ID |
Date |
Author |
Project |
Subject |
Run Number |
Events |
StartTime |
EndTime |
Text |
|
45
|
Fri Aug 21 12:05:31 2009 |
Christian Irmler | BELLE | APVDAQ standalone 40 MHz hit mode | run006 | interrupted | 21.08.2009 10:41:51 | 21.08.2009 10:54:37 | 4 Belle DUTs
HV=80V, 40 MHz, 6 sample, 120 GeV
|
|
46
|
Fri Aug 21 12:06:06 2009 |
Christian Irmler | BELLE | APVDAQ standalone 40 MHz | run007 | interrupted | 21.08.2009 11:06:45 | 21.08.2009 11:10:40 | 4 Belle DUTs
HV=80V, 40 MHz, 6 sample, 120 GeV
|
|
103
|
Tue Aug 25 20:21:31 2009 |
Christian Irmler | BELLE | APVDAQ + telescope 40 MHz transparent mode | run042 | 85189 | 25.08.2009 20:18:18 | 26.08.2009 01:27:12 | Belle DUT, HV=80V, 40 MHz, 120 GeV
6 samples, transparent mode
no cooling |
|
29
|
Thu Aug 20 12:50:59 2009 |
Christian Irmler | alignment_beam | bottom right on sensor, point 4 | run6866 | 8467 | 20.08.2009 12:51:04 | 20.08.2009 13:05:01 | 2 alignement modules
location in beam direction: h04-h03
beam in center of sensor |
|
43
|
Fri Aug 21 06:31:29 2009 |
Christian Irmler | BELLE | APVDAQ + telescope | run6873 | 80173 | 21.08.2009 00:47:38 | 21.08.2009 06:07:02 | 4 Belle DUTs
HV=80V, 40 MHz, 6 sample, 120 GeV
|
|
60
|
Sat Aug 22 03:27:13 2009 |
Thomas Bergauer | BELLE | APVDAQ + telescope 31,8 MHz transparent mode (cooling?) | run014 | 75k | 22.08.2009 03:25:23 | 22.08.2009 07:08:09 | HV=80V, 31.8 MHz, beam on, 120 GeV
6 samples
chiller set
to 13 deg.
|
|
61
|
Sat Aug 22 08:32:02 2009 |
Thomas Bergauer | BELLE | APVDAQ + telescope 31,8 MHz hit mode (cooling?) | run015 | 75k | 22.08.2009 08:15:05 | 22.08.2009 09:25:21 | HV=80V, 31.8 MHz, beam on, 120 GeV
6 samples, hit mode, hitcut=4
chiller
set to 13 deg.
|
|
62
|
Sat Aug 22 09:44:50 2009 |
Thomas Bergauer | BELLE | APVDAQ + telescope 31,8 MHz hit mode (cooling?) | run016 | 75k | 22.08.2009 09:42:38 | 22.08.2009 10:24:05 | HV=80V, 31.8 MHz, beam on, 120 GeV
6 samples, hit mode, hitcut=5
chiller
set to 13 deg.
|
|
63
|
Sat Aug 22 10:28:50 2009 |
Thomas Bergauer | BELLE | APVDAQ + telescope 40 MHz hit mode (cooling?) | run017 | 75k | 22.08.2009 10:26:28 | 22.08.2009 11:16:12 | HV=80V, 40 MHz, beam on, 120 GeV
6 samples, hit mode, hitcut=4
chiller
set to 13 deg.
|
|
64
|
Sat Aug 22 11:26:00 2009 |
Thomas Bergauer | BELLE | APVDAQ + telescope 40 MHz hit mode (cooling?) | run018 | 75k | 22.08.2009 11:16:57 | 22.08.2009 11:58:56 | HV=80V, 40 MHz, beam on, 120 GeV
6 samples, hit mode, hitcut=5
chiller
set to 13 deg.
