| ID | 
Date | 
Author | 
Project | 
Subject | 
Run Number | 
Events | 
StartTime | 
EndTime  | 
Text | 
  | 
| 
  32  
 | 
Thu Aug 20 15:50:58 2009 | 
Manfred Valentan | alignment_laser | slow control: HV graph | all alignemnt_laser runs |   | 20.08.09 10:36 | 4h 43m 52s later | blue graph: h03
 
white graph: h04 | 
    | 
| 
  105  
 | 
Wed Aug 26 07:19:42 2009 | 
Christian Irmler | BELLE | APVDAQ + telescope 31.8 MHz transparent mode + cooling | run044 | 13504 | 26.08.2009  07:18:19 | 26.08.2009  08:46:11  (beam shut down @ 8:00) | Belle DUT, HV=80V,  31.8 MHz, 120 
GeV
 
6 samples, transparent mode | 
   | 
| 
  104  
 | 
Wed Aug 26 01:32:25 2009 | 
Christian Irmler | BELLE | APVDAQ + telescope 40 MHz transparent mode + cooling | run043 | 100600 | 26.08.2009  01:46:38  | 26.08.2009  07:10:14 | Belle DUT, HV=80V,  40 MHz, 120 GeV
 
6 samples, transparent mode
 
w cooling, chiller set to 13 deg, | 
   | 
| 
  103  
 | 
Tue Aug 25 20:21:31 2009 | 
Christian Irmler | BELLE | APVDAQ + telescope 40 MHz transparent mode | run042 | 85189 | 25.08.2009  20:18:18 | 26.08.2009  01:27:12 | Belle DUT, HV=80V,  40 MHz, 120 GeV
 
6 samples, transparent mode
 
no cooling | 
   | 
| 
  100  
 | 
Tue Aug 25 15:33:07 2009 | 
Marko Dragicevic | Pt_ITE512 | Pt_ITE512 12deg NO air!  | run039 | 20k | 25.08.2009 15:35 | 25.08.2009 17:10 | Pt: 12 Grad, HV=200V, 34.4% (start run) 
to 36.1% (end run) RH, beam on, 120GeV
 
ITE512: HV=70V, I=50muA
 
X-Y-Table: | 
   | 
| 
  101  
 | 
Tue Aug 25 17:14:52 2009 | 
Marko Dragicevic | Pt_ITE512 | Pt_ITE512 17deg NO air! | run040 | 20k | 25.08.2009  17:17:11 | 25.08.2009  18:08:57 | Pt: 17 Grad, HV=200V, 36.5% (start run) 
to xx.1% (end run) RH, beam on, 120GeV
 
ITE512: HV=70V, I=51muA
 
X-Y-Table: | 
    | 
| 
  99  
 | 
Tue Aug 25 13:48:30 2009 | 
Marko Dragicevic | Pt_ITE512 | Pt_ITE512 10deg  NO air! | run038 | 20k | 25.08.2009  13:54:54 | 25.08.2009  15:22:38 | Pt: 10 Grad, HV=200V, 31.7% (start run) 
to 33.8% (end run) RH, beam on, 120GeV
 
ITE512: HV=70V, I=50muA
 
X-Y-Table: | 
   | 
| 
  98  
 | 
Tue Aug 25 12:30:04 2009 | 
Marko Dragicevic | Pt_ITE512 | Pt_ITE512 8deg  NO air! | run037 | 20k | 25.08.2009  12:45 | 25.08.2009  13:40:13 | Pt: 8 Grad, HV=200V, 28% (start run) to 
31% (end run) RH, beam on, 120GeV
 
ITE512: HV=70V, I=49.1muA
 
X-Y-Table: | 
   | 
| 
  97  
 | 
Tue Aug 25 11:26:23 2009 | 
Thomas Bergauer | Pt_ITE512 | Pt_ITE512 6deg NO air! | run036 | 20k | 25.08.2009 11:25 | 25.08.2009  12:19:55 | Pt: 6 Grad, HV=200V, 20% (start run) 
to % (end run) RH, beam on, 120GeV
 
ITE512: HV=70V,
 
X-Y-Table: | 
   | 
| 
  96  
 | 
Tue Aug 25 09:53:16 2009 | 
Marko Dragicevic | Pt_ITE512 | Pt_ITE512 4deg  NO air! | run035 | 20k | 25.08.2009  09:50 | 25.08.2009  11:00 | Pt: 4 Grad, HV=200V, 0% (start run) to 
14% (end run) RH, beam on, 120GeV
 
ITE512: HV=70V,
 
X-Y-Table: | 
   | 
| 
  93  
 | 
Tue Aug 25 01:33:18 2009 | 
Georg Auzinger | Pt_ITE512 | Pt_ITE512 0deg air | run033 | 151724 | 25.08.09 01:35:18 | 25.08.2009  08:44:27 | Pt: 0 Grad, HV=200V, 0% RH, beam on, 120GeV
 
