Message ID: 75     Entry time: Wed Feb 22 12:15:11 2012
Author: Christian Irmler 
Project: BELLE 
Subject: Origami Module #4 
Run Number: run102 
Events: 170k 
StartTime: 22.02.2012 12:31:08 
EndTime: 22.02.2012 13:03:27  
Data: Good 

same as run101

Sr90, large scintillator, HVret @ Origami open
Origami Mod. #4
HV=+-40V, Ibias=1,8µA
CO2 cooling on, Tin=-20.2°C, Tout=-21.3°C

I²C settings for cooled APV chips --> same as used in run010
e:\cvi-projects\apvdaq_fadc\origami6_V2_multi6_cooled.cfg

Lab measurement with new dark box but old, large scintillator.

CO2 empty after 24497 events --> run stopped --> no corresponding calibration available, but for rought analysis cal100 can be used for this run, too