ID |
Date |
Author |
Project |
Subject |
Run Number |
Events |
StartTime |
EndTime |
105
|
Wed Aug 26 07:19:42 2009 |
Christian Irmler | BELLE | APVDAQ + telescope 31.8 MHz transparent mode + cooling | run044 | 13504 | 26.08.2009 07:18:19 | 26.08.2009 08:46:11 (beam shut down @ 8:00) |
Belle DUT, HV=80V, 31.8 MHz, 120 GeV
6 samples, transparent mode
w cooling, chiller set to 13 deg, 2900 rpm
after realignement of modules
new beam spot:
APV #
|
n-side
|
p-side
|
JP
|
1/2
|
1/2
|
Origami
|
2/3
|
1/2 |
Flex
|
1/2
|
1/2 |
Micron
|
0/1
|
1/2 |
|
104
|
Wed Aug 26 01:32:25 2009 |
Christian Irmler | BELLE | APVDAQ + telescope 40 MHz transparent mode + cooling | run043 | 100600 | 26.08.2009 01:46:38 | 26.08.2009 07:10:14 |
Belle DUT, HV=80V, 40 MHz, 120 GeV
6 samples, transparent mode
w cooling, chiller set to 13 deg, 2900 rpm
after realignement of modules
new beam spot:
APV #
|
n-side
|
p-side
|
JP
|
1/2
|
1/2
|
Origami
|
2/3
|
1/2 |
Flex
|
1/2
|
1/2 |
Micron
|
0/1
|
1/2 |
|
102
|
Tue Aug 25 18:22:25 2009 |
Manfred Valentan | Pt_ITE512 | Pt_ITE512 40deg NO air! (for calibration) | run041 | 10k | 25.08.2009 18:20:30 | 25.08.2009 |
Pt: 40 Grad, HV=200V, 36.9% (start run) to xx% (end run) RH, beam on, 120GeV
ITE512: HV=70V, I=51muA
X-Y-Table: x=99.6, y=36 |
100
|
Tue Aug 25 15:33:07 2009 |
Marko Dragicevic | Pt_ITE512 | Pt_ITE512 12deg NO air! | run039 | 20k | 25.08.2009 15:35 | 25.08.2009 17:10 |
Pt: 12 Grad, HV=200V, 34.4% (start run) to 36.1% (end run) RH, beam on, 120GeV
ITE512: HV=70V, I=50muA
X-Y-Table: x=99.6, y=36 |
97
|
Tue Aug 25 11:26:23 2009 |
Thomas Bergauer | Pt_ITE512 | Pt_ITE512 6deg NO air! | run036 | 20k | 25.08.2009 11:25 | 25.08.2009 12:19:55 |
Pt: 6 Grad, HV=200V, 20% (start run) to % (end run) RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table: x=99.6, y=36
MOEGLICHERWEISE WAR EIN MODUL AUF 8 GRAD |
103
|
Tue Aug 25 20:21:31 2009 |
Christian Irmler | BELLE | APVDAQ + telescope 40 MHz transparent mode | run042 | 85189 | 25.08.2009 20:18:18 | 26.08.2009 01:27:12 |
Belle DUT, HV=80V, 40 MHz, 120 GeV
6 samples, transparent mode
no cooling
after realignement of modules
new beam spot:
APV #
|
n-side
|
p-side
|
JP
|
1/2
|
1/2
|
Origami
|
2/3
|
1/2 |
Flex
|
1/2
|
1/2 |
Micron
|
0/1
|
1/2 |
|
101
|
Tue Aug 25 17:14:52 2009 |
Marko Dragicevic | Pt_ITE512 | Pt_ITE512 17deg NO air! | run040 | 20k | 25.08.2009 17:17:11 | 25.08.2009 18:08:57 |
Pt: 17 Grad, HV=200V, 36.5% (start run) to xx.1% (end run) RH, beam on, 120GeV
ITE512: HV=70V, I=51muA
X-Y-Table: x=99.6, y=36 |
Attachment 1: Pt-17deg.png
|
|
99
|
Tue Aug 25 13:48:30 2009 |
Marko Dragicevic | Pt_ITE512 | Pt_ITE512 10deg NO air! | run038 | 20k | 25.08.2009 13:54:54 | 25.08.2009 15:22:38 |
Pt: 10 Grad, HV=200V, 31.7% (start run) to 33.8% (end run) RH, beam on, 120GeV
ITE512: HV=70V, I=50muA
X-Y-Table: x=99.6, y=36 |
98
|
Tue Aug 25 12:30:04 2009 |
Marko Dragicevic | Pt_ITE512 | Pt_ITE512 8deg NO air! | run037 | 20k | 25.08.2009 12:45 | 25.08.2009 13:40:13 |
Pt: 8 Grad, HV=200V, 28% (start run) to 31% (end run) RH, beam on, 120GeV
ITE512: HV=70V, I=49.1muA
X-Y-Table: x=99.6, y=36 |
96
|
Tue Aug 25 09:53:16 2009 |
Marko Dragicevic | Pt_ITE512 | Pt_ITE512 4deg NO air! | run035 | 20k | 25.08.2009 09:50 | 25.08.2009 11:00 |
Pt: 4 Grad, HV=200V, 0% (start run) to 14% (end run) RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table: x=99.6, y=36 |
95
|
Tue Aug 25 09:01:12 2009 |
Marko Dragicevic | Pt_ITE512 | Pt_ITE512 2deg air | run034 | 20k | 25.08.09 08:56:18 | 25.08.09 09:45: |
Pt: 2 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table: x=99.6, y=36 |
93
|
Tue Aug 25 01:33:18 2009 |
Georg Auzinger | Pt_ITE512 | Pt_ITE512 0deg air | run033 | 151724 | 25.08.09 01:35:18 | 25.08.2009 08:44:27 |
Pt: 0 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table: x=99.6, y=36 |
87
|
Mon Aug 24 14:23:01 2009 |
