ibias=1,8µA
Entry  Wed Feb 22 12:15:11 2012, Christian Irmler, BELLE, Origami Module #4, run102, 170k, 22.02.2012 12:31:08, 22.02.2012 13:03:27 , Good 
same as run101
Sr90, large scintillator, HVret @ Origami open
Origami Mod. #4
Entry  Mon Feb 20 17:27:02 2012, Christian Irmler, BELLE, Origami Module #4, run101, 24497, 20.02.2012 17:33:33, 20.02.2012 17:38:21, Good 
Sr90, large scintillator, HVret @ Origami open
Origami Mod. #4
HV=+-40V, Ibias=2,03µA
Entry  Mon Feb 20 17:20:20 2012, Christian Irmler, BELLE, Origami Module #4, cal100, 50k, 20.02.2012 17:19:03, 20.02.2012 17:29:58, Good 
Sr90, large scintillator, HVret @ Origami open
Origami Mod. #4
HV=+-40V, Ibias=2,03µA
Entry  Mon Feb 20 17:17:27 2012, Christian Irmler, BELLE, Origami Module #4, run100, 50k, 20.02.2012 17:07:21, 20.02.2012 17:17:22, Good 
Sr90, large scintillator, HVret @ Origami open
Origami Mod. #4
HV=+-40V, Ibias=2,03µA
Entry  Mon Oct 10 21:54:24 2011, Marko Dragicevic, Micron, Micron-Baby-Stack p-spray, run bottom right, run027, 700k, 10.10.2011 22:40:31, 11.10.2011 09:49:11, Unknown 
hit modules in bottom left corner -> Zones narrow and half-narrow for COMB_IRRAD, Zones wide and half-wide for COMM_IRRAD
timing corrected w.r.t. run004
Position of HEPHY x-z-table:
Entry  Mon Oct 10 00:50:23 2011, Christian Irmler, HPK, baby_add, run023, 680k, 10.10.2011 00:51:26, 10.10.2011 09:15:35, Good 
no cooling
beam on; xy table position x=330  y=74
HV=200V Istart_PY=1,9uA;  Istart_N=0.27uA
Entry  Mon Oct 10 16:26:20 2011, Marko Dragicevic, CNM, CNM stack, run026, 300000, 10.10.2011 16:23:46, 10.10.2011 20:30:00, Good 
no cooling
beam on; xy table position x=328  y=69.5
HV_CNM=20V, HV_BSTD1-N=200V
Entry  Mon Oct 10 14:11:53 2011, Christian Irmler, CNM, CNM stack, run025, 110000, 10.10.2011 14:09:00, 10.10.2011 16:11:57, Good 
no cooling
beam on; xy table position x=335.5  y=79.5
HV_CNM=20V, HV_BSTD1-N=200V
Entry  Mon Oct 10 12:15:52 2011, Manfred Valentan, CNM, CNM stack, run024, 110000, 10.10.2011 12:03:58, 10.10.2011 14:05:56, Good 
no cooling
beam on; xy table position x=320.5  y=79.5
HV_CNM=20V, HV_BSTD1-N=200V
Entry  Mon Oct 10 10:37:52 2011, Christian Irmler, CNM, CNM stack, cal012, 83800, 10.10.2011 11:29:55, 10.10.2011 11:40:55, Unknown 
no cooling
beam on; xy table position x=330  y=64
HV_CNM=20V, HV_BSTD1=200V
Entry  Sun Oct 9 13:12:32 2011, Karl-Heinz Hoffmann, HPK, baby_add, run022, 670k, 09.10.2011 13:09:32, 10.10.2011 00:48:16, Good 
no cooling
beam on; xy table position x=330  y=64
HV=200V Istart_PY=1,9uA;  Istart_N=0.27uA
Entry  Sun Oct 9 11:00:33 2011, Karl-Heinz Hoffmann, HPK, baby_add, run021, 150000, 09.10.2011 10:56:47, 09.10.2011 12:47:23, Good 
no cooling
beam on; xy table position x=330  y=74
HV=200V Istart_PY=1,9uA;  Istart_N=0.27uA
Entry  Sat Oct 8 23:27:44 2011, Karl-Heinz Hoffmann, HPK, baby_std, run020, 382000, 08.10.2011 23:24:16, 09.10.2011 09:24:20, Good 
no cooling
beam on; xy table position x=327,5  y=65
HV=200V Istart_PY=8.2uA;  Istart_N=0.45uA