ITE512: HV=70V,
 
X-Y-Table: 
x=99.6, y=36 | 
   | 
| 
  102  
 | 
Tue Aug 25 18:22:25 2009 | 
Manfred Valentan | Pt_ITE512 | Pt_ITE512 40deg NO air! (for calibration) | run041 | 10k | 25.08.2009 18:20:30 | 25.08.2009 | Pt: 40 Grad, HV=200V, 36.9% (start run) 
to xx% (end run) RH, beam on, 120GeV
 
ITE512: HV=70V, I=51muA
 
X-Y-Table: | 
   | 
| 
  95  
 | 
Tue Aug 25 09:01:12 2009 | 
Marko Dragicevic | Pt_ITE512 | Pt_ITE512 2deg air  | run034 | 20k | 25.08.09 08:56:18  | 25.08.09 09:45:  | Pt: 2 Grad, HV=200V, 0% RH, beam on, 120GeV
 
ITE512: HV=70V,
 
X-Y-Table: 
x=99.6, y=36 | 
   | 
| 
  87  
 | 
Mon Aug 24 14:23:01 2009 | 
Georg Auzinger | Pt_ITE512 | Pt_ITE512 5deg air | run027 | 20k | 24.08.2009  14:27:07 | 24.08.2009  15:26:20 | Pt: 5 Grad, HV=200V, 0% RH, beam on, 120GeV
 
ITE512: HV=70V,
 
X-Y-Table: 
x=99.6, y=36 | 
   | 
| 
  86  
 | 
Mon Aug 24 13:01:14 2009 | 
Georg Auzinger | Pt_ITE512 | Pt_ITE512 3deg air | run026 | 20k | 24.08.09 11:24:33 | 24.08.2009  14:11:45 | Pt: 3 Grad, HV=200V, 0% RH, beam on, 120GeV
 
ITE512: HV=70V,
 
X-Y-Table: 
x=99.6, y=36 | 
   | 
| 
  92  
 | 
Mon Aug 24 22:12:22 2009 | 
Georg Auzinger | Pt_ITE512 | Pt_ITE512 15deg air | run032 | 19456 | 24.08.09 22:18:08 | 24.08.09 23:25:52 | Pt: 15 Grad, HV=200V, 0% RH, beam on, 120GeV
 
ITE512: HV=70V,
 
X-Y-Table: 
x=99.6, y=36
 
 
 
no | 
   | 
| 
  91  
 | 
Mon Aug 24 22:04:56 2009 | 
Georg Auzinger | Pt_ITE512 | Pt_ITE512 13deg air | run031 | 20k | 24.08.09 20:53:50 | 24.08.09 22:00:49 | Pt: 13 Grad, HV=200V, 0% RH, beam on, 120GeV
 
ITE512: HV=70V,
 
X-Y-Table: 
x=99.6, y=36 | 
   | 
| 
  89  
 | 
Mon Aug 24 16:44:36 2009 | 
Georg Auzinger | Pt_ITE512 | Pt_ITE512 9deg air | run029 | 20k | 24.08.09 17:03:21 | 24.08.09 18:20:55 | Pt: 9 Grad, HV=200V, 0% RH, beam on, 120GeV
 
ITE512: HV=70V,
 
X-Y-Table: 
x=99.6, y=36 | 
   | 
| 
  88  
 | 
Mon Aug 24 15:28:49 2009 | 
Georg Auzinger | Pt_ITE512 | Pt_ITE512 7deg air | run028 | 20k | 24.08.09 15:39:50 | 24.08.09 16:40:54 | Pt: 7 Grad, HV=200V, 0% RH, beam on, 120GeV
 
ITE512: HV=70V,
 
X-Y-Table: 
x=99.6, y=36 | 
   | 
| 
  85  
 | 
Mon Aug 24 11:58:23 2009 | 
Georg Auzinger | Pt_ITE512 | Pt_ITE512 1deg air | run025 | 20k | 24.08.09 11:24:33 | 24.08.09 12:40:25 | Pt: 1 Grad, HV=200V, 0% RH, beam on, 120GeV
 
ITE512: HV=70V,
 
X-Y-Table: 
x=99.6, y=36 | 
   | 
| 
  90  
 | 
Mon Aug 24 18:30:07 2009 | 
Georg Auzinger | Pt_ITE512 | Pt_ITE512 11deg air | run030 | 20k | 24.08.09 18:45:09 | 24.08.09  20:37:04 | Pt: 11 Grad, HV=200V, 0% RH, beam on, 120GeV
 
ITE512: HV=70V,
 
X-Y-Table: 
x=99.6, y=36 | 
   | 
| 
  83  
 | 
Sun Aug 23 17:19:50 2009 | 
Christian Irmler | Pt_ITE512 | internal calibration | cal011 |   | 23.08.2009  16:30:43 | 23.08.2009  17:02:14 | Pt: 1 Grad, HV=200V, 0% RH, intcal, beam 
off
 