Georg Auzinger | Pt_ITE512 | Pt_ITE512 5deg air | run027 | 20k | 24.08.2009 14:27:07 | 24.08.2009 15:26:20 |
Pt: 5 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table: x=99.6, y=36 |
92
|
Mon Aug 24 22:12:22 2009 |
Georg Auzinger | Pt_ITE512 | Pt_ITE512 15deg air | run032 | 19456 | 24.08.09 22:18:08 | 24.08.09 23:25:52 |
Pt: 15 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table: x=99.6, y=36
no beam
--> run stopped after 19456 events |
91
|
Mon Aug 24 22:04:56 2009 |
Georg Auzinger | Pt_ITE512 | Pt_ITE512 13deg air | run031 | 20k | 24.08.09 20:53:50 | 24.08.09 22:00:49 |
Pt: 13 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table: x=99.6, y=36 |
90
|
Mon Aug 24 18:30:07 2009 |
Georg Auzinger | Pt_ITE512 | Pt_ITE512 11deg air | run030 | 20k | 24.08.09 18:45:09 | 24.08.09 20:37:04 |
Pt: 11 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table: x=99.6, y=36 |
89
|
Mon Aug 24 16:44:36 2009 |
Georg Auzinger | Pt_ITE512 | Pt_ITE512 9deg air | run029 | 20k | 24.08.09 17:03:21 | 24.08.09 18:20:55 |
Pt: 9 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table: x=99.6, y=36 |
88
|
Mon Aug 24 15:28:49 2009 |
Georg Auzinger | Pt_ITE512 | Pt_ITE512 7deg air | run028 | 20k | 24.08.09 15:39:50 | 24.08.09 16:40:54 |
Pt: 7 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table: x=99.6, y=36 |
85
|
Mon Aug 24 11:58:23 2009 |
Georg Auzinger | Pt_ITE512 | Pt_ITE512 1deg air | run025 | 20k | 24.08.09 11:24:33 | 24.08.09 12:40:25 |
Pt: 1 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table: x=99.6, y=36 |
86
|
Mon Aug 24 13:01:14 2009 |
Georg Auzinger | Pt_ITE512 | Pt_ITE512 3deg air | run026 | 20k | 24.08.09 11:24:33 | 24.08.2009 14:11:45 |
Pt: 3 Grad, HV=200V, 0% RH, beam on, 120GeV
ITE512: HV=70V,
X-Y-Table: x=99.6, y=36 |
81
|
Sun Aug 23 14:03:14 2009 |
Manfred Valentan | Pt_ITE512 | Pt & ITE512 center position, 1 deg | run024 | 20000 | 23.08.2009 13:59:06 | |
Pt: 1 Grad, HV=200V, 0% RH
ITE512: HV=70V
X-Y-Table: x=99.6, y=36
Telescope: run7316 |
82
|
Sun Aug 23 17:18:25 2009 |
Christian Irmler | Pt_ITE512 | pedestal correction | pedcorr008 | | 23.08.2009 17:17:36 | |
Pt: 1 Grad, HV=200V, 0% RH, intcal, beam off
ITE512: HV=70V,
X-Y-Table: x=99.6, y=36 |
83
|
Sun Aug 23 17:19:50 2009 |
Christian Irmler | Pt_ITE512 | internal calibration | cal011 | | 23.08.2009 16:30:43 | 23.08.2009 17:02:14 |
Pt: 1 Grad, HV=200V, 0% RH, intcal, beam off
ITE512: HV=70V,
X-Y-Table: x=99.6, y=36 |
79
|
Sun Aug 23 08:13:31 2009 |
Thomas Bergauer | ITE128 | 2nd run with ITE128: top position (4mm below center) | run023 | 100k | 23.08.2009 08:06:58 | 23.08.2009 09:30:53 |
ITE128
HV = 70V, 40MHz, 120 GeV
TLU trigger w telescope
XY-Table: x=48, y=111.31 |
78
|
Sun Aug 23 02:18:20 2009 |
Thomas Bergauer | ITE128 | 2nd run with ITE128: top position (3mm below center); during night | run022 | 407895 | 23.08.2009 02:16:21 | 23.08.2009 08:04:09 |
ITE128
HV = 70V, 40MHz, 120 GeV
TLU trigger w telescope
XY-Table: x=48, y=112.31 |
Attachment 1: Picture_1.png
|
|
77
|
Sun Aug 23 01:46:03 2009 |
Thomas Bergauer | ITE128 | 2nd run with ITE128: central position | run021 | 100k | 23.08.09 00:10 (ca.) | 23.08.2009 02:15:10 |
ITE128
HV = 70V, 40MHz, 120 GeV
TLU trigger w telescope
XY-Table: x=48, y=115.31
new beam position (used TRIM4 magnet at 7A): y down by 2mm. see attached picture |
Attachment 1: Picture_1.png
|
|
76
|
Sat Aug 22 23:06:22 2009 |
Christian Irmler | BELLE | pedestal correction 40 MHz transparent mode + cooling | pedcorr007 | | 22.08.2009 23:04:29 | 22.08.2009 23:13:51 |
Belle DUT, HV=80V, 40 MHz, beam off
1 sample, transparent mode
pedestal correction
chiller set to 13 deg, 2900 rpm |
75
|
Sat Aug 22 22:14:50 2009 |
Christian Irmler | BELLE | internal calibration 40 MHz transparent mode + cooling | cal010 | | 22.08.2009 22:24:22 | |
Belle DUT, intcal
HV=80V, 40 MHz, beam off
1 sample, transparent mode
external clock
cooling
chiller set to 13 deg.
