Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS June 2009, all entries  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Project Subject Run Numberdown Events StartTime EndTime Text Attachments
  43   Fri Aug 21 06:31:29 2009 Christian IrmlerBELLEAPVDAQ + telescoperun68738017321.08.2009 00:47:3821.08.2009 06:07:024 Belle DUTs
HV=80V, 40 MHz, 6 sample, 120 GeV
 
  
  42   Fri Aug 21 06:24:10 2009 Christian IrmlerBELLEAPVDAQ + telescope (beam alignement)run6872578521.08.2009 00:12:2621.08.2009 00:27:114 Belle DUTs
HV=80V, 40 MHz, 6 sample, 120 GeV
 
  
  31   Thu Aug 20 15:15:33 2009 Christian Irmleralignment_beambottom center on sensor, point 6run6869615 (beam manipulation by students)20.08.2009 14:56:16 20.08.2009 15:14:112 alignment modules
location in beam direction: h04-h03
beam in center of sensor
  
  30   Thu Aug 20 14:31:29 2009 Christian Irmleralignment_beambottom left on sensor, point 5run68681060020.08.2009 14:36:0020.08.2009 14:51:572 alignment modules
location in beam direction: h04-h03
beam in center of sensor
  
  29   Thu Aug 20 12:50:59 2009 Christian Irmleralignment_beambottom right on sensor, point 4run6866846720.08.2009 12:51:0420.08.2009 13:05:012 alignement modules
location in beam direction: h04-h03
beam in center of sensor
  
  28   Thu Aug 20 12:35:13 2009 Christian Irmleralignment_beamtop right on sensor, point 3run68651060020.08.2009 12:31:3520.08.2009 12:48:042 alignement modules
location in beam direction: h04-h03
beam in center of sensor
  
  27   Thu Aug 20 12:18:40 2009 Christian Irmleralignment_beamtop left on sensor, point 2run6863 (telescope 6864)1060020.08.2009 12:07:2820.08.2009 12:25:572 alignement modules
location in beam direction: h04-h03
beam in center of sensor
  
  26   Thu Aug 20 11:38:11 2009 Christian Irmleralignment_beamtop center, point 7run6861 (+6862)1060020.08.2009 11:36:3520.08.2009 11:53:512 alignement modules
location in beam direction: h04-h03
beam in center of sensor
  
  105   Wed Aug 26 07:19:42 2009 Christian IrmlerBELLEAPVDAQ + telescope 31.8 MHz transparent mode + coolingrun0441350426.08.2009 07:18:1926.08.2009 08:46:11 (beam shut down @ 8:00)Belle DUT, HV=80V,  31.8 MHz, 120
GeV
6 samples, transparent mode
  
  104   Wed Aug 26 01:32:25 2009 Christian IrmlerBELLEAPVDAQ + telescope 40 MHz transparent mode + coolingrun04310060026.08.2009 01:46:38 26.08.2009 07:10:14Belle DUT, HV=80V,  40 MHz, 120 GeV
6 samples, transparent mode
w cooling, chiller set to 13 deg,
  
  103   Tue Aug 25 20:21:31 2009 Christian IrmlerBELLEAPVDAQ + telescope 40 MHz transparent moderun0428518925.08.2009 20:18:1826.08.2009 01:27:12Belle DUT, HV=80V,  40 MHz, 120 GeV
6 samples, transparent mode
no cooling
  
  102   Tue Aug 25 18:22:25 2009 Manfred ValentanPt_ITE512Pt_ITE512 40deg NO air! (for calibration)run04110k25.08.2009 18:20:3025.08.2009Pt: 40 Grad, HV=200V, 36.9% (start run)
to xx% (end run) RH, beam on, 120GeV
ITE512: HV=70V, I=51muA
X-Y-Table:
  
  101   Tue Aug 25 17:14:52 2009 Marko DragicevicPt_ITE512Pt_ITE512 17deg NO air!run04020k25.08.2009 17:17:1125.08.2009 18:08:57Pt: 17 Grad, HV=200V, 36.5% (start run)
to xx.1% (end run) RH, beam on, 120GeV
ITE512: HV=70V, I=51muA
X-Y-Table:
 Pt-17deg.png 
  100   Tue Aug 25 15:33:07 2009 Marko DragicevicPt_ITE512Pt_ITE512 12deg NO air! run03920k25.08.2009 15:3525.08.2009 17:10Pt: 12 Grad, HV=200V, 34.4% (start run)
to 36.1% (end run) RH, beam on, 120GeV
ITE512: HV=70V, I=50muA
X-Y-Table:
  