ITE512: HV=70V, | 
   | 
| 
  79  
 | 
Sun Aug 23 08:13:31 2009 | 
Thomas Bergauer | ITE128 | 2nd run with ITE128: top position (4mm below center) | run023 | 100k | 23.08.2009  08:06:58 | 23.08.2009  09:30:53 | ITE128
 
HV = 70V, 40MHz, 120 GeV
 
TLU trigger w telescope  | 
   | 
| 
  78  
 | 
Sun Aug 23 02:18:20 2009 | 
Thomas Bergauer | ITE128 | 2nd run with ITE128: top position (3mm below center); during night | run022 | 407895 | 23.08.2009  02:16:21 | 23.08.2009  08:04:09 | ITE128
 
HV = 70V, 40MHz, 120 GeV
 
TLU trigger w telescope  | 
    | 
| 
  77  
 | 
Sun Aug 23 01:46:03 2009 | 
Thomas Bergauer | ITE128 | 2nd run with ITE128: central position | run021 | 100k | 23.08.09 00:10 (ca.) | 23.08.2009  02:15:10 | ITE128
 
HV = 70V, 40MHz, 120 GeV
 
TLU trigger w telescope  | 
    | 
| 
  76  
 | 
Sat Aug 22 23:06:22 2009 | 
Christian Irmler | BELLE | pedestal correction 40 MHz  transparent mode + cooling | pedcorr007 |   | 22.08.2009  23:04:29 | 22.08.2009  23:13:51 | Belle DUT, HV=80V, 40 MHz, beam off
 
1 sample, transparent mode
 
pedestal correction | 
   | 
| 
  74  
 | 
Sat Aug 22 19:19:20 2009 | 
Christian Irmler | BELLE | APVDAQ + telescope 40 MHz transparent mode + cooling | run020 | 75k | 22.08.2009  19:17:29 | 22.08.2009  22:09:53 | Belle DUT, HV=80V, 40 MHz, 120 GeV
 
6 samples, transparent mode
 
chiller set to 13 deg,  2900 | 
   | 
| 
  73  
 | 
Sat Aug 22 15:52:33 2009 | 
Christian Irmler | BELLE | APVDAQ + telescope 31.8 MHz transparent mode + cooling | run019 | 75k | 22.08.2009  15:50:40 | 22.08.2009  19:14:21 | Belle DUT, HV=80V, 31.8 MHz, 120 GeV
 
6 samples, transparent mode
 
chiller set to 13 deg,  2900 | 
   | 
| 
  72  
 | 
Sat Aug 22 15:28:00 2009 | 
Christian Irmler | BELLE | pedestal correction 31.8 MHz  transparent mode + cooling | pedcorr006 |   | 22.08.2009  15:25:35 | 22.08.2009  15:36:00 | Belle DUT, HV=80V, 31.8 MHz, beam off
 
1 sample, transparent mode
 
pedestal correction | 
   | 
| 
  70  
 | 
Sat Aug 22 14:46:12 2009 | 
Christian Irmler | BELLE | internal calibration 31.8 MHz  transparent mode + cooling | cal009 |   | 22.08.2009  14:43:55 | 22.08.2009  15:22:37 | Belle DUT, intcal
 
HV=80V, 31.8 MHz, beam off
 
1 sample, transparent mode | 
   | 
| 
  69  
 | 
Sat Aug 22 13:34:14 2009 | 
Christian Irmler | BELLE | pedestal correction 31.8 MHz  transparent mode (cooling?) | pedcorr005 |   | 22.08.2009  13:31:27 | 22.08.2009  13:41:42 | Belle DUT, intcal
 
HV=80V, 31.8 MHz, beam off
 
1 sample, transparent mode | 
   | 
| 
  68  
 | 
Sat Aug 22 13:30:28 2009 | 
Christian Irmler | BELLE | internal calibration 31.8 MHz  transparent mode (cooling?) | cal008 |   | 22.08.2009  12:50:48 | 22.08.2009  13:29:25 | Belle DUT, intcal
 
HV=80V, 31.8 MHz, beam off
 
1 sample, transparent mode | 
   | 
| 
  66  
 | 
Sat Aug 22 12:12:34 2009 | 
Christian Irmler | BELLE | internal calibration 40 MHz  transparent mode (cooling?) | cal007 |   | 22.08.2009  12:10:32  | 22.08.2009  12:49:09 | Belle DUT, intcal
 
HV=80V, 40 MHz, beam off
 
1 sample, transparent mode | 
   | 
| 
  64  
 | 
Sat Aug 22 11:26:00 2009 | 
Thomas Bergauer | BELLE | APVDAQ + telescope 40 MHz hit mode (cooling?) | run018 | 75k | 22.08.2009  11:16:57 | 22.08.2009  11:58:56 |  HV=80V, 40 MHz, beam on, 120 GeV
 
6 samples, hit mode, hitcut=5
 
chiller 
set to 13 deg.
 
