Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS October 2011  Not logged in ELOG logo
Message ID: 42     Entry time: Thu Oct 6 17:36:47 2011
Author: Christian Irmler 
Project: BELLE 
Subject: Origami stack cooled 
Run Number: run011 
Events: 180000 
StartTime: 06.10.2011 17:06:38 
EndTime: 07.10.2011 00:04:06 
Data: Good 

HV=+-40V,
CO2 cooling: P_TT_4: 18.2 bar, mf=1 g/s
beam on; xy table position x=260.8 y=60.25
I=19.4µA; old I2C settings; corrected trigger delay (htr); adjusted front-end voltages 

beam focused on APV #0 of p- and n-side, respectively

currents:
06.10.2011  17:07:41  event=639  rate=3events/s temp/curr=35.2/-05.6 35.2/-06.0 35.2/-06.9 34.5/001.7 34.5/002.2 34.5/019.6

ELOG V3.1.5-fc6679b