Bypass removed to achieve better watter flow at the module!
Chiller pump is set to 2800 rpm |
74
|
Sat Aug 22 19:19:20 2009 |
Christian Irmler | BELLE | APVDAQ + telescope 40 MHz transparent mode + cooling | run020 | 75k | 22.08.2009 19:17:29 | 22.08.2009 22:09:53 |
Belle DUT, HV=80V, 40 MHz, 120 GeV
6 samples, transparent mode
chiller set to 13 deg, 2900 rpm
water flow checked befor start of run |
73
|
Sat Aug 22 15:52:33 2009 |
Christian Irmler | BELLE | APVDAQ + telescope 31.8 MHz transparent mode + cooling | run019 | 75k | 22.08.2009 15:50:40 | 22.08.2009 19:14:21 |
Belle DUT, HV=80V, 31.8 MHz, 120 GeV
6 samples, transparent mode
chiller set to 13 deg, 2900 rpm
water flow checked befor start of run |
72
|
Sat Aug 22 15:28:00 2009 |
Christian Irmler | BELLE | pedestal correction 31.8 MHz transparent mode + cooling | pedcorr006 | | 22.08.2009 15:25:35 | 22.08.2009 15:36:00 |
Belle DUT, HV=80V, 31.8 MHz, beam off
1 sample, transparent mode
pedestal correction
chiller set to 13 deg, 2900 rpm |
70
|
Sat Aug 22 14:46:12 2009 |
Christian Irmler | BELLE | internal calibration 31.8 MHz transparent mode + cooling | cal009 | | 22.08.2009 14:43:55 | 22.08.2009 15:22:37 |
Belle DUT, intcal
HV=80V, 31.8 MHz, beam off
1 sample, transparent mode
cooling
chiller set to 13 deg.
Since there was no (or to less) water flow through the small pipe of the origami module, all previous runs with cooling must be repeated.
Bypass removed to achieve better watter flow at the module!
Chiller pump is set to 2800 rpm |
69
|
Sat Aug 22 13:34:14 2009 |
Christian Irmler | BELLE | pedestal correction 31.8 MHz transparent mode (cooling?) | pedcorr005 | | 22.08.2009 13:31:27 | 22.08.2009 13:41:42 |
Belle DUT, intcal
HV=80V, 31.8 MHz, beam off
1 sample, transparent mode
chiller set to 13 deg.
external 31.8 MHz clock
there was probably no water flow throught the pipe of the origami module during this run --> must be repeated! |
68
|
Sat Aug 22 13:30:28 2009 |
Christian Irmler | BELLE | internal calibration 31.8 MHz transparent mode (cooling?) | cal008 | | 22.08.2009 12:50:48 | 22.08.2009 13:29:25 |
Belle DUT, intcal
HV=80V, 31.8 MHz, beam off
1 sample, transparent mode
chiller set to 13 deg.
external 31.8 MHz clock
there was probably no water flow throught the pipe of the origami module during this run --> must be repeated |
66
|
Sat Aug 22 12:12:34 2009 |
Christian Irmler | BELLE | internal calibration 40 MHz transparent mode (cooling?) | cal007 | | 22.08.2009 12:10:32 | 22.08.2009 12:49:09 |
Belle DUT, intcal
HV=80V, 40 MHz, beam off
1 sample, transparent mode
chiller set to 13 deg.
external 40 MHz clock
there was probably no water flow throught the pipe of the origami module during this run --> must be repeated |
64
|
Sat Aug 22 11:26:00 2009 |
Thomas Bergauer | BELLE | APVDAQ + telescope 40 MHz hit mode (cooling?) | run018 | 75k | 22.08.2009 11:16:57 | 22.08.2009 11:58:56 |
HV=80V, 40 MHz, beam on, 120 GeV
6 samples, hit mode, hitcut=5
chiller set to 13 deg.