  99   Tue Aug 25 13:48:30 2009 Marko DragicevicPt_ITE512Pt_ITE512 10deg NO air!run03820k25.08.2009 13:54:5425.08.2009 15:22:38Pt: 10 Grad, HV=200V, 31.7% (start run)
to 33.8% (end run) RH, beam on, 120GeV
ITE512: HV=70V, I=50muA
X-Y-Table:
  
  98   Tue Aug 25 12:30:04 2009 Marko DragicevicPt_ITE512Pt_ITE512 8deg NO air!run03720k25.08.2009 12:4525.08.2009 13:40:13Pt: 8 Grad, HV=200V, 28% (start run) to
31% (end run) RH, beam on, 120GeV
ITE512: HV=70V, I=49.1muA
X-Y-Table:
  
  97   Tue Aug 25 11:26:23 2009 Thomas BergauerPt_ITE512Pt_ITE512 6deg NO air!run03620k25.08.2009 11:2525.08.2009 12:19:55Pt: 6 Grad, HV=200V, 20% (start run)
to % (end run) RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table:
  
  96   Tue Aug 25 09:53:16 2009 Marko DragicevicPt_ITE512Pt_ITE512 4deg NO air!run03520k25.08.2009 09:5025.08.2009 11:00Pt: 4 Grad, HV=200V, 0% (start run) to
14% (end run) RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table:
  
  95   Tue Aug 25 09:01:12 2009 Marko DragicevicPt_ITE512Pt_ITE512 2deg air run03420k25.08.09 08:56:18 25.08.09 09:45: Pt: 2 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table:
x=99.6, y=36
  
  93   Tue Aug 25 01:33:18 2009 Georg AuzingerPt_ITE512Pt_ITE512 0deg airrun03315172425.08.09 01:35:1825.08.2009 08:44:27Pt: 0 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table:
x=99.6, y=36
  
  92   Mon Aug 24 22:12:22 2009 Georg AuzingerPt_ITE512Pt_ITE512 15deg airrun0321945624.08.09 22:18:0824.08.09 23:25:52Pt: 15 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table:
x=99.6, y=36
 
no
  
  91   Mon Aug 24 22:04:56 2009 Georg AuzingerPt_ITE512Pt_ITE512 13deg airrun03120k24.08.09 20:53:5024.08.09 22:00:49Pt: 13 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table:
x=99.6, y=36
  
  90   Mon Aug 24 18:30:07 2009 Georg AuzingerPt_ITE512Pt_ITE512 11deg airrun03020k24.08.09 18:45:0924.08.09 20:37:04Pt: 11 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table:
x=99.6, y=36
  
  89   Mon Aug 24 16:44:36 2009 Georg AuzingerPt_ITE512Pt_ITE512 9deg airrun02920k24.08.09 17:03:2124.08.09 18:20:55Pt: 9 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table:
x=99.6, y=36
  
  88   Mon Aug 24 15:28:49 2009 Georg AuzingerPt_ITE512Pt_ITE512 7deg airrun02820k24.08.09 15:39:5024.08.09 16:40:54Pt: 7 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table:
x=99.6, y=36
  
  87   Mon Aug 24 14:23:01 2009 Georg AuzingerPt_ITE512Pt_ITE512 5deg airrun02720k24.08.2009 14:27:0724.08.2009 15:26:20Pt: 5 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table:
x=99.6, y=36
  
  86   Mon Aug 24 13:01:14 2009 Georg AuzingerPt_ITE512Pt_ITE512 3deg airrun02620k24.08.09 11:24:3324.08.2009 14:11:45Pt: 3 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table:
x=99.6, y=36
  
  85   Mon Aug 24 11:58:23 2009 Georg AuzingerPt_ITE512Pt_ITE512 1deg airrun02520k24.08.09 11:24:3324.08.09 12:40:25Pt: 1 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table:
x=99.6, y=36
  
  81   Sun Aug 23 14:03:14 2009 Manfred ValentanPt_ITE512Pt & ITE512 center position, 1 degrun0242000023.08.2009 13:59:06 Pt: 1 Grad, HV=200V, 0% RH
ITE512: HV=70V
X-Y-Table: x=99.6, y=36
  