|
|
73
|
Sat Aug 22 15:52:33 2009 |
Christian Irmler | BELLE | APVDAQ + telescope 31.8 MHz transparent mode + cooling | run019 | 75k | 22.08.2009 15:50:40 | 22.08.2009 19:14:21 | Belle DUT, HV=80V, 31.8 MHz, 120 GeV
6 samples, transparent mode
chiller set to 13 deg, 2900 |
|
74
|
Sat Aug 22 19:19:20 2009 |
Christian Irmler | BELLE | APVDAQ + telescope 40 MHz transparent mode + cooling | run020 | 75k | 22.08.2009 19:17:29 | 22.08.2009 22:09:53 | Belle DUT, HV=80V, 40 MHz, 120 GeV
6 samples, transparent mode
chiller set to 13 deg, 2900 |
|
44
|
Fri Aug 21 06:34:39 2009 |
Christian Irmler | BELLE | APVDAQ + telescope 40 MHz | run005 | 75000 | 21.08.2009 06:10:41 | 21.08.2009 10:37:33 | was originally run004, renamed after
run was stopped to avoid duplicate names
4 Belle DUTs |
|
47
|
Fri Aug 21 12:06:29 2009 |
Christian Irmler | BELLE | APVDAQ standalone hit mode 40 MHz | run008 | 75000 | 21.08.2009 11:15:09 | 21.08.2009 11:29:53 | 4 Belle DUTs
HV=80V, 40 MHz, 6 sample, 120 GeV
|
|
48
|
Fri Aug 21 12:06:39 2009 |
Christian Irmler | BELLE | APVDAQ standalone hit mode 40 MHz | run009 | 75000 | 21.08.2009 11:48:22 | 21.08.2009 12:01:53 | 4 Belle DUTs
HV=80V, 40 MHz, 6 sample, 120 GeV
|
|
50
|
Fri Aug 21 12:22:43 2009 |
Christian Irmler | BELLE | APVDAQ standalone 31.8 MHz hit mode | run010 | 75000 | 21.08.2009 12:53:02 | 21.08.2009 13:35:01 | 4 Belle DUTs
HV=80V, 31.8 MHz, 6 sample, 120 GeV
switched to external clock source |
|
51
|
Fri Aug 21 13:38:20 2009 |
Christian Irmler | BELLE | APVDAQ standalone 31.8 MHz hit mode | run011 | 75000 | 21.08.2009 13:35:25 | | 4 Belle DUTs
HV=80V, 31.8 MHz, 6 sample, 120 GeV
external clock source |
|
59
|
Sat Aug 22 01:06:34 2009 |
Christian Irmler | BELLE | APVDAQ + telescope 40 MHz transparent mode (cooling?) | run013 | 75000 | 21.08.2009 23:49:38 | 22.08.2009 03:21:48 | Belle DUT, tranparent mode
HV=80V, 40 MHz, beam on, 120 GeV
6 samples |
|
31
|
Thu Aug 20 15:15:33 2009 |
Christian Irmler | alignment_beam | bottom center on sensor, point 6 | run6869 | 615 (beam manipulation by students) | 20.08.2009 14:56:16 | 20.08.2009 15:14:11 | 2 alignment modules
location in beam direction: h04-h03
beam in center of sensor |
|
57
|
Fri Aug 21 18:35:13 2009 |
Christian Irmler | BELLE | APVDAQ + telescope 31.8 MHz transparent mode | run012 | 60000 | 21.08.2009 18:31:01 | 21.08.2009 23:25:03 | 4 Belle DUTs
HV=80V, 31.8 MHz, 6 sample, 120 GeV
external clock source |
|
42
|
Fri Aug 21 06:24:10 2009 |
Christian Irmler | BELLE | APVDAQ + telescope (beam alignement) | run6872 | 5785 | 21.08.2009 00:12:26 | 21.08.2009 00:27:11 | 4 Belle DUTs
HV=80V, 40 MHz, 6 sample, 120 GeV
|
|
40
|
Thu Aug 20 20:06:06 2009 |
Manfred Valentan | alignment_laser | low intensity (like laser001), but far sensor in 2nd position | laser007 | 50k | 20.08.2009 19:57:52 | 20.08.2009 20:05:34 | HV=70V, 40MHz, 6 samples, beam off, far
sensor in 2nd position
5ns trigger pulse width, 1 kHz trigger, |
|
38
|