f=40 MHz
config file: cern09_belle_hit_cut5_multi6.cfg
trigger rate about 3500 ev / spill
there was probably no water flow throught the pipe of the origami module during this run!
|
63
|
Sat Aug 22 10:28:50 2009 |
Thomas Bergauer | BELLE | APVDAQ + telescope 40 MHz hit mode (cooling?) | run017 | 75k | 22.08.2009 10:26:28 | 22.08.2009 11:16:12 |
HV=80V, 40 MHz, beam on, 120 GeV
6 samples, hit mode, hitcut=4
chiller set to 13 deg.
f=40 MHz
config file: cern09_belle_hit_multi6.cfg
there was probably no water flow throught the pipe of the origami module during this run!
|
62
|
Sat Aug 22 09:44:50 2009 |
Thomas Bergauer | BELLE | APVDAQ + telescope 31,8 MHz hit mode (cooling?) | run016 | 75k | 22.08.2009 09:42:38 | 22.08.2009 10:24:05 |
HV=80V, 31.8 MHz, beam on, 120 GeV
6 samples, hit mode, hitcut=5
chiller set to 13 deg.
f=31.8 MHz
config file: cern09_belle_31.8mhz_hit_cut5_multi6.cfg
there was probably no water flow throught the pipe of the origami module during this run!
|
61
|
Sat Aug 22 08:32:02 2009 |
Thomas Bergauer | BELLE | APVDAQ + telescope 31,8 MHz hit mode (cooling?) | run015 | 75k | 22.08.2009 08:15:05 | 22.08.2009 09:25:21 |
HV=80V, 31.8 MHz, beam on, 120 GeV
6 samples, hit mode, hitcut=4
chiller set to 13 deg.
f=31.8 MHz
config file: cern09_belle_31.8mhz_hit_multi6.cfg
there was probably no water flow throught the pipe of the origami module during this run --> must be repeated
|
60
|
Sat Aug 22 03:27:13 2009 |
Thomas Bergauer | BELLE | APVDAQ + telescope 31,8 MHz transparent mode (cooling?) | run014 | 75k | 22.08.2009 03:25:23 | 22.08.2009 07:08:09 |
HV=80V, 31.8 MHz, beam on, 120 GeV
6 samples
chiller set to 13 deg.
f=31.8 MHz
config file: cern09_belle_31.8mhz_multi6.cfg
there was probably no water flow throught the pipe of the origami module during this run --> must be repeated
|
59
|
Sat Aug 22 01:06:34 2009 |
Christian Irmler | BELLE | APVDAQ + telescope 40 MHz transparent mode (cooling?) | run013 | 75000 | 21.08.2009 23:49:38 | 22.08.2009 03:21:48 |
Belle DUT, tranparent mode
HV=80V, 40 MHz, beam on, 120 GeV
6 samples
chiller set to 13 deg.
beam position: p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors), beam spot: 9x9 mm
JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped)
APVDAQ and telescope runs are not synchronized
trigger rate: about 300 - 500 ev / spill
there was probably no water flow throught the pipe of the origami module during this run --> must be repeated |
57
|
Fri Aug 21 18:35:13 2009 |
Christian Irmler | BELLE | APVDAQ + telescope 31.8 MHz transparent mode | run012 | 60000 | 21.08.2009 18:31:01 | 21.08.2009 23:25:03 |
4 Belle DUTs
HV=80V, 31.8 MHz, 6 sample, 120 GeV
external clock source
transparent mode
beam position: p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors), beam spot: 9x9 mm
JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped)
APVDAQ and telescope runs are not synchronized |
56
|
Fri Aug 21 18:07:57 2009 |
Christian Irmler | BELLE | APVDAQ standalone 31.8 MHz | pedcorr004 | | 21.08.2009 17:49:10 | 21.08.2009 18:24:31 |
4 Belle DUTs
HV=80V, 31.8 MHz
pedestal correction
transparent mode
beam on
|
54
|
Fri Aug 21 16:37:22 2009 |
Christian Irmler | BELLE | internal calibration 40 MHz hit mode | cal006 | | 21.08.2009 16:30:33 | |
Belle DUT, intcal
HV=80V, 40 MHz, no beam
hit mode
switched back to internal 40 MHz clock |
53
|
Fri Aug 21 15:27:08 2009 |
Christian Irmler | BELLE | internal calibration 31.8 MHz hit mode | cal005 | | 21.08.2009 15:34:43 | 21.08.2009 16:29:47 |
Belle DUT, intcal
HV=80V, 31.8 MHz, no beam
hit mode
Origami p-side APV 2&3 with reverse readout order |
52
|
Fri Aug 21 14:18:11 2009 |
Christian Irmler | BELLE | internal calibration 31.8 MHz transparent mode | cal004 | | 21.08.2009 14:21:40 | 21.08.2009 15:01:24 |
Belle DUT, intcal
HV=80V, 31.8 MHz, no beam
