Message ID: 47     Entry time: Fri Oct 7 19:35:14 2011
Author: Christian Irmler 
Project: BELLE 
Subject: Origami stack cooled 
Run Number: run014 
Events: 90k 
StartTime: 07.10.2011 19:49:26 
EndTime: 07.10.2011 23:26:52 
Data: Good 

Origami6
HV=+-40V,
CO2 cooling: P_TT_4: 14.9 bar, mf=0.9 g/s
beam on; xy table position x=306 y=74.5

centered

I=17.8µA; old I2C settings; corrected trigger delay (htr); adjusted front-end voltages 

CO2 pressure reduced to 14.9 bar --> temp is about 4K colder
Temp. at pipe inlet (K7) = -18°C
Temp. at pipe outlet (K8) = -21.8°C

currents:

07.10.2011  23:26:21  event=89786  rate=0events/s temp/curr=33.0/-05.3 33.0/-05.8 33.0/-06.6 31.9/001.4 32.0/001.9 31.9/017.7
 