Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS October 2011  Not logged in ELOG logo
Message ID: 40     Entry time: Thu Oct 6 09:22:34 2011
Author: Christian Irmler 
Project: BELLE 
Subject: Origami stack cooled 
Run Number: run010 
Events: 330k 
StartTime: 05.10.2011 20:46:30 
EndTime: 06.10.2011 09:12:24  
Data: Good 

HV=+-40V,
CO2 cooling: P_TT_4: 18.2 bar, mf=0.9 g/s
beam on; xy table position x=306 y=76.5
I=20.5µA; corrected trigger delay (htr)

New run with cold Origami and same I2C setting as used 2010, with longer shaping time for p-side

centered position in both x and y.

corresponding cal file: cal006

currents:
06.10.2011  09:20:29  event=988  rate=0events/s temp/curr=35.8/-05.5 36.0/-06.0 35.8/-06.7 33.5/001.7 33.6/002.0 33.6/019.3
 

ELOG V3.1.5-fc6679b