 
 
 
 | 
   | 
| 
  63  
 | 
Sat Aug 22 10:28:50 2009 | 
Thomas Bergauer | BELLE | APVDAQ + telescope 40 MHz hit mode (cooling?) | run017 | 75k | 22.08.2009  10:26:28 | 22.08.2009  11:16:12 |  HV=80V, 40 MHz, beam on, 120 GeV
 
6 samples, hit mode, hitcut=4
 
chiller 
set to 13 deg.
 
 
 
 
 | 
   | 
| 
  62  
 | 
Sat Aug 22 09:44:50 2009 | 
Thomas Bergauer | BELLE | APVDAQ + telescope 31,8 MHz hit mode (cooling?) | run016 | 75k | 22.08.2009  09:42:38 | 22.08.2009  10:24:05 |  HV=80V, 31.8 MHz, beam on, 120 GeV
 
6 samples, hit mode, hitcut=5
 
chiller 
set to 13 deg.
 
 
 
 
 | 
   | 
| 
  61  
 | 
Sat Aug 22 08:32:02 2009 | 
Thomas Bergauer | BELLE | APVDAQ + telescope 31,8 MHz hit mode (cooling?) | run015 | 75k | 22.08.2009  08:15:05 | 22.08.2009  09:25:21 |  HV=80V, 31.8 MHz, beam on, 120 GeV
 
6 samples, hit mode, hitcut=4
 
chiller 
set to 13 deg.
 
 
 
 
 | 
   | 
| 
  60  
 | 
Sat Aug 22 03:27:13 2009 | 
Thomas Bergauer | BELLE | APVDAQ + telescope 31,8 MHz transparent mode (cooling?) | run014 | 75k | 22.08.2009  03:25:23 | 22.08.2009  07:08:09 |  HV=80V, 31.8 MHz, beam on, 120 GeV
 
6 samples
 
chiller set 
to 13 deg.
 
 
 
 
 | 
   | 
| 
  59  
 | 
Sat Aug 22 01:06:34 2009 | 
Christian Irmler | BELLE | APVDAQ + telescope 40 MHz transparent mode (cooling?) | run013 | 75000 | 21.08.2009  23:49:38  | 22.08.2009  03:21:48 | Belle DUT, tranparent mode
 
HV=80V, 40 MHz, beam on, 120 GeV
 
6 samples | 
   | 
| 
  57  
 | 
Fri Aug 21 18:35:13 2009 | 
Christian Irmler | BELLE | APVDAQ  + telescope 31.8 MHz transparent mode | run012 | 60000 | 21.08.2009  18:31:01 | 21.08.2009  23:25:03 | 4 Belle DUTs
 
HV=80V, 31.8 MHz, 6 sample, 120 GeV
 
external clock source | 
   | 
| 
  56  
 | 
Fri Aug 21 18:07:57 2009 | 
Christian Irmler | BELLE | APVDAQ  standalone 31.8 MHz | pedcorr004 |   | 21.08.2009  17:49:10 | 21.08.2009  18:24:31 | 4 Belle DUTs
 
HV=80V, 31.8 MHz
 
pedestal correction | 
   | 
| 
  53  
 | 
Fri Aug 21 15:27:08 2009 | 
Christian Irmler | BELLE | internal calibration 31.8 MHz hit mode | cal005 |   | 21.08.2009  15:34:43 | 21.08.2009  16:29:47  | Belle DUT, intcal
 
HV=80V, 31.8 MHz, no beam
 
hit mode | 
   | 
| 
  52  
 | 
Fri Aug 21 14:18:11 2009 | 
Christian Irmler | BELLE | internal calibration 31.8 MHz transparent mode | cal004 |   | 21.08.2009  14:21:40 | 21.08.2009  15:01:24 | Belle DUT, intcal
 
HV=80V, 31.8 MHz, no beam
 
transparent mode | 
   | 
| 
  49  
 | 
Fri Aug 21 12:08:44 2009 | 
Christian Irmler | BELLE | APVDAQ  standalone 40 MHz | pedcorr003 |   | 21.08.2009  12:08:33 | 21.08.2009  12:18:45  | 4 Belle DUTs
 
HV=80V, 40 MHz
 
pedestal correction  | 
   | 
| 
  48  
 | 
Fri Aug 21 12:06:39 2009 | 
Christian Irmler | BELLE | APVDAQ  standalone hit mode 40 MHz | run009 | 75000 | 21.08.2009  11:48:22 | 21.08.2009  12:01:53 | 4 Belle DUTs
 
HV=80V, 40 MHz, 6 sample, 120 GeV
 
  | 
   | 
| 
  47  
 | 
Fri Aug 21 12:06:29 2009 | 
Christian Irmler | BELLE | APVDAQ  standalone hit mode 40 MHz | run008 | 75000 | 21.08.2009  11:15:09 | 21.08.2009  11:29:53 | 4 Belle DUTs
 
