Fri Aug 21 12:05:31 2009, Christian Irmler, BELLE, APVDAQ standalone 40 MHz hit mode, run006, interrupted, 21.08.2009 10:41:51, 21.08.2009 10:54:37
|
4 Belle DUTs
HV=80V, 40 MHz, 6 sample, 120 GeV
|
Fri Aug 21 12:06:06 2009, Christian Irmler, BELLE, APVDAQ standalone 40 MHz, run007, interrupted, 21.08.2009 11:06:45, 21.08.2009 11:10:40
|
4 Belle DUTs
HV=80V, 40 MHz, 6 sample, 120 GeV
|
Tue Aug 25 20:21:31 2009, Christian Irmler, BELLE, APVDAQ + telescope 40 MHz transparent mode, run042, 85189, 25.08.2009 20:18:18, 26.08.2009 01:27:12
|
Belle DUT, HV=80V, 40 MHz, 120 GeV
6 samples, transparent mode
no cooling |
Thu Aug 20 12:50:59 2009, Christian Irmler, alignment_beam, bottom right on sensor, point 4, run6866, 8467, 20.08.2009 12:51:04, 20.08.2009 13:05:01
|
2 alignement modules
location in beam direction: h04-h03
beam in center of sensor |
Fri Aug 21 06:31:29 2009, Christian Irmler, BELLE, APVDAQ + telescope, run6873, 80173, 21.08.2009 00:47:38, 21.08.2009 06:07:02
|
4 Belle DUTs
HV=80V, 40 MHz, 6 sample, 120 GeV
|
Sat Aug 22 03:27:13 2009, Thomas Bergauer, BELLE, APVDAQ + telescope 31,8 MHz transparent mode (cooling?), run014, 75k, 22.08.2009 03:25:23, 22.08.2009 07:08:09
|
HV=80V, 31.8 MHz, beam on, 120 GeV
6 samples
chiller set to 13 deg.
f=31.8 MHz |
Sat Aug 22 08:32:02 2009, Thomas Bergauer, BELLE, APVDAQ + telescope 31,8 MHz hit mode (cooling?), run015, 75k, 22.08.2009 08:15:05, 22.08.2009 09:25:21
|
HV=80V, 31.8 MHz, beam on, 120 GeV
6 samples, hit mode, hitcut=4
chiller set to 13 deg.
f=31.8 |
Sat Aug 22 09:44:50 2009, Thomas Bergauer, BELLE, APVDAQ + telescope 31,8 MHz hit mode (cooling?), run016, 75k, 22.08.2009 09:42:38, 22.08.2009 10:24:05
|
HV=80V, 31.8 MHz, beam on, 120 GeV
6 samples, hit mode, hitcut=5
chiller set to 13 deg.
f=31.8 |
Sat Aug 22 10:28:50 2009, Thomas Bergauer, BELLE, APVDAQ + telescope 40 MHz hit mode (cooling?), run017, 75k, 22.08.2009 10:26:28, 22.08.2009 11:16:12
|
HV=80V, 40 MHz, beam on, 120 GeV
6 samples, hit mode, hitcut=4
chiller set to 13 deg.
f=40 |
Sat Aug 22 11:26:00 2009, Thomas Bergauer, BELLE, APVDAQ + telescope 40 MHz hit mode (cooling?), run018, 75k, 22.08.2009 11:16:57, 22.08.2009 11:58:56
|
HV=80V, 40 MHz, beam on, 120 GeV
6 samples, hit mode, hitcut=5
chiller set to 13 deg.