Thu Aug 20 19:46:02 2009 |
Manfred Valentan | alignment_laser | laser at high intensity, far sensor in 2nd position | laser005 | 50000 | 20.08.2009 19:45:16 | 20.08.2009 19:53:01 | far sensor in 2nd position; laser at high
intensity (saturation on near sensor, good
signal on far sensor) |
|
78
|
Sun Aug 23 02:18:20 2009 |
Thomas Bergauer | ITE128 | 2nd run with ITE128: top position (3mm below center); during night | run022 | 407895 | 23.08.2009 02:16:21 | 23.08.2009 08:04:09 | ITE128
HV = 70V, 40MHz, 120 GeV
TLU trigger w telescope |
|
85
|
Mon Aug 24 11:58:23 2009 |
Georg Auzinger | Pt_ITE512 | Pt_ITE512 1deg air | run025 | 20k | 24.08.09 11:24:33 | 24.08.09 12:40:25 | Pt: 1 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table:
x=99.6, y=36 |
|
86
|
Mon Aug 24 13:01:14 2009 |
Georg Auzinger | Pt_ITE512 | Pt_ITE512 3deg air | run026 | 20k | 24.08.09 11:24:33 | 24.08.2009 14:11:45 | Pt: 3 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table:
x=99.6, y=36 |
|
87
|
Mon Aug 24 14:23:01 2009 |
Georg Auzinger | Pt_ITE512 | Pt_ITE512 5deg air | run027 | 20k | 24.08.2009 14:27:07 | 24.08.2009 15:26:20 | Pt: 5 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table:
x=99.6, y=36 |
|
88
|
Mon Aug 24 15:28:49 2009 |
Georg Auzinger | Pt_ITE512 | Pt_ITE512 7deg air | run028 | 20k | 24.08.09 15:39:50 | 24.08.09 16:40:54 | Pt: 7 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table:
x=99.6, y=36 |
|
89
|
Mon Aug 24 16:44:36 2009 |
Georg Auzinger | Pt_ITE512 | Pt_ITE512 9deg air | run029 | 20k | 24.08.09 17:03:21 | 24.08.09 18:20:55 | Pt: 9 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table:
x=99.6, y=36 |
|
90
|
Mon Aug 24 18:30:07 2009 |
Georg Auzinger | Pt_ITE512 | Pt_ITE512 11deg air | run030 | 20k | 24.08.09 18:45:09 | 24.08.09 20:37:04 | Pt: 11 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table:
x=99.6, y=36 |
|
91
|
Mon Aug 24 22:04:56 2009 |
Georg Auzinger | Pt_ITE512 | Pt_ITE512 13deg air | run031 | 20k | 24.08.09 20:53:50 | 24.08.09 22:00:49 | Pt: 13 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table:
x=99.6, y=36 |
|
95
|
Tue Aug 25 09:01:12 2009 |
Marko Dragicevic | Pt_ITE512 | Pt_ITE512 2deg air | run034 | 20k | 25.08.09 08:56:18 | 25.08.09 09:45: | Pt: 2 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table:
x=99.6, y=36 |
|
96
|
Tue Aug 25 09:53:16 2009 |
Marko Dragicevic | Pt_ITE512 | Pt_ITE512 4deg NO air! | run035 | 20k | 25.08.2009 09:50 | 25.08.2009 11:00 | Pt: 4 Grad, HV=200V, 0% (start run) to
14% (end run) RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table: |
|
97
|
Tue Aug 25 11:26:23 2009 |
Thomas Bergauer | Pt_ITE512 | Pt_ITE512 6deg NO air! | run036 | 20k | 25.08.2009 11:25 | 25.08.2009 12:19:55 | Pt: 6 Grad, HV=200V, 20% (start run)
to % (end run) RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table: |
|
98
|
Tue Aug 25 12:30:04 2009 |
Marko Dragicevic | Pt_ITE512 | Pt_ITE512 8deg NO air! | run037 | 20k | 25.08.2009 12:45 | 25.08.2009 13:40:13 | Pt: 8 Grad, HV=200V, 28% (start run) to