HV=80V, 40 MHz, 6 sample, 120 GeV
 
  | 
   | 
| 
  46  
 | 
Fri Aug 21 12:06:06 2009 | 
Christian Irmler | BELLE | APVDAQ  standalone 40 MHz | run007 | interrupted | 21.08.2009  11:06:45 | 21.08.2009  11:10:40 | 4 Belle DUTs
 
HV=80V, 40 MHz, 6 sample, 120 GeV
 
  | 
   | 
| 
  45  
 | 
Fri Aug 21 12:05:31 2009 | 
Christian Irmler | BELLE | APVDAQ  standalone 40 MHz hit mode | run006 | interrupted | 21.08.2009  10:41:51 | 21.08.2009  10:54:37 | 4 Belle DUTs
 
HV=80V, 40 MHz, 6 sample, 120 GeV
 
  | 
   | 
| 
  44  
 | 
Fri Aug 21 06:34:39 2009 | 
Christian Irmler | BELLE | APVDAQ + telescope 40 MHz | run005 | 75000 | 21.08.2009  06:10:41 | 21.08.2009  10:37:33 | was originally  run004, renamed after 
run was stopped to avoid duplicate names
 
4 Belle DUTs | 
   | 
| 
  43  
 | 
Fri Aug 21 06:31:29 2009 | 
Christian Irmler | BELLE | APVDAQ + telescope | run6873 | 80173 | 21.08.2009  00:47:38 | 21.08.2009  06:07:02 | 4 Belle DUTs
 
HV=80V, 40 MHz, 6 sample, 120 GeV
 
  | 
   | 
| 
  42  
 | 
Fri Aug 21 06:24:10 2009 | 
Christian Irmler | BELLE | APVDAQ + telescope (beam alignement) | run6872 | 5785 | 21.08.2009  00:12:26 | 21.08.2009  00:27:11 | 4 Belle DUTs
 
HV=80V, 40 MHz, 6 sample, 120 GeV
 
  | 
   | 
| 
  41  
 | 
Fri Aug 21 06:16:15 2009 | 
Christian Irmler | BELLE | internal calibration 40 MHz transparent mode | cal003 |   | 20.08.2009  23:27:12 | 21.08.2009  00:05:16 | Belle DUT, intcal
 
HV=80V, 40 MHz, no beam
 
transparent mode | 
   | 
| 
  40  
 | 
Thu Aug 20 20:06:06 2009 | 
Manfred Valentan | alignment_laser | low intensity (like laser001), but far sensor in 2nd position | laser007 | 50k | 20.08.2009  19:57:52 | 20.08.2009  20:05:34 | HV=70V, 40MHz, 6 samples, beam off, far 
sensor in 2nd position
 
5ns trigger pulse width, 1 kHz trigger, | 
   | 
| 
  39  
 | 
Thu Aug 20 19:56:21 2009 | 
Manfred Valentan | alignment_laser | background mesurement with laser OFF | laser006 | 10k | 20.08.2009  19:54:04 | 20.08.2009  19:55:38 |   | 
   | 
| 
  38  
 | 
Thu Aug 20 19:46:02 2009 | 
Manfred Valentan | alignment_laser | laser at high intensity, far sensor in 2nd position | laser005 | 50000 | 20.08.2009  19:45:16 | 20.08.2009  19:53:01 | far sensor in 2nd position; laser at high 
intensity (saturation on near sensor, good 
signal on far sensor) | 
   | 
| 
  37  
 | 
Thu Aug 20 19:35:06 2009 | 
Manfred Valentan | alignment_laser | laser at high intensity (saturation on near sensor, good signal on far sensor) | laser004 | 100000 | 20.08.2009  19:18:47 | 20.08.2009  19:35:05 | HV=70V, 40MHz, 6 samples, beam off
 
5ns trigger pulse width, 1 kHz trigger, 
 | 
    | 
| 
  36  
 | 
Thu Aug 20 19:15:29 2009 | 
Manfred Valentan | alignment_laser | laser on | laser003 | 10000 | 20.08.2009  19:13:04 | 20.08.2009  19:14:49 | HV=70V, 40MHz, 6 samples, beam off
 
5ns trigger pulse width, 1 kHz trigger, 
 | 
   | 
| 
  35  
 | 
Thu Aug 20 19:12:23 2009 | 
Manfred Valentan | alignment_laser | background mesurement with laser OFF | laser002 | 10000 | 20.08.2009  19:10:09 | 20.08.2009  19:11:57 |   | 
   | 
| 
  31  
 | 
Thu Aug 20 15:15:33 2009 | 
Christian Irmler | alignment_beam | bottom center on sensor, point 6 | run6869 | 615 (beam manipulation by students) | 20.08.2009  14:56:16  | 20.08.2009  15:14:11 | 2 alignment modules
 