f=40 |
Sat Aug 22 15:52:33 2009, Christian Irmler, BELLE, APVDAQ + telescope 31.8 MHz transparent mode + cooling, run019, 75k, 22.08.2009 15:50:40, 22.08.2009 19:14:21
|
Belle DUT, HV=80V, 31.8 MHz, 120 GeV
6 samples, transparent mode
chiller set to 13 deg, 2900 rpm |
Sat Aug 22 19:19:20 2009, Christian Irmler, BELLE, APVDAQ + telescope 40 MHz transparent mode + cooling, run020, 75k, 22.08.2009 19:17:29, 22.08.2009 22:09:53
|
Belle DUT, HV=80V, 40 MHz, 120 GeV
6 samples, transparent mode
chiller set to 13 deg, 2900 rpm |
Fri Aug 21 06:34:39 2009, Christian Irmler, BELLE, APVDAQ + telescope 40 MHz, run005, 75000, 21.08.2009 06:10:41, 21.08.2009 10:37:33
|
was originally run004, renamed after run was stopped to avoid duplicate names
4 Belle DUTs
HV=80V, 40 MHz, 6 sample, 120 GeV |
Fri Aug 21 12:06:29 2009, Christian Irmler, BELLE, APVDAQ standalone hit mode 40 MHz, run008, 75000, 21.08.2009 11:15:09, 21.08.2009 11:29:53
|
4 Belle DUTs
HV=80V, 40 MHz, 6 sample, 120 GeV
|
Fri Aug 21 12:06:39 2009, Christian Irmler, BELLE, APVDAQ standalone hit mode 40 MHz, run009, 75000, 21.08.2009 11:48:22, 21.08.2009 12:01:53
|
4 Belle DUTs
HV=80V, 40 MHz, 6 sample, 120 GeV
|
Fri Aug 21 12:22:43 2009, Christian Irmler, BELLE, APVDAQ standalone 31.8 MHz hit mode, run010, 75000, 21.08.2009 12:53:02, 21.08.2009 13:35:01
|
4 Belle DUTs
HV=80V, 31.8 MHz, 6 sample, 120 GeV
switched to external clock source |
Fri Aug 21 13:38:20 2009, Christian Irmler, BELLE, APVDAQ standalone 31.8 MHz hit mode, run011, 75000, 21.08.2009 13:35:25 ,
|
4 Belle DUTs
HV=80V, 31.8 MHz, 6 sample, 120 GeV
external clock source |
Sat Aug 22 01:06:34 2009, Christian Irmler, BELLE, APVDAQ + telescope 40 MHz transparent mode (cooling?), run013, 75000, 21.08.2009 23:49:38 , 22.08.2009 03:21:48
|
Belle DUT, tranparent mode
HV=80V, 40 MHz, beam on, 120 GeV
6 samples |
Thu Aug 20 15:15:33 2009, Christian Irmler, alignment_beam, bottom center on sensor, point 6, run6869, 615 (beam manipulation by students), 20.08.2009 14:56:16 , 20.08.2009 15:14:11
|
2 alignment modules
location in beam direction: h04-h03
beam in center of sensor |
Fri Aug 21 18:35:13 2009, Christian Irmler, BELLE, APVDAQ + telescope 31.8 MHz transparent mode, run012, 60000, 21.08.2009 18:31:01, 21.08.2009 23:25:03
|
4 Belle DUTs
HV=80V, 31.8 MHz, 6 sample, 120 GeV
external clock source |
Fri Aug 21 06:24:10 2009, Christian Irmler, BELLE, APVDAQ + telescope (beam alignement), run6872, 5785, 21.08.2009 00:12:26, 21.08.2009 00:27:11
|
4 Belle DUTs
HV=80V, 40 MHz, 6 sample, 120 GeV
|
Thu Aug 20 20:06:06 2009, Manfred Valentan, alignment_laser, low intensity (like laser001), but far sensor in 2nd position, laser007, 50k, 20.08.2009 19:57:52, 20.08.2009 20:05:34
|
HV=70V, 40MHz, 6 samples, beam off, far sensor in 2nd position
5ns trigger pulse width, 1 kHz trigger,
current_laser=10mA, |
Thu Aug 20 19:46:02 2009, Manfred Valentan, alignment_laser, laser at high intensity, far sensor in 2nd position, laser005, 50000, 20.08.2009 19:45:16, 20.08.2009 19:53:01