31% (end run) RH, beam on, 120GeV
ITE512: HV=70V, I=49.1muA
X-Y-Table: |
|
99
|
Tue Aug 25 13:48:30 2009 |
Marko Dragicevic | Pt_ITE512 | Pt_ITE512 10deg NO air! | run038 | 20k | 25.08.2009 13:54:54 | 25.08.2009 15:22:38 | Pt: 10 Grad, HV=200V, 31.7% (start run)
to 33.8% (end run) RH, beam on, 120GeV
ITE512: HV=70V, I=50muA
X-Y-Table: |
|
100
|
Tue Aug 25 15:33:07 2009 |
Marko Dragicevic | Pt_ITE512 | Pt_ITE512 12deg NO air! | run039 | 20k | 25.08.2009 15:35 | 25.08.2009 17:10 | Pt: 12 Grad, HV=200V, 34.4% (start run)
to 36.1% (end run) RH, beam on, 120GeV
ITE512: HV=70V, I=50muA
X-Y-Table: |
|
101
|
Tue Aug 25 17:14:52 2009 |
Marko Dragicevic | Pt_ITE512 | Pt_ITE512 17deg NO air! | run040 | 20k | 25.08.2009 17:17:11 | 25.08.2009 18:08:57 | Pt: 17 Grad, HV=200V, 36.5% (start run)
to xx.1% (end run) RH, beam on, 120GeV
ITE512: HV=70V, I=51muA
X-Y-Table: |
|
81
|
Sun Aug 23 14:03:14 2009 |
Manfred Valentan | Pt_ITE512 | Pt & ITE512 center position, 1 deg | run024 | 20000 | 23.08.2009 13:59:06 | | Pt: 1 Grad, HV=200V, 0% RH
ITE512: HV=70V
X-Y-Table: x=99.6, y=36 |
|
92
|
Mon Aug 24 22:12:22 2009 |
Georg Auzinger | Pt_ITE512 | Pt_ITE512 15deg air | run032 | 19456 | 24.08.09 22:18:08 | 24.08.09 23:25:52 | Pt: 15 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table:
x=99.6, y=36
no |
|
93
|
Tue Aug 25 01:33:18 2009 |
Georg Auzinger | Pt_ITE512 | Pt_ITE512 0deg air | run033 | 151724 | 25.08.09 01:35:18 | 25.08.2009 08:44:27 | Pt: 0 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table:
x=99.6, y=36 |
|
105
|
Wed Aug 26 07:19:42 2009 |
Christian Irmler | BELLE | APVDAQ + telescope 31.8 MHz transparent mode + cooling | run044 | 13504 | 26.08.2009 07:18:19 | 26.08.2009 08:46:11 (beam shut down @ 8:00) | Belle DUT, HV=80V, 31.8 MHz, 120
GeV
6 samples, transparent mode |
|
39
|
Thu Aug 20 19:56:21 2009 |
Manfred Valentan | alignment_laser | background mesurement with laser OFF | laser006 | 10k | 20.08.2009 19:54:04 | 20.08.2009 19:55:38 | |
|
102
|
Tue Aug 25 18:22:25 2009 |
Manfred Valentan | Pt_ITE512 | Pt_ITE512 40deg NO air! (for calibration) | run041 | 10k | 25.08.2009 18:20:30 | 25.08.2009 | Pt: 40 Grad, HV=200V, 36.9% (start run)
to xx% (end run) RH, beam on, 120GeV
ITE512: HV=70V, I=51muA
X-Y-Table: |
|
25
|
Thu Aug 20 11:23:04 2009 |
Christian Irmler | alignment_beam | beam in center of sensor w telescope | run004 (6860 telescope) | 10600 | 20.08.2009 11:09:50 | 20.08.2009 11:25:16 | 2 alignement modules
location in beam direction: h04-h03
beam in center of sensor |
|
26
|
Thu Aug 20 11:38:11 2009 |
Christian Irmler | alignment_beam | top center, point 7 | run6861 (+6862) | 10600 | 20.08.2009 11:36:35 | 20.08.2009 11:53:51 | 2 alignement modules
location in beam direction: h04-h03
beam in center of sensor |
|
27
|
Thu Aug 20 12:18:40 2009 |
Christian Irmler | alignment_beam | top left on sensor, point 2 | run6863 (telescope 6864) | 10600 | 20.08.2009 12:07:28 | 20.08.2009 12:25:57 | 2 alignement modules