location in beam direction: h04-h03
 
beam in center of sensor | 
   | 
| 
  30  
 | 
Thu Aug 20 14:31:29 2009 | 
Christian Irmler | alignment_beam | bottom left on sensor, point 5 | run6868 | 10600 | 20.08.2009  14:36:00 | 20.08.2009  14:51:57 | 2 alignment modules
 
location in beam direction: h04-h03
 
beam in center of sensor | 
   | 
| 
  29  
 | 
Thu Aug 20 12:50:59 2009 | 
Christian Irmler | alignment_beam | bottom right on sensor, point 4 | run6866 | 8467 | 20.08.2009  12:51:04 | 20.08.2009  13:05:01 | 2 alignement modules
 
location in beam direction: h04-h03
 
beam in center of sensor | 
   | 
| 
  28  
 | 
Thu Aug 20 12:35:13 2009 | 
Christian Irmler | alignment_beam | top right on sensor, point 3 | run6865 | 10600 | 20.08.2009  12:31:35 | 20.08.2009  12:48:04 | 2 alignement modules
 
location in beam direction: h04-h03
 
beam in center of sensor | 
   | 
| 
  27  
 | 
Thu Aug 20 12:18:40 2009 | 
Christian Irmler | alignment_beam | top left on sensor, point 2 | run6863 (telescope 6864) | 10600 | 20.08.2009  12:07:28 | 20.08.2009  12:25:57 | 2 alignement modules
 
location in beam direction: h04-h03
 
beam in center of sensor | 
   | 
| 
  26  
 | 
Thu Aug 20 11:38:11 2009 | 
Christian Irmler | alignment_beam | top center, point 7 | run6861 (+6862) | 10600 | 20.08.2009  11:36:35 | 20.08.2009  11:53:51 | 2 alignement modules
 
location in beam direction: h04-h03
 
beam in center of sensor | 
   | 
| 
  25  
 | 
Thu Aug 20 11:23:04 2009 | 
Christian Irmler | alignment_beam | beam in center of sensor w telescope | run004 (6860 telescope) | 10600 | 20.08.2009  11:09:50  | 20.08.2009  11:25:16 | 2 alignement modules
 
location in beam direction: h04-h03
 
beam in center of sensor | 
   | 
| 
  24  
 | 
Thu Aug 20 11:05:26 2009 | 
Christian Irmler | alignment_beam | pedeatal correction | pedcorr002 |   | 20.08.2009  11:05:41 | 20.08.2009  11:09:35 | 2 alignement modules
 
location in beam direction: h04-h03
 
HV=70V, 40MHz, 1 sample | 
   | 
| 
  23  
 | 
Thu Aug 20 10:48:39 2009 | 
Christian Irmler | alignment_beam | internal calibration | cal002 |   | 20.08.2009  10:49:07 | 20.08.2009  10:59:43 | 2 alignement modules
 
location in beam direction: h04-h03
 
HV=70V, 40MHz, 1 sample | 
   | 
| 
  21  
 | 
Thu Aug 20 00:16:45 2009 | 
Christian Irmler | ITE128 | pedestal correction | pedcorr001 |   | 20.08.2009  00:14:21 | 20.08.2009  00:24:28 | DUT: SiLC 08_1, 6 x ITE128, SiLC 08_2
 
HV = 70V, 40MHz
 
pedestal correction | 
   | 
| 
  19  
 | 
Wed Aug 19 22:56:07 2009 | 
Christian Irmler | ITE128 | ITE128 shooting into strips w pitch adapter, upper position | run002 | 100600 | 19.08.2009  22:54:23 | 20.08.2009  00:11:31 | DUT: SiLC 08_1, 6 x ITE128, SiLC 08_2
 
HV = 70V, 40MHz, 120 GeV
 
TLU trigger, w/o telescope | 
   | 
| 
  18  
 | 
Wed Aug 19 20:43:14 2009 | 
Christian Irmler | ITE128 | ITE128 shooting into strips w/o pitch adapter, low position | run001 | 100600 | 19.08.2009  20:42:08 | 19.08.2009  22:54:21 | DUT: SiLC 08_1, 6 x ITE128, SiLC 08_2
 
HV = 70V, 40MHz, 120 GeV
 
TLU trigger, w/o telescope | 
   | 
| 
  50  
 | 
Fri Aug 21 12:22:43 2009 | 
Christian Irmler | BELLE | APVDAQ  standalone 31.8 MHz hit mode | run010 | 75000 | 21.08.2009  12:53:02 |  21.08.2009  13:35:01 | 4 Belle DUTs
 
HV=80V, 31.8 MHz, 6 sample, 120 GeV
 
switched to external clock source | 
   | 
| 
  1  
 | 
Mon Jul  6 12:22:47 2009 | 
Stephan Hänsel | SiLC | Measurements - hybrids with APV |   |   |   |   | Pt Modules: 
 
Hybrids with 4 APVs:
 
   
  | 
   | 
| 
  2  
 | 
Mon Jul  6 12:24:53 2009 | 
Stephan Hänsel | SiLC | Module Drawings |   |   |   |   |  Pt Modules: 
 