transparent mode
Origami p-side APV 2&3 with reverse readout order |
51
|
Fri Aug 21 13:38:20 2009 |
Christian Irmler | BELLE | APVDAQ standalone 31.8 MHz hit mode | run011 | 75000 | 21.08.2009 13:35:25 | |
4 Belle DUTs
HV=80V, 31.8 MHz, 6 sample, 120 GeV
external clock source
processed mode, hit cut = 5
beam position: p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors)
JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped) |
50
|
Fri Aug 21 12:22:43 2009 |
Christian Irmler | BELLE | APVDAQ standalone 31.8 MHz hit mode | run010 | 75000 | 21.08.2009 12:53:02 | 21.08.2009 13:35:01 |
4 Belle DUTs
HV=80V, 31.8 MHz, 6 sample, 120 GeV
switched to external clock source
processed mode, hit cut = 4
beam position: p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors)
JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped) |
49
|
Fri Aug 21 12:08:44 2009 |
Christian Irmler | BELLE | APVDAQ standalone 40 MHz | pedcorr003 | | 21.08.2009 12:08:33 | 21.08.2009 12:18:45 |
4 Belle DUTs
HV=80V, 40 MHz
pedestal correction
beam position: p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors)
|
48
|
Fri Aug 21 12:06:39 2009 |
Christian Irmler | BELLE | APVDAQ standalone hit mode 40 MHz | run009 | 75000 | 21.08.2009 11:48:22 | 21.08.2009 12:01:53 |
4 Belle DUTs
HV=80V, 40 MHz, 6 sample, 120 GeV
beam position: p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors)
JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped)
same as run6873, but w improved timing --> peak is now at sample 2 or 3
since eudetmac was not reachable by VNC, the telescope has not been restarted !
zero supressed w bad strip definition of origami module, but natural readout order of APV 2 and 3 on p-side
hit cut = 5 |
47
|
Fri Aug 21 12:06:29 2009 |
Christian Irmler | BELLE | APVDAQ standalone hit mode 40 MHz | run008 | 75000 | 21.08.2009 11:15:09 | 21.08.2009 11:29:53 |
4 Belle DUTs
HV=80V, 40 MHz, 6 sample, 120 GeV
beam position: p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors)
JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped)
same as run6873, but w improved timing --> peak is now at sample 2 or 3
since eudetmac was not reachable by VNC, the telescope has not been restarted !
zero supressed w bad strip definition of origami module, but natural readout order of APV 2 and 3 on p-side
hit cut = 4 |
46
|
Fri Aug 21 12:06:06 2009 |
Christian Irmler | BELLE | APVDAQ standalone 40 MHz | run007 | interrupted | 21.08.2009 11:06:45 | 21.08.2009 11:10:40 |
4 Belle DUTs
HV=80V, 40 MHz, 6 sample, 120 GeV
beam position: p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors)
JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped)
zero supressed w bad strip definition of origami module, but reverse readout order of APV 2 and 3 on p-side |
45
|
Fri Aug 21 12:05:31 2009 |
Christian Irmler | BELLE | APVDAQ standalone 40 MHz hit mode | run006 | interrupted | 21.08.2009 10:41:51 | 21.08.2009 10:54:37 |
4 Belle DUTs
HV=80V, 40 MHz, 6 sample, 120 GeV
beam position: p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors)
table position y (height): 94.3
zero supressed w/o bad strip definition of origami module
JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped)
|
44
|
Fri Aug 21 06:34:39 2009 |
Christian Irmler | BELLE | APVDAQ + telescope 40 MHz | run005 | 75000 | 21.08.2009 06:10:41 | 21.08.2009 10:37:33 |
was originally run004, renamed after run was stopped to avoid duplicate names
4 Belle DUTs
HV=80V, 40 MHz, 6 sample, 120 GeV
beam position: p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors)
table position y (height): 94.3
JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped)
same as run6873, but w improved timing --> peak is now at sample 2 or 3
since eudetmac was not reachable by VNC, the telescope has not been restarted !