|
far sensor in 2nd position; laser at high intensity (saturation on near sensor, good signal on far sensor)
HV=70V, 40MHz, 6 samples, beam off, far sensor in 2nd position
5ns trigger pulse width, 1 kHz trigger, |
Sun Aug 23 02:18:20 2009, Thomas Bergauer, ITE128, 2nd run with ITE128: top position (3mm below center); during night, run022, 407895, 23.08.2009 02:16:21, 23.08.2009 08:04:09
|
ITE128
HV = 70V, 40MHz, 120 GeV
TLU trigger w telescope |
Mon Aug 24 11:58:23 2009, Georg Auzinger, Pt_ITE512, Pt_ITE512 1deg air, run025, 20k, 24.08.09 11:24:33, 24.08.09 12:40:25
|
Pt: 1 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table: x=99.6, y=36 |
Mon Aug 24 13:01:14 2009, Georg Auzinger, Pt_ITE512, Pt_ITE512 3deg air, run026, 20k, 24.08.09 11:24:33, 24.08.2009 14:11:45
|
Pt: 3 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table: x=99.6, y=36 |
Mon Aug 24 14:23:01 2009, Georg Auzinger, Pt_ITE512, Pt_ITE512 5deg air, run027, 20k, 24.08.2009 14:27:07, 24.08.2009 15:26:20
|
Pt: 5 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table: x=99.6, y=36 |
Mon Aug 24 15:28:49 2009, Georg Auzinger, Pt_ITE512, Pt_ITE512 7deg air, run028, 20k, 24.08.09 15:39:50, 24.08.09 16:40:54
|
Pt: 7 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table: x=99.6, y=36 |
Mon Aug 24 16:44:36 2009, Georg Auzinger, Pt_ITE512, Pt_ITE512 9deg air, run029, 20k, 24.08.09 17:03:21, 24.08.09 18:20:55
|
Pt: 9 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table: x=99.6, y=36 |
Mon Aug 24 18:30:07 2009, Georg Auzinger, Pt_ITE512, Pt_ITE512 11deg air, run030, 20k, 24.08.09 18:45:09, 24.08.09 20:37:04
|
Pt: 11 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table: x=99.6, y=36 |
Mon Aug 24 22:04:56 2009, Georg Auzinger, Pt_ITE512, Pt_ITE512 13deg air, run031, 20k, 24.08.09 20:53:50, 24.08.09 22:00:49
|
Pt: 13 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table: x=99.6, y=36 |
Tue Aug 25 09:01:12 2009, Marko Dragicevic, Pt_ITE512, Pt_ITE512 2deg air , run034, 20k, 25.08.09 08:56:18 , 25.08.09 09:45:
|
Pt: 2 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table: x=99.6, y=36 |
Tue Aug 25 09:53:16 2009, Marko Dragicevic, Pt_ITE512, Pt_ITE512 4deg NO air!, run035, 20k, 25.08.2009 09:50, 25.08.2009 11:00
|
Pt: 4 Grad, HV=200V, 0% (start run) to 14% (end run) RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table: x=99.6, y=36 |
Tue Aug 25 11:26:23 2009, Thomas Bergauer, Pt_ITE512, Pt_ITE512 6deg NO air!, run036, 20k, 25.08.2009 11:25, 25.08.2009 12:19:55
|
Pt: 6 Grad, HV=200V, 20% (start run) to % (end run) RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table: x=99.6, y=36
MOEGLICHERWEISE WAR EIN MODUL AUF 8 GRAD |
Tue Aug 25 12:30:04 2009, Marko Dragicevic, Pt_ITE512, Pt_ITE512 8deg NO air!, run037, 20k, 25.08.2009 12:45, 25.08.2009 13:40:13
|
Pt: 8 Grad, HV=200V, 28% (start run) to 31% (end run) RH, beam on, 120GeV
ITE512: HV=70V, I=49.1muA
X-Y-Table: x=99.6, y=36 |
Tue Aug 25 13:48:30 2009, Marko Dragicevic, Pt_ITE512, Pt_ITE512 10deg NO air!, run038, 20k, 25.08.2009 13:54:54, 25.08.2009 15:22:38
