Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS October 2011  Not logged in ELOG logo
Message ID: 34     Entry time: Wed Oct 5 16:43:00 2011
Author: Christian Irmler 
Project: BELLE 
Subject: Origami stack cooled 
Run Number: cal006 
Events: 83800 
StartTime: 05.10.2011 16:40:18 
EndTime: 05.10.2011 17:12:27 
Data: Good 

Origami6
HV=+-40V
beam on

CO2 cooling: 
preassure @ P_TT_4 = 18.2 bar
mass flow = 0.9 g/s

I=21.8µA

longterm files (same files used for cal005 and run006):
It-pos-0510111531.txt 
It-neg-0510111531.txt  

currents and temperatures:
05.10.2011  16:41:21  event=2850  rate=50events/s temp/curr=35.4/-05.8 35.3/-06.3 35.4/-07.2 34.9/002.0 34.9/002.5 34.9/021.7
05.10.2011  17:11:20  event=81237  rate=37events/s temp/curr=35.1/-05.8 35.1/-06.1 35.0/-07.1 34.5/002.0 34.5/002.5 34.5/021.4
 

ELOG V3.1.5-fc6679b