Entry  Sat Oct 8 20:33:58 2011, Karl-Heinz Hoffmann, HPK, baby_std, run019, 150000, 08.10.2011 20:22:45, 08.10.2011 23:19:23, Good 
no cooling
beam on; xy table position x=333  y=80
HV=200V Istart_PY=8.2uA;  Istart_N=0.45uA
Entry  Sat Oct 8 16:45:14 2011, Thomas Bergauer, HPK, baby_std, run018, 150000, 08.10.2011 16:44:13, 08.10.2011 19:33:33, Good 
no cooling
beam on; xy table position x=322  y=80
HV=200V Istart_PY=8.2uA;  Istart_N=0.45uA
Entry  Sun Oct 9 10:05:34 2011, Markus Friedl, HPK, baby_std, cal010, 83800, 08.10.2011 13:36:25, 08.10.2011 13:54:07, Good 
HV=+-40V, 
no cooling
beam off; xy table position x=  y=
Entry  Sat Oct 8 00:14:37 2011, Christian Irmler, BELLE, Origami stack, run015, 180111, 08.10.2011 00:06:41, 08.10.2011 08:24:38, Good 
Origami6
HV=+-40V, 
no cooling
Entry  Fri Oct 7 19:35:14 2011, Christian Irmler, BELLE, Origami stack cooled, run014, 90k, 07.10.2011 19:49:26, 07.10.2011 23:26:52, Good 
Origami6
HV=+-40V,
CO2 cooling: P_TT_4: 14.9 bar, mf=0.9 g/s
Entry  Fri Oct 7 18:40:07 2011, Christian Irmler, BELLE, Origami stack cooled, cal009, 83800, 07.10.2011 18:35:04 , 07.10.2011 19:31:51, Good 
Origami6
HV=+-40V,
CO2 cooling: P_TT_4: 14.9 bar, mf=0.9 g/s
Entry  Fri Oct 7 10:13:12 2011, Christian Irmler, BELLE, Origami stack cooled, run013, 185k, 07.10.2011 10:02:20, 07.10.2011 17:17:32, Good 
HV=+-40V, 
CO2 cooling: P_TT_4: 18.2 bar, mf=1 g/s
beam on; xy table position x=321 y=99
Entry  Fri Oct 7 00:20:15 2011, Christian Irmler, BELLE, Origami stack cooled, run012, 250k, 07.10.2011 00:15:54 , 07.10.2011 09:13:55, Good 
HV=+-40V, 
CO2 cooling: P_TT_4: 18.2 bar, mf=1 g/s
beam on; xy table position x=352 y=89
Entry  Thu Oct 6 17:36:47 2011, Christian Irmler, BELLE, Origami stack cooled, run011, 180000, 06.10.2011 17:06:38, 07.10.2011 00:04:06, Good 
HV=+-40V, 
CO2 cooling: P_TT_4: 18.2 bar, mf=1 g/s
beam on; xy table position x=260.8 y=60.25
Entry  Wed Mar 7 16:58:36 2012, Christian Irmler, BELLE, Origami Module #4, cal113, 100k, 07.03.2012 16:40:04 , 07.03.2012 16:57:08, Unknown 
Sr90, small (new) scintillator, new trigger unit
Origami Mod. #4
HV=+-40V, Ibias=1,6µA
Entry  Wed Mar 7 16:03:30 2012, Christian Irmler, BELLE, Origami Module #4, run113, 100k, 07.03.2012 16:07:34, 07.03.2012 16:30:48 , Unknown run112-113.jpg
Sr90, small (new) scintillator, new trigger unit
Origami Mod. #4
HV=+-40V, Ibias=1,6µA
Entry  Thu Oct 6 15:57:51 2011, Christian Irmler, BELLE, Origami stack cooled, cal008, 83800, 06.10.2011 15:53:20, 06.10.2011 16:25:29 , Good 
HV=+-40V, 
CO2 cooling: P_TT_4: 18.2 bar, mf=1 g/s
beam on; xy table position x=306 y=76.5
Entry  Wed Oct 5 20:49:11 2011, Markus Friedl, BELLE, Origami stack cooled, run009, 330k, 05.10.2011 20:46:30, 06.10.2011 09:12:24 , Good 
HV=+-40V, 
CO2 cooling: P_TT_4: 18.2 bar, mf=0.9 g/s
beam on; xy table position x=306 y=76.5
Entry  Thu Oct 6 09:22:34 2011, Christian Irmler, BELLE, Origami stack cooled, run010, 330k, 05.10.2011 20:46:30, 06.10.2011 09:12:24 , Good 
HV=+-40V, 
CO2 cooling: P_TT_4: 18.2 bar, mf=0.9 g/s
beam on; xy table position x=306 y=76.5