 
     
3D-View 
 
    technical drawings:
 
 | 
   | 
| 
  5  
 | 
Mon Jul  6 12:29:20 2009 | 
Stephan Hänsel | SiLC | Sensors - layout |   |   |   |   |  Pt Modules: 
 
CMS OB1 Sensors:
 
 
     | 
    | 
| 
  6  
 | 
Mon Jul  6 14:30:45 2009 | 
Marko Dragicevic |   | Equipment List |   |   |   |   | [B]Slow Control:[/B]
 
Source Measurement Unit Keithley K2410, Inv.Nr.: 
540-702, 2000EUR
 | 
    | 
| 
  7  
 | 
Mon Jul  6 16:22:36 2009 | 
Stephan Hänsel | SiLC | Measurements - Sensors |   |   |   |   |  Pt Modules: 
 
OB1-Sensors:
 
     30210331516116 | 
   | 
| 
  8  
 | 
Mon Jul  6 16:23:51 2009 | 
Stephan Hänsel | SiLC | Module Components |   |   |   |   |  Pt Modules: 
 
 
Pt-1: | 
   | 
| 
  9  
 | 
Thu Jul  9 10:29:58 2009 | 
Stephan Hänsel | SiLC | Measurements - Modules |   |   |   |   |  Pt Modules: 
 
- Sensoren sind Luftfeuhtigkeitsempfindlich | 
   | 
| 
  10  
 | 
Fri Jul 17 14:03:21 2009 | 
Stephan Hänsel |   | What to measure |   |   |   |   |  Origami
 
 
 
Testbeam08 Module | 
   | 
| 
  11  
 | 
Fri Jul 31 19:23:26 2009 | 
Thomas Bergauer |   | Laser Spot size |   |   |   |   | 10cm nach Kollimator: Durchmesser 1.45mm (FWHM)
 
20cm 
nach Kollimator: Durchmesser 1,54mm (FWHM) | 
       | 
| 
  12  
 | 
Tue Aug 11 14:03:57 2009 | 
Marko Dragicevic |   | Sensor Designs |   |   |   |   | Screenshots
 
HEPHY 
Gallery
 
GDS File Viewer
 
  | 
 6x   | 
| 
  13  
 | 
Fri Aug 14 16:45:25 2009 | 
Stephan Hänsel |   | Module - Setups |   |   |   |   |  
 
 
    5mm Inbus-Schlüssel
 
 
   3mm Inbus Schlüssel
 
   | 
   | 
| 
  14  
 | 
Fri Aug 14 19:35:43 2009 | 
Thomas Bergauer | Pt_ITE512 | intcal |   |   |   |   | HV=100V except h05-ITE-512 and h06-ITE-512 
(runaway, HV off)
 
h01-Pt: 10uA | 
   | 
| 
  15  
 | 
Fri Aug 14 21:36:17 2009 | 
Markus Friedl |   | Config files |   |   |   |   | Status of config files as of Friday 14 
August 2009 late evening
 
 | 
   | 
| 
  16  
 | 
Wed Aug 19 15:37:37 2009 | 
Christian Irmler | ITE128 | internal calibration | cal001 |   | 15:31:29 |   | 8 modules, HV=70V, 40MHz, 1 sample
 
no beam 
 
APV 4,5: inverter off, higher baseline | 
   | 
| 
  17  
 | 
Wed Aug 19 15:41:17 2009 | 
Wolfgang Kiesenhofer | SiLC | angle scan templates |   |   |   |   | Linie am rechten Seitenrand (in der Vorschau 
unten leider nicht gut zu sehen) sollte mit 
dem rechten Rand der Basisplatte abschließen | 
 13x   | 
| 
  20  
 | 
Wed Aug 19 22:57:13 2009 | 
Marko Dragicevic |   | How-To |   |   |   |   | TLU (run from DAQPCHEPHY):
 
ssh 
eudet@eudetmac001.cern.ch
 
ssh tlupc | 
   | 
| 
  22  
 | 
Thu Aug 20 00:31:45 2009 | 
Christian Irmler | ITE128 | ITE128 shooting into strips w pitch adapter, upper position | run003 | 100600 | 20.08.2009  00:27:36 |   | DUT: SiLC 08_1, 6 x ITE128, SiLC 08_2
 
HV = 70V, 40MHz, 120 GeV
 
TLU trigger, w/o telescope | 
   | 
| 
  33  
 | 
Thu Aug 20 15:54:45 2009 | 
Manfred Valentan | BELLE | temp/humidty logger data |   |   |   |   | position: underneath telescope. dewpoint 
~ 15 degree
 
test with chiller: running 4 hours | 
    | 
| 
  34  
 | 
Thu Aug 20 18:56:25 2009 | 
Christian Irmler | alignment_laser | laser | laser001 | 100000 | 20.08.2009  18:48:53 |   | 2 alignment modules
 
location in beam direction: h04-h03
 
laser is shooting on h03 (opposite | 
   | 
| 
  51  
 | 
Fri Aug 21 13:38:20 2009 | 
Christian Irmler | BELLE | APVDAQ  standalone 31.8 MHz hit mode | run011 | 75000 | 21.08.2009  13:35:25  |   | 4 Belle DUTs
 