  79   Sun Aug 23 08:13:31 2009 Thomas BergauerITE1282nd run with ITE128: top position (4mm below center)run023100k23.08.2009 08:06:5823.08.2009 09:30:53ITE128
HV = 70V, 40MHz, 120 GeV
TLU trigger w telescope 
  
  78   Sun Aug 23 02:18:20 2009 Thomas BergauerITE1282nd run with ITE128: top position (3mm below center); during nightrun02240789523.08.2009 02:16:2123.08.2009 08:04:09ITE128
HV = 70V, 40MHz, 120 GeV
TLU trigger w telescope 
 Picture_1.png 
  77   Sun Aug 23 01:46:03 2009 Thomas BergauerITE1282nd run with ITE128: central positionrun021100k23.08.09 00:10 (ca.)23.08.2009 02:15:10ITE128
HV = 70V, 40MHz, 120 GeV
TLU trigger w telescope 
 Picture_1.png 
  74   Sat Aug 22 19:19:20 2009 Christian IrmlerBELLEAPVDAQ + telescope 40 MHz transparent mode + coolingrun02075k22.08.2009 19:17:2922.08.2009 22:09:53Belle DUT, HV=80V, 40 MHz, 120 GeV
6 samples, transparent mode
chiller set to 13 deg,  2900
  
  73   Sat Aug 22 15:52:33 2009 Christian IrmlerBELLEAPVDAQ + telescope 31.8 MHz transparent mode + coolingrun01975k22.08.2009 15:50:4022.08.2009 19:14:21Belle DUT, HV=80V, 31.8 MHz, 120 GeV
6 samples, transparent mode
chiller set to 13 deg,  2900
  
  64   Sat Aug 22 11:26:00 2009 Thomas BergauerBELLEAPVDAQ + telescope 40 MHz hit mode (cooling?)run01875k22.08.2009 11:16:5722.08.2009 11:58:56 HV=80V, 40 MHz, beam on, 120 GeV
6 samples, hit mode, hitcut=5
chiller
set to 13 deg.
 

  
  63   Sat Aug 22 10:28:50 2009 Thomas BergauerBELLEAPVDAQ + telescope 40 MHz hit mode (cooling?)run01775k22.08.2009 10:26:2822.08.2009 11:16:12 HV=80V, 40 MHz, beam on, 120 GeV
6 samples, hit mode, hitcut=4
chiller
set to 13 deg.
 

  
  62   Sat Aug 22 09:44:50 2009 Thomas BergauerBELLEAPVDAQ + telescope 31,8 MHz hit mode (cooling?)run01675k22.08.2009 09:42:3822.08.2009 10:24:05 HV=80V, 31.8 MHz, beam on, 120 GeV
6 samples, hit mode, hitcut=5
chiller
set to 13 deg.
 

  
  61   Sat Aug 22 08:32:02 2009 Thomas BergauerBELLEAPVDAQ + telescope 31,8 MHz hit mode (cooling?)run01575k22.08.2009 08:15:0522.08.2009 09:25:21 HV=80V, 31.8 MHz, beam on, 120 GeV
6 samples, hit mode, hitcut=4
chiller
set to 13 deg.
 

  
  60   Sat Aug 22 03:27:13 2009 Thomas BergauerBELLEAPVDAQ + telescope 31,8 MHz transparent mode (cooling?)run01475k22.08.2009 03:25:2322.08.2009 07:08:09 HV=80V, 31.8 MHz, beam on, 120 GeV
6 samples
chiller set
to 13 deg.
 

  
  59   Sat Aug 22 01:06:34 2009 Christian IrmlerBELLEAPVDAQ + telescope 40 MHz transparent mode (cooling?)run0137500021.08.2009 23:49:38 22.08.2009 03:21:48Belle DUT, tranparent mode
HV=80V, 40 MHz, beam on, 120 GeV
6 samples
  
  57   Fri Aug 21 18:35:13 2009 Christian IrmlerBELLEAPVDAQ + telescope 31.8 MHz transparent moderun0126000021.08.2009 18:31:0121.08.2009 23:25:034 Belle DUTs
HV=80V, 31.8 MHz, 6 sample, 120 GeV
external clock source
  
  51   Fri Aug 21 13:38:20 2009 Christian IrmlerBELLEAPVDAQ standalone 31.8 MHz hit moderun0117500021.08.2009 13:35:25  4 Belle DUTs
HV=80V, 31.8 MHz, 6 sample, 120 GeV
external clock source
  
