Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS October 2011  Not logged in ELOG logo
Message ID: 68     Entry time: Mon Oct 10 21:54:24 2011
Author: Marko Dragicevic 
Project: Micron 
Subject: Micron-Baby-Stack p-spray, run bottom right 
Run Number: run027 
Events: 700k 
StartTime: 10.10.2011 22:40:31 
EndTime: 11.10.2011 09:49:11 
Data: Unknown 

hit modules in bottom left corner -> Zones narrow and half-narrow for COMB_IRRAD, Zones wide and half-wide for COMM_IRRAD
timing corrected w.r.t. run004

Position of HEPHY x-z-table:
x = 322
z = 70

Note: z-Position not identical with position of run004, x-z-table seemed to have moved vertically. This configuration now hits the same sensor position.

ELOG V3.1.5-fc6679b