Entry  Wed Oct 5 20:28:00 2011, Markus Friedl, BELLE, Origami stack cooled, run008, 10582, 05.10.2011 20:25:10, 05.10.2011 20:45:10, Good 
HV=+-40V, 
CO2 cooling: P_TT_4: 18.2 bar, mf=0.9 g/s
beam on
Entry  Wed Oct 5 19:57:15 2011, Christian Irmler, BELLE, Origami stack cooled , run007, 17845, 05.10.2011 18:27:51, 05.10.2011 19:31:43, Crap 
Run stopped after 17845 events, because of bad trigger timing

Origami6
Entry  Wed Oct 5 16:43:00 2011, Christian Irmler, BELLE, Origami stack cooled, cal006, 83800, 05.10.2011 16:40:18, 05.10.2011 17:12:27, Good 
Origami6
HV=+-40V
beam on
Entry  Wed Oct 5 13:00:41 2011, Christian Irmler, BELLE, Origami stack cooled , run006, 24692, 05.10.2011 12:55:53, 05.10.2011 14:05:49, Crap 
Run stopped after 24692 events, because all n-side APV failed due to a shortcut of a capacitor (C223) on n-side rebo
Origami6
HV=+-40V
Entry  Wed Oct 5 12:09:00 2011, Christian Irmler, BELLE, Origami stack cooled wrong I2C settings, cal005, 83800, 05.10.2011 12:04:50, 05.10.2011 12:37:11, Crap 
This calibration file can not be used, due to wrong I2C settings!
Origami6
HV=+-40V
Entry  Tue Oct 4 22:11:12 2011, Christian Irmler, BELLE, Origami stack, run005, 330000, 04.10.2011 22:09:37, 05.10.2011 09:11:54, Crap 
Origami6
HV=+-40V, no cooling
beam on
Entry  Mon Mar 5 19:06:41 2012, Christian Irmler, BELLE, Origami Module #4, cal110, 83800, 05.03.2012 19:05:52, 05.03.2012 19:17:01, Unknown 
Sr90, large scintillator, 
Origami Mod. #4
HV=+-40V, Ibias=1,9µA
Entry  Mon Mar 5 18:41:23 2012, Christian Irmler, BELLE, Origami Module #4, run110, 100k, 05.03.2012 18:45:21, 05.03.2012 19:04:30, Unknown 
Sr90, large scintillator, 
Origami Mod. #4
HV=+-40V, Ibias=1,9µA
Entry  Mon Mar 5 18:08:02 2012, Christian Irmler, BELLE, Origami Module #4, cal109, 83800, 05.03.2012 18:07:40, 05.03.2012 18:18:32, Unknown 
Sr90, large scintillator, 
Origami Mod. #4
HV=+-40V, Ibias=1,9µA
Entry  Mon Mar 5 17:36:46 2012, Christian Irmler, BELLE, Origami Module #4, run109, 100k, 05.03.2012 17:36:19 , 05.03.2012 17:55:24 , Unknown 
Sr90, large scintillator, 
Origami Mod. #4
HV=+-40V, Ibias=1,9µA
Entry  Mon Mar 5 17:35:31 2012, Christian Irmler, BELLE, Origami Module #4, cal108, 83800, 05.03.2012 16:47:51, 05.03.2012 17:05:16, Unknown run108-109.jpg
Sr90, large scintillator, 
Origami Mod. #4
HV=+-40V, Ibias=1,9µA
Entry  Mon Mar 5 17:34:43 2012, Christian Irmler, BELLE, Origami Module #4, run108, 100k, , 05.03.2012 16:24:12, Unknown 
Sr90, large scintillator, 
Origami Mod. #4
HV=+-40V, Ibias=1,9µA
Entry  Tue Oct 4 21:40:52 2011, Christian Irmler, BELLE, Origami stack, cal004, 83800, 04.10.2011 21:18:09, 04.10.2011 21:50:23, Good 
Origami6
HV=+-40V, no cooling
beam on
Entry  Tue Oct 4 15:16:45 2011, Manfred Valentan, Micron, Micron-Baby-Stack p-spray, run bottom right NOT USABLE, run004, 200k, 4.10.2011 15:28:48, 04.10.2011 19:36:50, Crap 
HAS TO BE REPEATED!!! Before this run there were changes in the trigger line (vetoing the trigger when no spill), and thus the timing is incorrect.