  50   Fri Aug 21 12:22:43 2009 Christian IrmlerBELLEAPVDAQ standalone 31.8 MHz hit moderun0107500021.08.2009 12:53:02 21.08.2009 13:35:014 Belle DUTs
HV=80V, 31.8 MHz, 6 sample, 120 GeV
switched to external clock source
  
  48   Fri Aug 21 12:06:39 2009 Christian IrmlerBELLEAPVDAQ standalone hit mode 40 MHzrun0097500021.08.2009 11:48:2221.08.2009 12:01:534 Belle DUTs
HV=80V, 40 MHz, 6 sample, 120 GeV
 
  
  47   Fri Aug 21 12:06:29 2009 Christian IrmlerBELLEAPVDAQ standalone hit mode 40 MHzrun0087500021.08.2009 11:15:0921.08.2009 11:29:534 Belle DUTs
HV=80V, 40 MHz, 6 sample, 120 GeV
 
  
  46   Fri Aug 21 12:06:06 2009 Christian IrmlerBELLEAPVDAQ standalone 40 MHzrun007interrupted21.08.2009 11:06:4521.08.2009 11:10:404 Belle DUTs
HV=80V, 40 MHz, 6 sample, 120 GeV
 
  
  45   Fri Aug 21 12:05:31 2009 Christian IrmlerBELLEAPVDAQ standalone 40 MHz hit moderun006interrupted21.08.2009 10:41:5121.08.2009 10:54:374 Belle DUTs
HV=80V, 40 MHz, 6 sample, 120 GeV
 
  
  44   Fri Aug 21 06:34:39 2009 Christian IrmlerBELLEAPVDAQ + telescope 40 MHzrun0057500021.08.2009 06:10:4121.08.2009 10:37:33was originally  run004, renamed after
run was stopped to avoid duplicate names
4 Belle DUTs
  
  25   Thu Aug 20 11:23:04 2009 Christian Irmleralignment_beambeam in center of sensor w telescoperun004 (6860 telescope)1060020.08.2009 11:09:50 20.08.2009 11:25:162 alignement modules
location in beam direction: h04-h03
beam in center of sensor
  
  22   Thu Aug 20 00:31:45 2009 Christian IrmlerITE128ITE128 shooting into strips w pitch adapter, upper positionrun00310060020.08.2009 00:27:36 DUT: SiLC 08_1, 6 x ITE128, SiLC 08_2
HV = 70V, 40MHz, 120 GeV
TLU trigger, w/o telescope
  
  19   Wed Aug 19 22:56:07 2009 Christian IrmlerITE128ITE128 shooting into strips w pitch adapter, upper positionrun00210060019.08.2009 22:54:2320.08.2009 00:11:31DUT: SiLC 08_1, 6 x ITE128, SiLC 08_2
HV = 70V, 40MHz, 120 GeV
TLU trigger, w/o telescope
  
  107   Wed Sep 2 14:15:17 2009 Wolfgang KiesenhoferITE128ITE 128 Cross-Talkrun002   Preliminary strip correlation (Kendalls
Tau) for threshold = 3*stripnoise.
 stripcorr_modall_thrs3_ktau.pdf 
  55   Fri Aug 21 17:14:58 2009 Wolfgang Kiesenhofer S/N Histograms Raw (no data selection)run001 (strips), run002 (pitch adapter), run003 (upper edge)      sn_langaufit_raw_strips.pdfsn_langaufit_raw_pa.pdfsn_langaufit_raw_edgerun.pdf 
  106   Wed Aug 26 14:26:13 2009 Wolfgang KiesenhoferITE128S/N final Single-Metalrun001 & run002   Most probable S/N, Single Metal Layer,
2D histogram fitted with langau in 5 bin
(strips) slices.
 sn-pos_h13-h14_strips_pa_5bins.pdf 
  18   Wed Aug 19 20:43:14 2009 Christian IrmlerITE128ITE128 shooting into strips w/o pitch adapter, low positionrun00110060019.08.2009 20:42:0819.08.2009 22:54:21DUT: SiLC 08_1, 6 x ITE128, SiLC 08_2
HV = 70V, 40MHz, 120 GeV
TLU trigger, w/o telescope
  
  82   Sun Aug 23 17:18:25 2009 Christian IrmlerPt_ITE512pedestal correctionpedcorr008 23.08.2009 17:17:36  Pt: 1 Grad, HV=200V, 0% RH, intcal, beam
off
ITE512: HV=70V,
  