|
43
|
Fri Aug 21 06:31:29 2009 |
Christian Irmler | BELLE | APVDAQ + telescope | run6873 | 80173 | 21.08.2009 00:47:38 | 21.08.2009 06:07:02 |
4 Belle DUTs
HV=80V, 40 MHz, 6 sample, 120 GeV
beam position: p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors)
JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped)
run interrupted after 80173 --> bad timing, peak was at 4 th or 5 th sample |
42
|
Fri Aug 21 06:24:10 2009 |
Christian Irmler | BELLE | APVDAQ + telescope (beam alignement) | run6872 | 5785 | 21.08.2009 00:12:26 | 21.08.2009 00:27:11 |
4 Belle DUTs
HV=80V, 40 MHz, 6 sample, 120 GeV
beam alignement
Origami is hit between in center of sensor (APV 1 and 2 on both sides) |
41
|
Fri Aug 21 06:16:15 2009 |
Christian Irmler | BELLE | internal calibration 40 MHz transparent mode | cal003 | | 20.08.2009 23:27:12 | 21.08.2009 00:05:16 |
Belle DUT, intcal
HV=80V, 40 MHz, no beam
transparent mode |
40
|
Thu Aug 20 20:06:06 2009 |
Manfred Valentan | alignment_laser | low intensity (like laser001), but far sensor in 2nd position | laser007 | 50k | 20.08.2009 19:57:52 | 20.08.2009 20:05:34 |
HV=70V, 40MHz, 6 samples, beam off, far sensor in 2nd position
5ns trigger pulse width, 1 kHz trigger,
current_laser=10mA,
Photodiode: pulse_width=15ns, amplitude=7mV |
39
|
Thu Aug 20 19:56:21 2009 |
Manfred Valentan | alignment_laser | background mesurement with laser OFF | laser006 | 10k | 20.08.2009 19:54:04 | 20.08.2009 19:55:38 |
|
38
|
Thu Aug 20 19:46:02 2009 |
Manfred Valentan | alignment_laser | laser at high intensity, far sensor in 2nd position | laser005 | 50000 | 20.08.2009 19:45:16 | 20.08.2009 19:53:01 |
far sensor in 2nd position; laser at high intensity (saturation on near sensor, good signal on far sensor)
HV=70V, 40MHz, 6 samples, beam off, far sensor in 2nd position
5ns trigger pulse width, 1 kHz trigger,
current_laser=10mA,
Photodiode: pulse_width=50ns, amplitude=45mV
|
37
|
Thu Aug 20 19:35:06 2009 |
Manfred Valentan | alignment_laser | laser at high intensity (saturation on near sensor, good signal on far sensor) | laser004 | 100000 | 20.08.2009 19:18:47 | 20.08.2009 19:35:05 |
HV=70V, 40MHz, 6 samples, beam off
5ns trigger pulse width, 1 kHz trigger,
current_laser=10mA,
Photodiode: pulse_width=50ns, amplitude=45mV
laser at high intensity (saturation on near sensor, good signal on far sensor)
attached picture shows profile of laser on far sensor creating interferences |
Attachment 1: laser_interference.png
|
|
36
|
Thu Aug 20 19:15:29 2009 |
Manfred Valentan | alignment_laser | laser on | laser003 | 10000 | 20.08.2009 19:13:04 | 20.08.2009 19:14:49 |
HV=70V, 40MHz, 6 samples, beam off
5ns trigger pulse width, 1 kHz trigger,
current_laser=10mA,
Photodiode: pulse_width=15ns, amplitude=7mV
same settings as run laser001 |
35
|
Thu Aug 20 19:12:23 2009 |
Manfred Valentan | alignment_laser | background mesurement with laser OFF | laser002 | 10000 | 20.08.2009 19:10:09 | 20.08.2009 19:11:57 |
|
34
|
Thu Aug 20 18:56:25 2009 |
Christian Irmler | alignment_laser | laser | laser001 | 100000 | 20.08.2009 18:48:53 | |
2 alignment modules
location in beam direction: h04-h03
laser is shooting on h03 (opposite to the beam)
HV=70V, 40MHz, 6 samples
beam off
module 1 (h03) is used w inverter off
since the signal off the second sensor is only 10 percent, the base line of h03 was increased again (now @ 260 ADC).
5ns trigger pulse width, 1 kHz trigger,
current_laser=10mA,
Photodiode: pulse_width=15ns, amplitude=7mV
bad strips: APV5: 115, APV6: 1 |
31
|
Thu Aug 20 15:15:33 2009 |
Christian Irmler | alignment_beam | bottom center on sensor, point 6 | run6869 | 615 (beam manipulation by students) | 20.08.2009 14:56:16 | 20.08.2009 15:14:11 |
2 alignment modules
location in beam direction: h04-h03
beam in center of sensor
HV=70V, 40MHz, 6 samples
beam on, 120 GeV
module 1 (h03) is used w inverter off and higher base line
XY coordinates: X:50 y:155 (bottom center on sensor in beam direction) |
30
|