hit modules in bottom right corner -> Zones narrow and half-narrow for COMB_IRRAD, Zones wide and half-wide for COMM_IRRAD
Position of HEPHY x-z-table:
Entry  Tue Oct 4 15:16:06 2011, Manfred Valentan, Micron, Micron-Baby-Stack p-spray, run bottom left, run003, 200k, 04.10.2011 11:29:19, 04.10.2011 13:57:54, Good 
hit modules in bottom left corner -> Zones wide and half-wide for COMB_IRRAD, Zones narrow and half-narrow for BOMM_IRRAD
Position of HEPHY x-z-table:
x = 336
Entry  Tue Oct 4 10:44:48 2011, Christian Irmler, Micron, Internal Calibration, cal003, 83800, 04.10.2011 10:33:50, 04.10.2011 10:48:51,  
micronbaby p-spray/irrad
HV = -100V
beam on, baseline of irrad APV reduced
Entry  Tue Oct 4 10:44:09 2011, Christian Irmler, Micron, Internal Calibration, cal002, 83800, 04.10.2011 10:04:49, 04.10.2011 10:19:41,  
micronbaby p-spray/irrad
HV = -100V
beam on,
Entry  Tue Oct 4 00:11:31 2011, Manfred Valentan, Micron, Micron-Baby-Stack p-stop, zones w & h-w, run002, 760000, 04.10.2011 00:11:06, 04.10.2011 09:01:06, Good 
hit modules in bottom left corner -> Zones wide and half-wide for all modules
Position of HEPHY x-z-table:
x = 336
Entry  Mon Oct 3 21:01:00 2011, Manfred Valentan, Micron, Micron-Baby-Stack p-stop, zones n & h-n, run001, 200k, 03.10.2011 20:54:22, 03.10.2011 23:25:47, Good 
hit modules in top right corner -> Zones narrow and half-narrow for all modules
Position of HEPHY x-z-table:
x = 324
Entry  Tue Oct 4 10:47:59 2011, Manfred Valentan, Micron, Internal Calibration, cal001, 83800, 03.10.2011 20:34:48, 03.10.2011 20:50:57,  
micronbaby p-stop stack
HV = -100V
beam on
Entry  Wed Mar 7 15:12:42 2012, Christian Irmler, BELLE, Origami Module #4, run112, 100k, 07.03.2012 15:13:18, 07.03.2012 14:31:07, Unknown 
Sr90, small (new) scintillator, new trigger unit
Origami Mod. #4
HV=+-40V, Ibias=1,6µA
Entry  Fri Sep 16 11:01:15 2011, Manfred Valentan, Micron, Micron Baby Modules, , , , ,  
Irradiated modules from last year:
COMB-IRRAD: B2Micron_2826_19_Baby4: combined p-stop, intermediate strips (was DUT4)
COMM-IRRAD: B2Micron_2826_07_Baby2: common p-stop, intermediate strips (was DUT3)
Entry  Mon Sep 19 17:38:34 2011, Manfred Valentan, Micron, Module ATOLL-2, , , , ,  
Sensor: B2Micron_2826_17_Baby3
p-stop: Atoll, with intermediate strips
Hybrid p-side: H35 (reused from last year)
Entry  Mon Sep 19 17:39:09 2011, Manfred Valentan, Micron, Module COMM-2, , , , ,  
Sensor: B2Micron_2826_17_Baby2
p-stop: Common, with intermediate strips