  76   Sat Aug 22 23:06:22 2009 Christian IrmlerBELLEpedestal correction 40 MHz transparent mode + coolingpedcorr007 22.08.2009 23:04:2922.08.2009 23:13:51Belle DUT, HV=80V, 40 MHz, beam off
1 sample, transparent mode
pedestal correction
  
  72   Sat Aug 22 15:28:00 2009 Christian IrmlerBELLEpedestal correction 31.8 MHz transparent mode + coolingpedcorr006 22.08.2009 15:25:3522.08.2009 15:36:00Belle DUT, HV=80V, 31.8 MHz, beam off
1 sample, transparent mode
pedestal correction
  
  69   Sat Aug 22 13:34:14 2009 Christian IrmlerBELLEpedestal correction 31.8 MHz transparent mode (cooling?)pedcorr005 22.08.2009 13:31:2722.08.2009 13:41:42Belle DUT, intcal
HV=80V, 31.8 MHz, beam off
1 sample, transparent mode
  
  56   Fri Aug 21 18:07:57 2009 Christian IrmlerBELLEAPVDAQ standalone 31.8 MHzpedcorr004 21.08.2009 17:49:1021.08.2009 18:24:314 Belle DUTs
HV=80V, 31.8 MHz
pedestal correction
  
  49   Fri Aug 21 12:08:44 2009 Christian IrmlerBELLEAPVDAQ standalone 40 MHzpedcorr003 21.08.2009 12:08:3321.08.2009 12:18:45 4 Belle DUTs
HV=80V, 40 MHz
pedestal correction 
  
  24   Thu Aug 20 11:05:26 2009 Christian Irmleralignment_beampedeatal correctionpedcorr002 20.08.2009 11:05:4120.08.2009 11:09:352 alignement modules
location in beam direction: h04-h03
HV=70V, 40MHz, 1 sample
  
  21   Thu Aug 20 00:16:45 2009 Christian IrmlerITE128pedestal correctionpedcorr001 20.08.2009 00:14:2120.08.2009 00:24:28DUT: SiLC 08_1, 6 x ITE128, SiLC 08_2
HV = 70V, 40MHz
pedestal correction
  
  40   Thu Aug 20 20:06:06 2009 Manfred Valentanalignment_laserlow intensity (like laser001), but far sensor in 2nd positionlaser00750k20.08.2009 19:57:5220.08.2009 20:05:34HV=70V, 40MHz, 6 samples, beam off, far
sensor in 2nd position
5ns trigger pulse width, 1 kHz trigger,
  
  39   Thu Aug 20 19:56:21 2009 Manfred Valentanalignment_laserbackground mesurement with laser OFFlaser00610k20.08.2009 19:54:0420.08.2009 19:55:38    
  38   Thu Aug 20 19:46:02 2009 Manfred Valentanalignment_laserlaser at high intensity, far sensor in 2nd positionlaser0055000020.08.2009 19:45:1620.08.2009 19:53:01far sensor in 2nd position; laser at high
intensity (saturation on near sensor, good
signal on far sensor)
  
  37   Thu Aug 20 19:35:06 2009 Manfred Valentanalignment_laserlaser at high intensity (saturation on near sensor, good signal on far sensor)laser00410000020.08.2009 19:18:4720.08.2009 19:35:05HV=70V, 40MHz, 6 samples, beam off
5ns trigger pulse width, 1 kHz trigger,
 laser_interference.png 
  36   Thu Aug 20 19:15:29 2009 Manfred Valentanalignment_laserlaser onlaser0031000020.08.2009 19:13:0420.08.2009 19:14:49HV=70V, 40MHz, 6 samples, beam off
5ns trigger pulse width, 1 kHz trigger,
  
  35   Thu Aug 20 19:12:23 2009 Manfred Valentanalignment_laserbackground mesurement with laser OFFlaser0021000020.08.2009 19:10:0920.08.2009 19:11:57    
  34   Thu Aug 20 18:56:25 2009 Christian Irmleralignment_laserlaserlaser00110000020.08.2009 18:48:53 2 alignment modules
location in beam direction: h04-h03
laser is shooting on h03 (opposite
  