location in beam direction: h04-h03
beam in center of sensor |
|
28
|
Thu Aug 20 12:35:13 2009 |
Christian Irmler | alignment_beam | top right on sensor, point 3 | run6865 | 10600 | 20.08.2009 12:31:35 | 20.08.2009 12:48:04 | 2 alignement modules
location in beam direction: h04-h03
beam in center of sensor |
|
30
|
Thu Aug 20 14:31:29 2009 |
Christian Irmler | alignment_beam | bottom left on sensor, point 5 | run6868 | 10600 | 20.08.2009 14:36:00 | 20.08.2009 14:51:57 | 2 alignment modules
location in beam direction: h04-h03
beam in center of sensor |
|
77
|
Sun Aug 23 01:46:03 2009 |
Thomas Bergauer | ITE128 | 2nd run with ITE128: central position | run021 | 100k | 23.08.09 00:10 (ca.) | 23.08.2009 02:15:10 | ITE128
HV = 70V, 40MHz, 120 GeV
TLU trigger w telescope |
|
79
|
Sun Aug 23 08:13:31 2009 |
Thomas Bergauer | ITE128 | 2nd run with ITE128: top position (4mm below center) | run023 | 100k | 23.08.2009 08:06:58 | 23.08.2009 09:30:53 | ITE128
HV = 70V, 40MHz, 120 GeV
TLU trigger w telescope |
|
18
|
Wed Aug 19 20:43:14 2009 |
Christian Irmler | ITE128 | ITE128 shooting into strips w/o pitch adapter, low position | run001 | 100600 | 19.08.2009 20:42:08 | 19.08.2009 22:54:21 | DUT: SiLC 08_1, 6 x ITE128, SiLC 08_2
HV = 70V, 40MHz, 120 GeV
TLU trigger, w/o telescope |
|
19
|
Wed Aug 19 22:56:07 2009 |
Christian Irmler | ITE128 | ITE128 shooting into strips w pitch adapter, upper position | run002 | 100600 | 19.08.2009 22:54:23 | 20.08.2009 00:11:31 | DUT: SiLC 08_1, 6 x ITE128, SiLC 08_2
HV = 70V, 40MHz, 120 GeV
TLU trigger, w/o telescope |
|
22
|
Thu Aug 20 00:31:45 2009 |
Christian Irmler | ITE128 | ITE128 shooting into strips w pitch adapter, upper position | run003 | 100600 | 20.08.2009 00:27:36 | | DUT: SiLC 08_1, 6 x ITE128, SiLC 08_2
HV = 70V, 40MHz, 120 GeV
TLU trigger, w/o telescope |
|
104
|
Wed Aug 26 01:32:25 2009 |
Christian Irmler | BELLE | APVDAQ + telescope 40 MHz transparent mode + cooling | run043 | 100600 | 26.08.2009 01:46:38 | 26.08.2009 07:10:14 | Belle DUT, HV=80V, 40 MHz, 120 GeV
6 samples, transparent mode
w cooling, chiller set to 13 deg, |
|
34
|
Thu Aug 20 18:56:25 2009 |
Christian Irmler | alignment_laser | laser | laser001 | 100000 | 20.08.2009 18:48:53 | | 2 alignment modules
location in beam direction: h04-h03
laser is shooting on h03 (opposite |
|
37
|
Thu Aug 20 19:35:06 2009 |
Manfred Valentan | alignment_laser | laser at high intensity (saturation on near sensor, good signal on far sensor) | laser004 | 100000 | 20.08.2009 19:18:47 | 20.08.2009 19:35:05 | HV=70V, 40MHz, 6 samples, beam off
5ns trigger pulse width, 1 kHz trigger,
|
|
35
|
Thu Aug 20 19:12:23 2009 |
Manfred Valentan | alignment_laser | background mesurement with laser OFF | laser002 | 10000 | 20.08.2009 19:10:09 | 20.08.2009 19:11:57 | |
|
36
|
Thu Aug 20 19:15:29 2009 |