Hybrid p-side: H34 (reused from last year)
Entry  Mon Sep 19 17:39:55 2011, Manfred Valentan, Micron, Module COMB-2, , , , ,  
Sensor: B2Micron_2826_17_Baby4
p-stop: Combined with intermediate strips
Hybrid p-side: H42 (reused from last year)
Entry  Mon Sep 19 17:40:47 2011, Manfred Valentan, Micron, Module SPRAY-2, , , , ,  
Sensor: B2Micron_2825_05_Baby4
p-stop: p-spray WITHOUT intermediate strips
Hybrid p-side: H44 (reused from last year)
Entry  Mon Sep 19 17:41:27 2011, Manfred Valentan, Micron, Module SPRAY-I-2, , , , ,  
Sensor: B2Micron_2825_15_Baby3
p-stop: p-spray WITH intermediate strips
Hybrid p-side: H43 (reused from last year)
Entry  Mon Sep 19 17:42:01 2011, Manfred Valentan, Micron, Module SPRAY-1, , , , ,  
Sensor: B2Micron_2825_05_Baby3
p-stop: p-spray WITHOUT intermediate strips
Hybrid p-side: H32 (reused from last year)
Entry  Mon Sep 19 17:42:39 2011, Manfred Valentan, Micron, Module SPRAY-I-1, , , , ,  
Sensor: B2Micron_2825_15_Baby2
p-stop: p-spray WITH intermediate strips
Hybrid p-side: MB1
Entry  Mon Sep 19 17:44:00 2011, Manfred Valentan, Micron, Module COMM-1, , , , ,  
Sensor: B2Micron_2826_19_Baby2 (reused from last year, was TRK7)
p-stop: Common, with intermediate strips
Hybrid p-side: H46
Entry  Mon Sep 19 17:44:39 2011, Manfred Valentan, Micron, Module COMB-1, , , , ,  
Sensor: B2Micron_2826_01_Baby4 (reused from last year, was TRK6)
p-stop: Combined, with intermediate strips
Hybrid p-side: H45
Entry  Mon Sep 19 17:46:07 2011, Manfred Valentan, Micron, Module ATOLL-1, , , , ,  
Sensor: B2Micron_2826_07_Baby3 (reused from last year, but was not used in beam test SPS2010) 
p-stop: Atoll, with intermediate strips
Hybrid p-side: H40
Entry  Mon Sep 19 17:47:11 2011, Manfred Valentan, Micron, Module COMB-IRRAD, , , , ,  
Sensor: B2Micron_2826_19_Baby4 (reused from last year, was DUT4, module is irradiated to 700 kGy)
p-stop: Combined, with intermediate strips, irradiated
Hybrid p-side: H48
Entry  Mon Sep 19 17:47:50 2011, Manfred Valentan, Micron, Module COMM-IRRAD, , , , ,  
Sensor: B2Micron_2826_07_Baby2 (reused from last year, was DUT3, module is irradiated to 700 kGy)
p-stop: Common, with intermediate strips, irradiated
Hybrid p-side: H41
Entry  Mon Oct 3 20:30:14 2011, Thomas Bergauer, common, XY Tisch, , , , ,  xy-tisch-control.JPGdesy_xy_table.jpg
Grosser (DESY) Tisch:  x = -342.0    y = 343.0  (Einheiten unbekannt, möglicherweise mm)
Raten-Scan siehe gescannter Zettel im Attachment.