HV=80V, 31.8 MHz, 6 sample, 120 GeV
 
external clock source | 
   | 
| 
  54  
 | 
Fri Aug 21 16:37:22 2009 | 
Christian Irmler | BELLE | internal calibration 40 MHz hit mode | cal006 |   | 21.08.2009  16:30:33 |   | Belle DUT, intcal
 
HV=80V, 40 MHz, no beam
 
hit mode | 
   | 
| 
  55  
 | 
Fri Aug 21 17:14:58 2009 | 
Wolfgang Kiesenhofer |   | S/N Histograms Raw (no data selection) | run001 (strips), run002 (pitch adapter), run003 (upper edge) |   |   |   |   | 
      | 
| 
  58  
 | 
Fri Aug 21 22:42:32 2009 | 
Thomas Bergauer | common | EUDAQ config file used when running with telescope |   |   |   |   | 
 
 | 
    | 
| 
  65  
 | 
Sat Aug 22 11:54:49 2009 | 
Thomas Bergauer | common | beam profile |   |   |   |   | beam shifted a bit in vertical direction 
downwards since 21. August 09 evening
 
 | 
    | 
| 
  67  
 | 
Sat Aug 22 13:28:53 2009 | 
Wolfgang Kiesenhofer | Pt_ITE512 | runlist for pt-module angle-scan |   |   |   |   | Preliminary run 
list for pt-modules + ite512 + silc1, silc2, 
silc5, silc6 | 
   | 
| 
  71  
 | 
Sat Aug 22 15:12:44 2009 | 
Thomas Bergauer | common | beam profile |   |   |   |   | playing with TRIM4 in vertical 
plane (setting to 20A current) shifted beamspot 
back to center position | 
    | 
| 
  75  
 | 
Sat Aug 22 22:14:50 2009 | 
Christian Irmler | BELLE | internal calibration 40 MHz  transparent mode + cooling | cal010 |   | 22.08.2009  22:24:22 |   | Belle DUT, intcal
 
HV=80V, 40 MHz, beam off
 
1 sample, transparent mode | 
   | 
| 
  80  
 | 
Sun Aug 23 13:15:42 2009 | 
Marko Dragicevic | Pt_ITE512 | Current and Humindity during first Run |   |   |   |   | Current of Pt modules during first run
 
Data 
of the run was dicarded.
 
Compressed air flow was at ~2 bars | 
     | 
| 
  81  
 | 
Sun Aug 23 14:03:14 2009 | 
Manfred Valentan | Pt_ITE512 | Pt & ITE512 center position, 1 deg | run024 | 20000 | 23.08.2009 13:59:06 |   | Pt: 1 Grad, HV=200V, 0% RH
 
ITE512: HV=70V
 
X-Y-Table: x=99.6, y=36 | 
   | 
| 
  82  
 | 
Sun Aug 23 17:18:25 2009 | 
Christian Irmler | Pt_ITE512 | pedestal correction | pedcorr008 |   | 23.08.2009  17:17:36  |   | Pt: 1 Grad, HV=200V, 0% RH, intcal, beam 
off
 
ITE512: HV=70V, | 
   | 
| 
  84  
 | 
Sun Aug 23 23:38:27 2009 | 
Georg Auzinger |   | Phone numbers |   |   |   |   |  Georg #70
 
Wolfgang - Building: 41, Room: 204, 
Tel: ? | 
   | 
| 
  94  
 | 
Tue Aug 25 09:00:51 2009 | 
Thomas Bergauer |   | beam conditions |   |   |   |   | manually changed TRIM3, TRIM4 and TRIM6 | 
     | 
| 
  106  
 | 
Wed Aug 26 14:26:13 2009 | 
Wolfgang Kiesenhofer | ITE128 | S/N final Single-Metal | run001 & run002 |   |   |   | Most probable S/N, Single Metal Layer, 
2D histogram fitted with langau in 5 bin 
(strips) slices. | 
    | 
| 
  107  
 | 
Wed Sep  2 14:15:17 2009 | 
Wolfgang Kiesenhofer | ITE128 | ITE 128 Cross-Talk | run002 |   |   |   | Preliminary strip correlation (Kendalls 
Tau) for threshold = 3*stripnoise. | 
    | 
| 
  114  
 | 
Fri Dec  4 12:21:56 2009 | 
Wolfgang Kiesenhofer |   | ITE128 strip correlation kendall tau (preliminary result) |   |   |   |   | Kendall tau (rank correlation) for module 
1 (single layer 1 / h13), module 2 (single 
layer 2 / h14),  module 6 (standard | 
      |