|
Pt: 10 Grad, HV=200V, 31.7% (start run) to 33.8% (end run) RH, beam on, 120GeV
ITE512: HV=70V, I=50muA
X-Y-Table: x=99.6, y=36 |
Tue Aug 25 15:33:07 2009, Marko Dragicevic, Pt_ITE512, Pt_ITE512 12deg NO air! , run039, 20k, 25.08.2009 15:35, 25.08.2009 17:10
|
Pt: 12 Grad, HV=200V, 34.4% (start run) to 36.1% (end run) RH, beam on, 120GeV
ITE512: HV=70V, I=50muA
X-Y-Table: x=99.6, y=36 |
Tue Aug 25 17:14:52 2009, Marko Dragicevic, Pt_ITE512, Pt_ITE512 17deg NO air!, run040, 20k, 25.08.2009 17:17:11, 25.08.2009 18:08:57
|
Pt: 17 Grad, HV=200V, 36.5% (start run) to xx.1% (end run) RH, beam on, 120GeV
ITE512: HV=70V, I=51muA
X-Y-Table: x=99.6, y=36 |
Sun Aug 23 14:03:14 2009, Manfred Valentan, Pt_ITE512, Pt & ITE512 center position, 1 deg, run024, 20000, 23.08.2009 13:59:06,
|
Pt: 1 Grad, HV=200V, 0% RH
ITE512: HV=70V
X-Y-Table: x=99.6, y=36 |
Mon Aug 24 22:12:22 2009, Georg Auzinger, Pt_ITE512, Pt_ITE512 15deg air, run032, 19456, 24.08.09 22:18:08, 24.08.09 23:25:52
|
Pt: 15 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table: x=99.6, y=36
no beam
--> run stopped after 19456 events |
Tue Aug 25 01:33:18 2009, Georg Auzinger, Pt_ITE512, Pt_ITE512 0deg air, run033, 151724, 25.08.09 01:35:18, 25.08.2009 08:44:27
|
Pt: 0 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table: x=99.6, y=36 |
Wed Aug 26 07:19:42 2009, Christian Irmler, BELLE, APVDAQ + telescope 31.8 MHz transparent mode + cooling, run044, 13504, 26.08.2009 07:18:19, 26.08.2009 08:46:11 (beam shut down @ 8:00)
|
Belle DUT, HV=80V, 31.8 MHz, 120 GeV
6 samples, transparent mode
w cooling, chiller set to 13 deg, 2900 rpm |
Thu Aug 20 19:56:21 2009, Manfred Valentan, alignment_laser, background mesurement with laser OFF, laser006, 10k, 20.08.2009 19:54:04, 20.08.2009 19:55:38
|
|
Tue Aug 25 18:22:25 2009, Manfred Valentan, Pt_ITE512, Pt_ITE512 40deg NO air! (for calibration), run041, 10k, 25.08.2009 18:20:30, 25.08.2009
|
Pt: 40 Grad, HV=200V, 36.9% (start run) to xx% (end run) RH, beam on, 120GeV
ITE512: HV=70V, I=51muA
X-Y-Table: x=99.6, y=36 |
Thu Aug 20 11:23:04 2009, Christian Irmler, alignment_beam, beam in center of sensor w telescope, run004 (6860 telescope), 10600, 20.08.2009 11:09:50 , 20.08.2009 11:25:16
|
2 alignement modules
location in beam direction: h04-h03
beam in center of sensor |
Thu Aug 20 11:38:11 2009, Christian Irmler, alignment_beam, top center, point 7, run6861 (+6862), 10600, 20.08.2009 11:36:35, 20.08.2009 11:53:51
|
2 alignement modules
location in beam direction: h04-h03
beam in center of sensor |
Thu Aug 20 12:18:40 2009, Christian Irmler, alignment_beam, top left on sensor, point 2, run6863 (telescope 6864), 10600, 20.08.2009 12:07:28, 20.08.2009 12:25:57
|
2 alignement modules
location in beam direction: h04-h03
beam in center of sensor |
Thu Aug 20 12:35:13 2009, Christian Irmler, alignment_beam, top right on sensor, point 3, run6865, 10600, 20.08.2009 12:31:35, 20.08.2009 12:48:04
|
2 alignement modules