 
Entry  Mon Oct 3 21:08:27 2011, Manfred Valentan, Micron, Micron-Baby-Stack p-stop, configuration, , , , ,  Micron-Baby-Stack_p-stop.pngcern11_micronbaby_pstop_single.cfgcern11_micronbaby_pstop_multi6.cfg
Photo of hand-drawn stack configuration, config files
Entry  Wed Oct 5 17:54:09 2011, Christian Irmler, BELLE, Origami stack cooled, cal007, 83800, 05.10.2011 17:51:57 , , Good 
I2C setting modified to improve the shape of the p-side signal --> shaping time reduced, pulse height still low
Origami6
HV=+-40V
Entry  Wed Oct 5 19:33:40 2011, Markus Friedl, common, Trigger condition, , , 4.10.2011 15:00, ,  trigger_path_with_veto.png
Changed trigger such that off-spill scintillator triggers are vetoed.
Inserted Flip-Flop which is set by begin of spill (WWE) and reset by end of spill signal (EE). Out-bar is put in coincidence with the scintillator
trigger.
Entry  Fri Oct 7 18:28:53 2011, Christian Irmler, common, run schedule, , , , , Unknown run_schedule.pdfrun_schedule.xlsx
 
Entry  Sat Oct 8 09:30:44 2011, Christian Irmler, BELLE, Cooling plant tests, , , 08.10.2011 09:30, , Unknown biascurrent_cooling_test1.jpgtemp_cooling_test1.jpg
Software run with 6 samples to ensure that APV chips dissipate full power.
DAQ data not saved, bias current monitored
new longterm files:
Entry  Sat Oct 8 14:33:25 2011, Thomas Bergauer, HPK, baby_std, run016, 250k, 08.10.2011 14:31:40, , Crap 
falsches config file (single statt multi6)
 
no cooling
Entry  Sat Oct 8 16:35:04 2011, Thomas Bergauer, HPK, baby_std, run017, , 08.10.2011 16:26:10, , Crap 
wrong timing
 
no cooling
Entry  Sun Oct 9 10:13:11 2011, Karl-Heinz Hoffmann, HPK, baby_add, cal011, 83800, 09.10.2011 10:05:01, , Good 
no cooling
beam on; xy table position x=  y=
HV=200V Istart_P=1.5uA;  Istart_N=0.22uA
Entry  Sun Oct 9 11:28:30 2011, Manfred Valentan, HPK, HPK BSTD stack configuration, , , , , Unknown IMG_5058.JPGIMG_5069.JPG
Module order:
BSTD1-N
BSTD2-N
Entry  Sun Oct 9 11:31:43 2011, Manfred Valentan, HPK, HPK BADD stack configuration, , , , , Unknown IMG_5097.JPG
Module order:
BADD1-N
BADD2-N
Entry  Mon Oct 10 12:16:06 2011, Marko Dragicevic, common, Beam Profile and Magnet BeamRef Settings , , , , , Unknown BeamProfile.pngMagentBeamRefs.png
Beam Profile from H6A, 10.10.2011 11:40
BeamRef settings for all magnets, File H6B.702
Entry  Mon Oct 10 12:32:42 2011, Manfred Valentan, CNM, CNM stack configuration, , , , , Unknown IMG_5102.JPGIMG_5092.JPG
Module order:
CNM-V1 (draws a lot of current, gives only low signal)
BSTD1-N (for height information)
Entry  Mon Oct 10 21:55:30 2011, Marko Dragicevic, Micron, Internal Calibration, cal013, 83800, 10.10.2011 21:52:32, , Unknown 
micronbaby p-spray/irrad
HV = -100V
beam on, baseline of irrad APV reduced
Entry  Thu Oct 13 13:08:38 2011, Thomas Bergauer, common, end of success, , , , , Unknown 
 
Entry  Thu Oct 20 11:49:14 2011, Markus Friedl, common, Scintillator dimensions, , , , , Good bhihagag.jpgbdgaegba.jpg
 
Entry  Mon Mar 5 19:27:56 2012, Christian Irmler, BELLE, Origami Module #4, run111, 50k, 05.03.2012 19:26:28, , Unknown 
Sr90, large scintillator, 
Origami Mod. #4
HV=+-40V, Ibias=1,30µA
Entry  Wed Mar 7 15:44:25 2012, Christian Irmler, BELLE, Origami Module #4, cal112, 83800, 07.03.2012 15:42:53, , Unknown 
Sr90, small (new) scintillator, new trigger unit
Origami Mod. #4
HV=+-40V, Ibias=1,6µA
ELOG V3.1.5-fc6679b