Manfred Valentan | alignment_laser | laser on | laser003 | 10000 | 20.08.2009 19:13:04 | 20.08.2009 19:14:49 | HV=70V, 40MHz, 6 samples, beam off
5ns trigger pulse width, 1 kHz trigger,
|
|
1
|
Mon Jul 6 12:22:47 2009 |
Stephan Hänsel | SiLC | Measurements - hybrids with APV | | | | | Pt Modules:
Hybrids with 4 APVs:
|
|
2
|
Mon Jul 6 12:24:53 2009 |
Stephan Hänsel | SiLC | Module Drawings | | | | | Pt Modules:
3D-View
technical drawings:
|
|
5
|
Mon Jul 6 12:29:20 2009 |
Stephan Hänsel | SiLC | Sensors - layout | | | | | Pt Modules:
CMS OB1 Sensors:
|
|
6
|
Mon Jul 6 14:30:45 2009 |
Marko Dragicevic | | Equipment List | | | | | [B]Slow Control:[/B]
Source Measurement Unit Keithley K2410, Inv.Nr.:
540-702, 2000EUR
|
|
7
|
Mon Jul 6 16:22:36 2009 |
Stephan Hänsel | SiLC | Measurements - Sensors | | | | | Pt Modules:
OB1-Sensors:
30210331516116 |
|
8
|
Mon Jul 6 16:23:51 2009 |
Stephan Hänsel | SiLC | Module Components | | | | | Pt Modules:
Pt-1: |
|
9
|
Thu Jul 9 10:29:58 2009 |
Stephan Hänsel | SiLC | Measurements - Modules | | | | | Pt Modules:
- Sensoren sind Luftfeuhtigkeitsempfindlich |
|
10
|
Fri Jul 17 14:03:21 2009 |
Stephan Hänsel | | What to measure | | | | | Origami
Testbeam08 Module |
|
11
|
Fri Jul 31 19:23:26 2009 |
Thomas Bergauer | | Laser Spot size | | | | | 10cm nach Kollimator: Durchmesser 1.45mm (FWHM)
20cm
nach Kollimator: Durchmesser 1,54mm (FWHM) |
|
12
|
Tue Aug 11 14:03:57 2009 |
Marko Dragicevic | | Sensor Designs | | | | | Screenshots
HEPHY
Gallery
GDS File Viewer
|
6x |
13
|
Fri Aug 14 16:45:25 2009 |
Stephan Hänsel | | Module - Setups | | | | |
5mm Inbus-Schlüssel
3mm Inbus Schlüssel
|
|
14
|
Fri Aug 14 19:35:43 2009 |
Thomas Bergauer | Pt_ITE512 | intcal | | | | | HV=100V except h05-ITE-512 and h06-ITE-512
(runaway, HV off)
h01-Pt: 10uA |
|
15
|
Fri Aug 14 21:36:17 2009 |
Markus Friedl | | Config files | | | | | Status of config files as of Friday 14
August 2009 late evening
|
|
16
|
Wed Aug 19 15:37:37 2009 |
Christian Irmler | ITE128 | internal calibration | cal001 | | 15:31:29 | | 8 modules, HV=70V, 40MHz, 1 sample
no beam
APV 4,5: inverter off, higher baseline |
|
17
|
Wed Aug 19 15:41:17 2009 |
Wolfgang Kiesenhofer | SiLC | angle scan templates | | | | | Linie am rechten Seitenrand (in der Vorschau
unten leider nicht gut zu sehen) sollte mit
dem rechten Rand der Basisplatte abschließen |
13x |
20
|
Wed Aug 19 22:57:13 2009 |
Marko Dragicevic | | How-To | | | | | TLU (run from DAQPCHEPHY):
ssh
eudet@eudetmac001.cern.ch
ssh tlupc |
|
21
|
Thu Aug 20 00:16:45 2009 |
Christian Irmler | ITE128 | pedestal correction | pedcorr001 | | 20.08.2009 00:14:21 | 20.08.2009 00:24:28 | DUT: SiLC 08_1, 6 x ITE128, SiLC 08_2
HV = 70V, 40MHz
pedestal correction |
|
23
|
Thu Aug 20 10:48:39 2009 |
Christian Irmler | alignment_beam | internal calibration | cal002 | | 20.08.2009 10:49:07 | 20.08.2009 10:59:43 | 2 alignement modules
location in beam direction: h04-h03
HV=70V, 40MHz, 1 sample |
|
24
|
Thu Aug 20 11:05:26 2009 |