Thu Aug 20 14:31:29 2009 |
Christian Irmler | alignment_beam | bottom left on sensor, point 5 | run6868 | 10600 | 20.08.2009 14:36:00 | 20.08.2009 14:51:57 |
2 alignment modules
location in beam direction: h04-h03
beam in center of sensor
HV=70V, 40MHz, 6 samples
beam on, 120 GeV
module 1 (h03) is used w inverter off and higher base line
XY coordinates: X:57 y:155 (bottom left on sensor in beam direction) |
29
|
Thu Aug 20 12:50:59 2009 |
Christian Irmler | alignment_beam | bottom right on sensor, point 4 | run6866 | 8467 | 20.08.2009 12:51:04 | 20.08.2009 13:05:01 |
2 alignement modules
location in beam direction: h04-h03
beam in center of sensor
HV=70V, 40MHz, 6 samples
beam on, 120 GeV
module 1 (h03) is used w inverter off and higher base line
XY coordinates: X:43 y:155 (bottom right on sensor in beam direction) |
28
|
Thu Aug 20 12:35:13 2009 |
Christian Irmler | alignment_beam | top right on sensor, point 3 | run6865 | 10600 | 20.08.2009 12:31:35 | 20.08.2009 12:48:04 |
2 alignement modules
location in beam direction: h04-h03
beam in center of sensor
HV=70V, 40MHz, 6 samples
beam on, 120 GeV
module 1 (h03) is used w inverter off and higher base line
XY coordinates: X:43 y:121.3 (top right on sensor in beam direction) |
27
|
Thu Aug 20 12:18:40 2009 |
Christian Irmler | alignment_beam | top left on sensor, point 2 | run6863 (telescope 6864) | 10600 | 20.08.2009 12:07:28 | 20.08.2009 12:25:57 |
2 alignement modules
location in beam direction: h04-h03
beam in center of sensor
HV=70V, 40MHz, 6 samples
beam on, 120 GeV
module 1 (h03) is used w inverter off and higher base line
XY coordinates: X:57 y:121.3 (top left on sensor in beam direction) |
26
|
Thu Aug 20 11:38:11 2009 |
Christian Irmler | alignment_beam | top center, point 7 | run6861 (+6862) | 10600 | 20.08.2009 11:36:35 | 20.08.2009 11:53:51 |
2 alignement modules
location in beam direction: h04-h03
beam in center of sensor
HV=70V, 40MHz, 6 samples
beam on, 120 GeV
module 1 (h03) is used w inverter off and higher base line
XY coordinates: X:50 y:121.3 (top center, point 7) |
25
|
Thu Aug 20 11:23:04 2009 |
Christian Irmler | alignment_beam | beam in center of sensor w telescope | run004 (6860 telescope) | 10600 | 20.08.2009 11:09:50 | 20.08.2009 11:25:16 |
2 alignement modules
location in beam direction: h04-h03
beam in center of sensor
HV=70V, 40MHz, 6 samples
beam on, 120 GeV
module 1 (h03) is used w inverter off and higher base line
XY coordinates: X:50 y:141.3 (center- center, point 1) |
24
|
Thu Aug 20 11:05:26 2009 |
Christian Irmler | alignment_beam | pedeatal correction | pedcorr002 | | 20.08.2009 11:05:41 | 20.08.2009 11:09:35 |
2 alignement modules
location in beam direction: h04-h03
HV=70V, 40MHz, 1 sample
beam on
module 1 (h03) is used w inverter off and higher base line |
23
|
Thu Aug 20 10:48:39 2009 |
Christian Irmler | alignment_beam | internal calibration | cal002 | | 20.08.2009 10:49:07 | 20.08.2009 10:59:43 |
2 alignement modules
location in beam direction: h04-h03
HV=70V, 40MHz, 1 sample
no beam
module 1 (h03) is used w inverter off and higher base line |
22
|
Thu Aug 20 00:31:45 2009 |
Christian Irmler | ITE128 | ITE128 shooting into strips w pitch adapter, upper position | run003 | 100600 | 20.08.2009 00:27:36 | |
DUT: SiLC 08_1, 6 x ITE128, SiLC 08_2
HV = 70V, 40MHz, 120 GeV
TLU trigger, w/o telescope
9x9 mm beam spot
height (y) = 139.3100
ITE128 shooting into strips w pitch adapter, upper edge of sensor |
21
|
Thu Aug 20 00:16:45 2009 |
Christian Irmler | ITE128 | pedestal correction | pedcorr001 | | 20.08.2009 00:14:21 | 20.08.2009 00:24:28 |
DUT: SiLC 08_1, 6 x ITE128, SiLC 08_2
HV = 70V, 40MHz
pedestal correction
beam on
|
32
|
Thu Aug 20 15:50:58 2009 |
Manfred Valentan | alignment_laser | slow control: HV graph | all alignemnt_laser runs | | 20.08.09 10:36 | 4h 43m 52s later |
blue graph: h03
white graph: h04 |
Attachment 1: slow_control_alignment_sensors.gif
|
|
19
|
Wed Aug 19 22:56:07 2009 |