  83   Sun Aug 23 17:19:50 2009 Christian IrmlerPt_ITE512internal calibrationcal011 23.08.2009 16:30:4323.08.2009 17:02:14Pt: 1 Grad, HV=200V, 0% RH, intcal, beam
off
ITE512: HV=70V,
  
  75   Sat Aug 22 22:14:50 2009 Christian IrmlerBELLEinternal calibration 40 MHz transparent mode + coolingcal010 22.08.2009 22:24:22 Belle DUT, intcal
HV=80V, 40 MHz, beam off
1 sample, transparent mode
  
  70   Sat Aug 22 14:46:12 2009 Christian IrmlerBELLEinternal calibration 31.8 MHz transparent mode + coolingcal009 22.08.2009 14:43:5522.08.2009 15:22:37Belle DUT, intcal
HV=80V, 31.8 MHz, beam off
1 sample, transparent mode
  
  68   Sat Aug 22 13:30:28 2009 Christian IrmlerBELLEinternal calibration 31.8 MHz transparent mode (cooling?)cal008 22.08.2009 12:50:4822.08.2009 13:29:25Belle DUT, intcal
HV=80V, 31.8 MHz, beam off
1 sample, transparent mode
  
  66   Sat Aug 22 12:12:34 2009 Christian IrmlerBELLEinternal calibration 40 MHz transparent mode (cooling?)cal007 22.08.2009 12:10:32 22.08.2009 12:49:09Belle DUT, intcal
HV=80V, 40 MHz, beam off
1 sample, transparent mode
  
  54   Fri Aug 21 16:37:22 2009 Christian IrmlerBELLEinternal calibration 40 MHz hit modecal006 21.08.2009 16:30:33 Belle DUT, intcal
HV=80V, 40 MHz, no beam
hit mode
  
  53   Fri Aug 21 15:27:08 2009 Christian IrmlerBELLEinternal calibration 31.8 MHz hit modecal005 21.08.2009 15:34:4321.08.2009 16:29:47 Belle DUT, intcal
HV=80V, 31.8 MHz, no beam
hit mode
  
  52   Fri Aug 21 14:18:11 2009 Christian IrmlerBELLEinternal calibration 31.8 MHz transparent modecal004 21.08.2009 14:21:4021.08.2009 15:01:24Belle DUT, intcal
HV=80V, 31.8 MHz, no beam
transparent mode
  
  41   Fri Aug 21 06:16:15 2009 Christian IrmlerBELLEinternal calibration 40 MHz transparent modecal003 20.08.2009 23:27:1221.08.2009 00:05:16Belle DUT, intcal
HV=80V, 40 MHz, no beam
transparent mode
  
  23   Thu Aug 20 10:48:39 2009 Christian Irmleralignment_beaminternal calibrationcal002 20.08.2009 10:49:0720.08.2009 10:59:432 alignement modules
location in beam direction: h04-h03
HV=70V, 40MHz, 1 sample
  
  16   Wed Aug 19 15:37:37 2009 Christian IrmlerITE128internal calibrationcal001 15:31:29 8 modules, HV=70V, 40MHz, 1 sample
no beam 
APV 4,5: inverter off, higher baseline
  
  32   Thu Aug 20 15:50:58 2009 Manfred Valentanalignment_laserslow control: HV graphall alignemnt_laser runs 20.08.09 10:364h 43m 52s laterblue graph: h03
white graph: h04
 slow_control_alignment_sensors.gif 
  1   Mon Jul 6 12:22:47 2009 Stephan HänselSiLCMeasurements - hybrids with APV    Pt Modules: 
Hybrids with 4 APVs:
  
 
  
  2   Mon Jul 6 12:24:53 2009 Stephan HänselSiLCModule Drawings     Pt Modules: 

    
3D-View 
    technical drawings:
  
  5   Mon Jul 6 12:29:20 2009 Stephan HänselSiLCSensors - layout     Pt Modules: 
CMS OB1 Sensors:

    
 Wafer-Screenshot.png 
  6   Mon Jul 6 14:30:45 2009 Marko Dragicevic Equipment List    [B]Slow Control:[/B]
Source Measurement Unit Keithley K2410, Inv.Nr.:
540-702, 2000EUR
 carnet_aug09.xls 
  7   Mon Jul 6 16:22:36 2009 Stephan HänselSiLCMeasurements - Sensors     Pt Modules: 
OB1-Sensors:
     30210331516116
  
  8   Mon Jul 6 16:23:51 2009 Stephan HänselSiLCModule Components     Pt Modules: 

Pt-1:
  