Christian Irmler | alignment_beam | pedeatal correction | pedcorr002 | | 20.08.2009 11:05:41 | 20.08.2009 11:09:35 | 2 alignement modules
location in beam direction: h04-h03
HV=70V, 40MHz, 1 sample |
|
32
|
Thu Aug 20 15:50:58 2009 |
Manfred Valentan | alignment_laser | slow control: HV graph | all alignemnt_laser runs | | 20.08.09 10:36 | 4h 43m 52s later | blue graph: h03
white graph: h04 |
|
33
|
Thu Aug 20 15:54:45 2009 |
Manfred Valentan | BELLE | temp/humidty logger data | | | | | position: underneath telescope. dewpoint
~ 15 degree
test with chiller: running 4 hours |
|
41
|
Fri Aug 21 06:16:15 2009 |
Christian Irmler | BELLE | internal calibration 40 MHz transparent mode | cal003 | | 20.08.2009 23:27:12 | 21.08.2009 00:05:16 | Belle DUT, intcal
HV=80V, 40 MHz, no beam
transparent mode |
|
49
|
Fri Aug 21 12:08:44 2009 |
Christian Irmler | BELLE | APVDAQ standalone 40 MHz | pedcorr003 | | 21.08.2009 12:08:33 | 21.08.2009 12:18:45 | 4 Belle DUTs
HV=80V, 40 MHz
pedestal correction |
|
52
|
Fri Aug 21 14:18:11 2009 |
Christian Irmler | BELLE | internal calibration 31.8 MHz transparent mode | cal004 | | 21.08.2009 14:21:40 | 21.08.2009 15:01:24 | Belle DUT, intcal
HV=80V, 31.8 MHz, no beam
transparent mode |
|
53
|
Fri Aug 21 15:27:08 2009 |
Christian Irmler | BELLE | internal calibration 31.8 MHz hit mode | cal005 | | 21.08.2009 15:34:43 | 21.08.2009 16:29:47 | Belle DUT, intcal
HV=80V, 31.8 MHz, no beam
hit mode |
|
54
|
Fri Aug 21 16:37:22 2009 |
Christian Irmler | BELLE | internal calibration 40 MHz hit mode | cal006 | | 21.08.2009 16:30:33 | | Belle DUT, intcal
HV=80V, 40 MHz, no beam
hit mode |
|
55
|
Fri Aug 21 17:14:58 2009 |
Wolfgang Kiesenhofer | | S/N Histograms Raw (no data selection) | run001 (strips), run002 (pitch adapter), run003 (upper edge) | | | | |
|
56
|
Fri Aug 21 18:07:57 2009 |
Christian Irmler | BELLE | APVDAQ standalone 31.8 MHz | pedcorr004 | | 21.08.2009 17:49:10 | 21.08.2009 18:24:31 | 4 Belle DUTs
HV=80V, 31.8 MHz
pedestal correction |
|
58
|
Fri Aug 21 22:42:32 2009 |
Thomas Bergauer | common | EUDAQ config file used when running with telescope | | | | |
|
|
65
|
Sat Aug 22 11:54:49 2009 |
Thomas Bergauer | common | beam profile | | | | | beam shifted a bit in vertical direction
downwards since 21. August 09 evening
|
|
66
|
Sat Aug 22 12:12:34 2009 |
Christian Irmler | BELLE | internal calibration 40 MHz transparent mode (cooling?) | cal007 | | 22.08.2009 12:10:32 | 22.08.2009 12:49:09 | Belle DUT, intcal
HV=80V, 40 MHz, beam off
1 sample, transparent mode |
|
67
|
Sat Aug 22 13:28:53 2009 |
Wolfgang Kiesenhofer | Pt_ITE512 | runlist for pt-module angle-scan | | | | | Preliminary run
list for pt-modules + ite512 + silc1, silc2,
silc5, silc6 |
|
68
|
Sat Aug 22 13:30:28 2009 |
Christian Irmler | BELLE | internal calibration 31.8 MHz transparent mode (cooling?) | cal008 | | 22.08.2009 12:50:48 | 22.08.2009 13:29:25 | Belle DUT, intcal
HV=80V, 31.8 MHz, beam off
1 sample, transparent mode |
|