location in beam direction: h04-h03
beam in center of sensor |
Thu Aug 20 14:31:29 2009, Christian Irmler, alignment_beam, bottom left on sensor, point 5, run6868, 10600, 20.08.2009 14:36:00, 20.08.2009 14:51:57
|
2 alignment modules
location in beam direction: h04-h03
beam in center of sensor |
Sun Aug 23 01:46:03 2009, Thomas Bergauer, ITE128, 2nd run with ITE128: central position, run021, 100k, 23.08.09 00:10 (ca.), 23.08.2009 02:15:10
|
ITE128
HV = 70V, 40MHz, 120 GeV
TLU trigger w telescope |
Sun Aug 23 08:13:31 2009, Thomas Bergauer, ITE128, 2nd run with ITE128: top position (4mm below center), run023, 100k, 23.08.2009 08:06:58, 23.08.2009 09:30:53
|
ITE128
HV = 70V, 40MHz, 120 GeV
TLU trigger w telescope |
Wed Aug 19 20:43:14 2009, Christian Irmler, ITE128, ITE128 shooting into strips w/o pitch adapter, low position, run001, 100600, 19.08.2009 20:42:08, 19.08.2009 22:54:21
|
DUT: SiLC 08_1, 6 x ITE128, SiLC 08_2
HV = 70V, 40MHz, 120 GeV
TLU trigger, w/o telescope |
Wed Aug 19 22:56:07 2009, Christian Irmler, ITE128, ITE128 shooting into strips w pitch adapter, upper position, run002, 100600, 19.08.2009 22:54:23, 20.08.2009 00:11:31
|
DUT: SiLC 08_1, 6 x ITE128, SiLC 08_2
HV = 70V, 40MHz, 120 GeV
TLU trigger, w/o telescope |
Thu Aug 20 00:31:45 2009, Christian Irmler, ITE128, ITE128 shooting into strips w pitch adapter, upper position, run003, 100600, 20.08.2009 00:27:36,
|
DUT: SiLC 08_1, 6 x ITE128, SiLC 08_2
HV = 70V, 40MHz, 120 GeV
TLU trigger, w/o telescope |
Wed Aug 26 01:32:25 2009, Christian Irmler, BELLE, APVDAQ + telescope 40 MHz transparent mode + cooling, run043, 100600, 26.08.2009 01:46:38 , 26.08.2009 07:10:14
|
Belle DUT, HV=80V, 40 MHz, 120 GeV
6 samples, transparent mode
w cooling, chiller set to 13 deg, 2900 rpm |
Thu Aug 20 18:56:25 2009, Christian Irmler, alignment_laser, laser, laser001, 100000, 20.08.2009 18:48:53,
|
2 alignment modules
location in beam direction: h04-h03
laser is shooting on h03 (opposite to the beam) |
Thu Aug 20 19:35:06 2009, Manfred Valentan, alignment_laser, laser at high intensity (saturation on near sensor, good signal on far sensor), laser004, 100000, 20.08.2009 19:18:47, 20.08.2009 19:35:05
|
HV=70V, 40MHz, 6 samples, beam off
5ns trigger pulse width, 1 kHz trigger,
current_laser=10mA, |
Thu Aug 20 19:12:23 2009, Manfred Valentan, alignment_laser, background mesurement with laser OFF, laser002, 10000, 20.08.2009 19:10:09, 20.08.2009 19:11:57
|
|
Thu Aug 20 19:15:29 2009, Manfred Valentan, alignment_laser, laser on, laser003, 10000, 20.08.2009 19:13:04, 20.08.2009 19:14:49
|
HV=70V, 40MHz, 6 samples, beam off
5ns trigger pulse width, 1 kHz trigger,
current_laser=10mA, |
Mon Jul 6 12:22:47 2009, Stephan Hänsel, SiLC, Measurements - hybrids with APV, , , ,
|
Pt Modules:
Hybrids with 4 APVs:
h01-4APV
h02-4APV
|
Mon Jul 6 12:24:53 2009, Stephan Hänsel, SiLC, Module Drawings, , , ,
|
Pt Modules:
3D-View
technical drawings:
|
Mon Jul 6 12:29:20 2009, Stephan Hänsel, SiLC, Sensors - layout, , , ,
|
Pt Modules:
CMS OB1 Sensors:
CMS OB1 Dimensions
|
Mon Jul 6 14:30:45 2009, Marko Dragicevic, , Equipment List, , , ,
|
[B]Slow Control:[/B]
Source Measurement Unit Keithley K2410, Inv.Nr.: 540-702, 2000EUR
-- Koax-Kabel + Adapter auf Banane
|
Mon Jul 6 16:22:36 2009, Stephan Hänsel, SiLC, Measurements - Sensors, , , ,
|
Pt Modules:
OB1-Sensors:
30210331516116
30210331415917
30210314845402
30210332911309
|
Mon Jul 6 16:23:51 2009, Stephan Hänsel, SiLC, Module Components, , , ,
|
Pt Modules:
Pt-1: |
Thu Jul 9 10:29:58 2009, Stephan Hänsel, SiLC, Measurements - Modules, , , ,
|
Pt Modules:
- Sensoren sind Luftfeuhtigkeitsempfindlich
- die Sensoren brauchen einige Zeit unter Spannung bis sie sich bei einem akzeptablen Strom stabilisieren |
Fri Jul 17 14:03:21 2009, Stephan Hänsel, , What to measure, , , ,
|
Origami
Testbeam08 Module |
Fri Jul 31 19:23:26 2009, Thomas Bergauer, , Laser Spot size, , , ,
|
10cm nach Kollimator: Durchmesser 1.45mm (FWHM)
20cm nach Kollimator: Durchmesser 1,54mm (FWHM) |
Tue Aug 11 14:03:57 2009, Marko Dragicevic, , Sensor Designs, , , , 6x
|
Screenshots
HEPHY Gallery
GDS File Viewer
KLayout Website
Layer Properties File Warsaw.lyp in den Attachments. |
Fri Aug 14 16:45:25 2009, Stephan Hänsel, , Module - Setups, , , ,
|
5mm Inbus-Schlüssel
3mm Inbus Schlüssel
6- 2(1) x 30 Pt-Pins
beim 5mm-Sockel müssen
die 2 Löcher über die das optische Modul h03 verschraubt wird noch ausgeweitet werden (Thomas)
bei Pt-Deckel oben einzeichnen welche |
Fri Aug 14 19:35:43 2009, Thomas Bergauer, Pt_ITE512, intcal, , , ,
|
HV=100V except h05-ITE-512 and h06-ITE-512 (runaway, HV off)
h01-Pt: 10uA
h02-Pt: 1.6uA |
Fri Aug 14 21:36:17 2009, Markus Friedl, , Config files, , , ,
|
Status of config files as of Friday 14 August 2009 late evening
Config
file name
Timing adjusted
Sensor definition
Tested
|
Wed Aug 19 15:37:37 2009, Christian Irmler, ITE128, internal calibration, cal001, , 15:31:29,
|
8 modules, HV=70V, 40MHz, 1 sample
no beam
APV 4,5: inverter off, higher baseline = PAD modules |
Wed Aug 19 15:41:17 2009, Wolfgang Kiesenhofer, SiLC, angle scan templates, , , , 13x
|
Linie am rechten Seitenrand (in der Vorschau unten leider nicht gut zu sehen) sollte mit dem rechten Rand der Basisplatte abschließen (bezogen
auf die Beam Richtung). |
Wed Aug 19 22:57:13 2009, Marko Dragicevic, , How-To, , , ,
|
TLU (run from DAQPCHEPHY):
ssh eudet@eudetmac001.cern.ch
ssh tlupc
~\eudaq\bin\TLUControl.exe -d1 -a12 |
Thu Aug 20 00:16:45 2009, Christian Irmler, ITE128, pedestal correction, pedcorr001, , 20.08.2009 00:14:21, 20.08.2009 00:24:28
|
DUT: SiLC 08_1, 6 x ITE128, SiLC 08_2
HV = 70V, 40MHz
pedestal correction |
Thu Aug 20 10:48:39 2009, Christian Irmler, alignment_beam, internal calibration, cal002, , 20.08.2009 10:49:07, 20.08.2009 10:59:43
|
2 alignement modules
location in beam direction: h04-h03
HV=70V, 40MHz, 1 sample |
Thu Aug 20 11:05:26 2009, Christian Irmler, alignment_beam, pedeatal correction, pedcorr002, , 20.08.2009 11:05:41, 20.08.2009 11:09:35
|
2 alignement modules