  9   Thu Jul 9 10:29:58 2009 Stephan HänselSiLCMeasurements - Modules     Pt Modules:

- Sensoren sind Luftfeuhtigkeitsempfindlich
  
  10   Fri Jul 17 14:03:21 2009 Stephan Hänsel What to measure     Origami
 
Testbeam08 Module
  
  11   Fri Jul 31 19:23:26 2009 Thomas Bergauer Laser Spot size    10cm nach Kollimator: Durchmesser 1.45mm (FWHM)
20cm
nach Kollimator: Durchmesser 1,54mm (FWHM)
 laser_spot_overview.jpglaser_spot_10cm.jpglaser_spot_20cm.jpglaser_spot_30cm.jpg 
  12   Tue Aug 11 14:03:57 2009 Marko Dragicevic Sensor Designs    Screenshots
HEPHY
Gallery
GDS File Viewer
 
 6x 
  13   Fri Aug 14 16:45:25 2009 Stephan Hänsel Module - Setups     

    5mm Inbus-Schlüssel

   3mm Inbus Schlüssel
  
  
  14   Fri Aug 14 19:35:43 2009 Thomas BergauerPt_ITE512intcal    HV=100V except h05-ITE-512 and h06-ITE-512
(runaway, HV off)
h01-Pt: 10uA
  
  15   Fri Aug 14 21:36:17 2009 Markus Friedl Config files    Status of config files as of Friday 14
August 2009 late evening
  
  17   Wed Aug 19 15:41:17 2009 Wolfgang KiesenhoferSiLCangle scan templates    Linie am rechten Seitenrand (in der Vorschau
unten leider nicht gut zu sehen) sollte mit
dem rechten Rand der Basisplatte abschließen
 13x 
  20   Wed Aug 19 22:57:13 2009 Marko Dragicevic How-To    TLU (run from DAQPCHEPHY):
ssh
eudet@eudetmac001.cern.ch
ssh tlupc
  
  33   Thu Aug 20 15:54:45 2009 Manfred ValentanBELLEtemp/humidty logger data    position: underneath telescope. dewpoint
~ 15 degree
test with chiller: running 4 hours
 easylog_under_telescope.gif 
  58   Fri Aug 21 22:42:32 2009 Thomas BergauercommonEUDAQ config file used when running with telescope    
 testfortis_with_eudrb_beam_backpressure_WITH_SILC.conf 
  65   Sat Aug 22 11:54:49 2009 Thomas Bergauercommonbeam profile    beam shifted a bit in vertical direction
downwards since 21. August 09 evening
 20090822_1150_beam_conditions.jpg 
  67   Sat Aug 22 13:28:53 2009 Wolfgang KiesenhoferPt_ITE512runlist for pt-module angle-scan    Preliminary run
list for pt-modules + ite512 + silc1, silc2,
silc5, silc6
  
  71   Sat Aug 22 15:12:44 2009 Thomas Bergauercommonbeam profile    playing with TRIM4 in vertical
plane (setting to 20A current) shifted beamspot
back to center position
 20090822_1511_beam_conditions.jpg 
  80   Sun Aug 23 13:15:42 2009 Marko DragicevicPt_ITE512Current and Humindity during first Run    Current of Pt modules during first run
Data
of the run was dicarded.
Compressed air flow was at ~2 bars
 IandRH_first_Pt_run.pngPicture_1.png 
  84   Sun Aug 23 23:38:27 2009 Georg Auzinger Phone numbers     Georg #70
Wolfgang - Building: 41, Room: 204,
Tel: ?
  
  94   Tue Aug 25 09:00:51 2009 Thomas Bergauer beam conditions    manually changed TRIM3, TRIM4 and TRIM6  magnet_settings_withH6B.802.jpg20090825_0859_beam_conditions.jpg 
  114   Fri Dec 4 12:21:56 2009 Wolfgang Kiesenhofer ITE128 strip correlation kendall tau (preliminary result)    Kendall tau (rank correlation) for module
1 (single layer 1 / h13), module 2 (single
layer 2 / h14),  module 6 (standard
 stripcorr_mod1_thrs5_ktau_ev100000_run002_strip.pdfstripcorr_mod2_thrs5_ktau_ev100000_run002_strip.pdfstripcorr_mod6_thrs5_ktau_ev100000_run002_strip.pdf 
ELOG V3.1.5-fc6679b