Message ID: 33     Entry time: Wed Oct 5 13:00:41 2011
Author: Christian Irmler 
Project: BELLE 
Subject: Origami stack cooled  
Run Number: run006 
Events: 24692 
StartTime: 05.10.2011 12:55:53 
EndTime: 05.10.2011 14:05:49 
Data: Crap 

Run stopped after 24692 events, because all n-side APV failed due to a shortcut of a capacitor (C223) on n-side rebo

Origami6
HV=+-40V
beam on

CO2 cooling: 
preassure @ P_TT_4 = 18.77 bar
mass flow = 0.9 g/s

I=22.25µA

longterm files (same files used for cal005 and run006):
It-pos-0510111122.txt 
It-neg-0510111122.txt  

currents and temperatures:
05.10.2011  12:56:54  event=985  rate=0events/s temp/curr=35.0/-05.5 35.0/-06.1 34.9/-06.9 34.2/001.7 34.3/002.4 34.3/022.3
 