location in beam direction: h04-h03
HV=70V, 40MHz, 1 sample |
Thu Aug 20 15:50:58 2009, Manfred Valentan, alignment_laser, slow control: HV graph, all alignemnt_laser runs, , 20.08.09 10:36, 4h 43m 52s later
|
blue graph: h03
white graph: h04 |
Thu Aug 20 15:54:45 2009, Manfred Valentan, BELLE, temp/humidty logger data, , , ,
|
position: underneath telescope. dewpoint ~ 15 degree
test with chiller: running 4 hours at 15 degress: NO condensation on alu pipe |
Fri Aug 21 06:16:15 2009, Christian Irmler, BELLE, internal calibration 40 MHz transparent mode, cal003, , 20.08.2009 23:27:12, 21.08.2009 00:05:16
|
Belle DUT, intcal
HV=80V, 40 MHz, no beam
transparent mode |
Fri Aug 21 12:08:44 2009, Christian Irmler, BELLE, APVDAQ standalone 40 MHz, pedcorr003, , 21.08.2009 12:08:33, 21.08.2009 12:18:45
|
4 Belle DUTs
HV=80V, 40 MHz
pedestal correction |
Fri Aug 21 14:18:11 2009, Christian Irmler, BELLE, internal calibration 31.8 MHz transparent mode, cal004, , 21.08.2009 14:21:40, 21.08.2009 15:01:24
|
Belle DUT, intcal
HV=80V, 31.8 MHz, no beam
transparent mode |
Fri Aug 21 15:27:08 2009, Christian Irmler, BELLE, internal calibration 31.8 MHz hit mode, cal005, , 21.08.2009 15:34:43, 21.08.2009 16:29:47
|
Belle DUT, intcal
HV=80V, 31.8 MHz, no beam
hit mode |
Fri Aug 21 16:37:22 2009, Christian Irmler, BELLE, internal calibration 40 MHz hit mode, cal006, , 21.08.2009 16:30:33,
|
Belle DUT, intcal
HV=80V, 40 MHz, no beam
hit mode |
Fri Aug 21 17:14:58 2009, Wolfgang Kiesenhofer, , S/N Histograms Raw (no data selection), run001 (strips), run002 (pitch adapter), run003 (upper edge), , ,
|
|
Fri Aug 21 18:07:57 2009, Christian Irmler, BELLE, APVDAQ standalone 31.8 MHz, pedcorr004, , 21.08.2009 17:49:10, 21.08.2009 18:24:31
|
4 Belle DUTs
HV=80V, 31.8 MHz
pedestal correction |
Fri Aug 21 22:42:32 2009, Thomas Bergauer, common, EUDAQ config file used when running with telescope, , , ,
|
Used until Friday, 21.08.09: |
Sat Aug 22 11:54:49 2009, Thomas Bergauer, common, beam profile, , , ,
|
beam shifted a bit in vertical direction downwards since 21. August 09 evening
Beam configuration:
Beam configuration file: H6b.802 (FM HAD (P0 off, H8=+180) PARLALLEL IN H6B SILC 2008 |
Sat Aug 22 12:12:34 2009, Christian Irmler, BELLE, internal calibration 40 MHz transparent mode (cooling?), cal007, , 22.08.2009 12:10:32 , 22.08.2009 12:49:09
|
Belle DUT, intcal
HV=80V, 40 MHz, beam off
1 sample, transparent mode |
Sat Aug 22 13:28:53 2009, Wolfgang Kiesenhofer, Pt_ITE512, runlist for pt-module angle-scan, , , ,
|
Preliminary run list for pt-modules + ite512 + silc1, silc2, silc5, silc6
run
angle[deg]
|
Sat Aug 22 13:30:28 2009, Christian Irmler, BELLE, internal calibration 31.8 MHz transparent mode (cooling?), cal008, , 22.08.2009 12:50:48, 22.08.2009 13:29:25
|
Belle DUT, intcal
HV=80V, 31.8 MHz, beam off
1 sample, transparent mode |
Sat Aug 22 13:34:14 2009, Christian Irmler, BELLE, pedestal correction 31.8 MHz transparent mode (cooling?), pedcorr005, , 22.08.2009 13:31:27, 22.08.2009 13:41:42