69
|
Sat Aug 22 13:34:14 2009 |
Christian Irmler | BELLE | pedestal correction 31.8 MHz transparent mode (cooling?) | pedcorr005 | | 22.08.2009 13:31:27 | 22.08.2009 13:41:42 | Belle DUT, intcal
HV=80V, 31.8 MHz, beam off
1 sample, transparent mode |
|
70
|
Sat Aug 22 14:46:12 2009 |
Christian Irmler | BELLE | internal calibration 31.8 MHz transparent mode + cooling | cal009 | | 22.08.2009 14:43:55 | 22.08.2009 15:22:37 | Belle DUT, intcal
HV=80V, 31.8 MHz, beam off
1 sample, transparent mode |
|
71
|
Sat Aug 22 15:12:44 2009 |
Thomas Bergauer | common | beam profile | | | | | playing with TRIM4 in vertical
plane (setting to 20A current) shifted beamspot
back to center position |
|
72
|
Sat Aug 22 15:28:00 2009 |
Christian Irmler | BELLE | pedestal correction 31.8 MHz transparent mode + cooling | pedcorr006 | | 22.08.2009 15:25:35 | 22.08.2009 15:36:00 | Belle DUT, HV=80V, 31.8 MHz, beam off
1 sample, transparent mode
pedestal correction |
|
75
|
Sat Aug 22 22:14:50 2009 |
Christian Irmler | BELLE | internal calibration 40 MHz transparent mode + cooling | cal010 | | 22.08.2009 22:24:22 | | Belle DUT, intcal
HV=80V, 40 MHz, beam off
1 sample, transparent mode |
|
76
|
Sat Aug 22 23:06:22 2009 |
Christian Irmler | BELLE | pedestal correction 40 MHz transparent mode + cooling | pedcorr007 | | 22.08.2009 23:04:29 | 22.08.2009 23:13:51 | Belle DUT, HV=80V, 40 MHz, beam off
1 sample, transparent mode
pedestal correction |
|
80
|
Sun Aug 23 13:15:42 2009 |
Marko Dragicevic | Pt_ITE512 | Current and Humindity during first Run | | | | | Current of Pt modules during first run
Data
of the run was dicarded.
Compressed air flow was at ~2 bars |
|
82
|
Sun Aug 23 17:18:25 2009 |
Christian Irmler | Pt_ITE512 | pedestal correction | pedcorr008 | | 23.08.2009 17:17:36 | | Pt: 1 Grad, HV=200V, 0% RH, intcal, beam
off
ITE512: HV=70V, |
|
83
|
Sun Aug 23 17:19:50 2009 |
Christian Irmler | Pt_ITE512 | internal calibration | cal011 | | 23.08.2009 16:30:43 | 23.08.2009 17:02:14 | Pt: 1 Grad, HV=200V, 0% RH, intcal, beam
off
ITE512: HV=70V, |
|
84
|
Sun Aug 23 23:38:27 2009 |
Georg Auzinger | | Phone numbers | | | | | Georg #70
Wolfgang - Building: 41, Room: 204,
Tel: ? |
|
94
|
Tue Aug 25 09:00:51 2009 |
Thomas Bergauer | | beam conditions | | | | | manually changed TRIM3, TRIM4 and TRIM6 |
|
106
|
Wed Aug 26 14:26:13 2009 |
Wolfgang Kiesenhofer | ITE128 | S/N final Single-Metal | run001 & run002 | | | | Most probable S/N, Single Metal Layer,
2D histogram fitted with langau in 5 bin
(strips) slices. |
|
107
|
Wed Sep 2 14:15:17 2009 |
Wolfgang Kiesenhofer | ITE128 | ITE 128 Cross-Talk | run002 | | | | Preliminary strip correlation (Kendalls
Tau) for threshold = 3*stripnoise. |
|
114
|
Fri Dec 4 12:21:56 2009 |
Wolfgang Kiesenhofer | | ITE128 strip correlation kendall tau (preliminary result) | | | | | Kendall tau (rank correlation) for module
1 (single layer 1 / h13), module 2 (single
layer 2 / h14), module 6 (standard |
|