|
Belle DUT, intcal
HV=80V, 31.8 MHz, beam off
1 sample, transparent mode |
Sat Aug 22 14:46:12 2009, Christian Irmler, BELLE, internal calibration 31.8 MHz transparent mode + cooling, cal009, , 22.08.2009 14:43:55, 22.08.2009 15:22:37
|
Belle DUT, intcal
HV=80V, 31.8 MHz, beam off
1 sample, transparent mode |
Sat Aug 22 15:12:44 2009, Thomas Bergauer, common, beam profile, , , ,
|
playing with TRIM4 in vertical plane (setting to 20A current) shifted beamspot back to center position
Beam configuration:
Beam configuration file: H6b.802 (FM HAD (P0 off, H8=+180) PARLALLEL IN H6B SILC 2008 |
Sat Aug 22 15:28:00 2009, Christian Irmler, BELLE, pedestal correction 31.8 MHz transparent mode + cooling, pedcorr006, , 22.08.2009 15:25:35, 22.08.2009 15:36:00
|
Belle DUT, HV=80V, 31.8 MHz, beam off
1 sample, transparent mode
pedestal correction |
Sat Aug 22 22:14:50 2009, Christian Irmler, BELLE, internal calibration 40 MHz transparent mode + cooling, cal010, , 22.08.2009 22:24:22,
|
Belle DUT, intcal
HV=80V, 40 MHz, beam off
1 sample, transparent mode |
Sat Aug 22 23:06:22 2009, Christian Irmler, BELLE, pedestal correction 40 MHz transparent mode + cooling, pedcorr007, , 22.08.2009 23:04:29, 22.08.2009 23:13:51
|
Belle DUT, HV=80V, 40 MHz, beam off
1 sample, transparent mode
pedestal correction |
Sun Aug 23 13:15:42 2009, Marko Dragicevic, Pt_ITE512, Current and Humindity during first Run, , , ,
|
Current of Pt modules during first run
Data of the run was dicarded.
Compressed air flow was at ~2 bars during run. Graph shows RH rise after switching of CA flow. Restarted at around 7% with very low pressure.
Timescales for RH and I graph are different!!! |
Sun Aug 23 17:18:25 2009, Christian Irmler, Pt_ITE512, pedestal correction, pedcorr008, , 23.08.2009 17:17:36 ,
|
Pt: 1 Grad, HV=200V, 0% RH, intcal, beam off
ITE512: HV=70V,
X-Y-Table: x=99.6, y=36 |
Sun Aug 23 17:19:50 2009, Christian Irmler, Pt_ITE512, internal calibration, cal011, , 23.08.2009 16:30:43, 23.08.2009 17:02:14
|
Pt: 1 Grad, HV=200V, 0% RH, intcal, beam off
ITE512: HV=70V,
X-Y-Table: x=99.6, y=36 |
Sun Aug 23 23:38:27 2009, Georg Auzinger, , Phone numbers, , , ,
|
Georg #70
Wolfgang - Building: 41, Room: 204, Tel: ?
Manfred: Building 38, Room 522, Tel: 70522 |
Tue Aug 25 09:00:51 2009, Thomas Bergauer, , beam conditions, , , ,
|
manually changed TRIM3, TRIM4 and TRIM6 |
Wed Aug 26 14:26:13 2009, Wolfgang Kiesenhofer, ITE128, S/N final Single-Metal, run001 & run002, , ,
|
Most probable S/N, Single Metal Layer, 2D histogram fitted with langau in 5 bin (strips) slices. |
Wed Sep 2 14:15:17 2009, Wolfgang Kiesenhofer, ITE128, ITE 128 Cross-Talk, run002, , ,
|
Preliminary strip correlation (Kendalls Tau) for threshold = 3*stripnoise. |
Fri Dec 4 12:21:56 2009, Wolfgang Kiesenhofer, , ITE128 strip correlation kendall tau (preliminary result), , , ,
|
Kendall tau (rank correlation) for module 1 (single layer 1 / h13), module 2 (single layer 2 / h14), module 6 (standard sensor 2 / h12)
|
|