Christian Irmler | ITE128 | ITE128 shooting into strips w pitch adapter, upper position | run002 | 100600 | 19.08.2009 22:54:23 | 20.08.2009 00:11:31 |
DUT: SiLC 08_1, 6 x ITE128, SiLC 08_2
HV = 70V, 40MHz, 120 GeV
TLU trigger, w/o telescope
9x9 mm beam spot
height (y) = 144.3099
ITE128 shooting into strips w pitch adapter, upper position |
18
|
Wed Aug 19 20:43:14 2009 |
Christian Irmler | ITE128 | ITE128 shooting into strips w/o pitch adapter, low position | run001 | 100600 | 19.08.2009 20:42:08 | 19.08.2009 22:54:21 |
DUT: SiLC 08_1, 6 x ITE128, SiLC 08_2
HV = 70V, 40MHz, 120 GeV
TLU trigger, w/o telescope
9x9 mm beam spot
height (y) = 154.0979
ITE128 shooting into strips w/o pitch adapter, low position |
16
|
Wed Aug 19 15:37:37 2009 |
Christian Irmler | ITE128 | internal calibration | cal001 | | 15:31:29 | |
8 modules, HV=70V, 40MHz, 1 sample
no beam
APV 4,5: inverter off, higher baseline = PAD modules |
1
|
Mon Jul 6 12:22:47 2009 |
Stephan Hänsel | SiLC | Measurements - hybrids with APV | | | | |
Pt Modules:
Optical Modules:
ITE Modules:
|
2
|
Mon Jul 6 12:24:53 2009 |
Stephan Hänsel | SiLC | Module Drawings | | | | |
Pt Modules:
Optical Modules:
ITE Modules: :
|
5
|
Mon Jul 6 12:29:20 2009 |
Stephan Hänsel | SiLC | Sensors - layout | | | | |
Pt Modules:
CMS OB1 Sensors:
Optical Modules:
Sensors:
ITE Modules:
|
Attachment 1: Wafer-Screenshot.png
|
|
6
|
Mon Jul 6 14:30:45 2009 |
Marko Dragicevic | | Equipment List | | | | |
Slow Control:
Source Measurement Unit Keithley K2410, Inv.Nr.: 540-702, 2000EUR
-- Koax-Kabel + Adapter auf Banane
Scanning Voltmeter Keithley K2700 , Inv.Nr.: 540-698, 2000EUR
-- Shunt-Widerstand-Platine
-- Flachbandkabel fuer Verbindung Shunt-Platine<->K2700
TRHX
-- 3 Sensoren
-- 2 lange Flachbandkabel, 1 serielles Kabel
LV-Power-Supplies, je 150EUR
-- GW Instek GPC-1850, SN.: 4080392
-- GW Instek GPC-1850D, Inv.Nr.: 545-059
-- GW Instek GPC-1850D, Inv.Nr.: 545-062
-- Systron Donner HR 20-10A, SN.: 781-092
-- Systron Donner HR 20-10A, SN.: 781-096
Oszilloskop Tektronix TDS 3054, SN.: B011109, 4000EUR
-- 4 probes
Die Katze (Belle-HV-Supply)
-- HV-Kabel 30m
GBIP-Kabel, 1x lang, 1x kurz
Signalgenerator Agilent 81110A, Inv.Nr.: 541-054, 3000EUR
DAQ:
Chrisu-PC, Inv.Nr.: 401-925
-- Monitore
---- Belinea, Inv.Nr.: 401-696
---- Gericom, SN.: M1132GR5467345
-- Keyboard & Maus
Wiener 9U-VME-Crate, Inv.Nr.: 545-043, 3000EUR
-- Power Supply
-- VME-Controller
-- 4 VME-Module (1x Buffer, 3x FADC)
DOCK-Box
-- Power Kabel
VME-Kabel (bockig) + Verlaengerung
30m-Kabel (8xCat7, 2xCat5, 2xgrau)
Lemo-Kabel
100pin-Flachkabel Neco-Buffer
Bananenkabel
Hybridkabel (8x SiLC, Belle-Kabel)
Special TLU-Adapter (flipping pin order of RJ45)
Schrauben für Crate-Montage
Erdungskabel (liegen am CERN im Labor)
THRX + Hum. Sensoren!
Magic Box
DUT:
Schrauben für Montage am Drehteller
4mm Steckschlauch Stickstoff (Laenge?)
Anschluss 1/8" auf 4mm Steckschlauch
Druckminderer, SN.: 717.06143
-- 6mm Snap-In
-- 6mm Schlauch
Chiller Huber ministat 230, Inv.Nr.: 482-021, 4000EUR
-- Manual
-- Netzteil
-- langes serielles Kabel
-- 5-6mm Schlauch
-- Adapter
-- 5 Liter dest. Wasser (falls noch Platz ist)
-- LabView (falls ferngesteuert)
Box-Deckel
Baseplates (4?)
Gaffa
Doppelscotch
Schwarze Selbstklebefolie
Alufolie
Sockel (2 verschiedene)
Schablonen für SiLC-Angle Scan (08-Modules)
gscheites Verlängerungskabel
genug Schrauben, Gewindestangen, Flügelmuttern
2 Balken für Pt-Module Drehungen (+ genug "Bolzen")
GROSSES SCHWARZES LICHTDICHTES TUCH !!!!
THRX-Kabel & Sensoren
25 Module
-- 4 Belle-Module (1 Stack)
-- 2 pt-Module
-- 2 Alignment-Module
-- 2 Stacks mit Warschau-Sensoren (1x 6 Sensoren, 1x 3 Sensoren)
-- 8 SiLC-Module (1 Stack)
EDV:
Netzwerkkabel
Netzwerk-Switch:
-- 3com Gigabit Switch 8, SN.: AB/9XRQ9J00171B0
-- D-Link 8-Port GBit-Switch
WLAN-Router: Linksys WRT54GL-DE, SN.: CL7B1H502248, 60 EUR
1TB externe Festplatte: Western Digital MyBook, SN.: WCA551469094
-- Netzgeraet
-- USB-Kabel
-- Firewire 400/800 Kabel
Webcam
USB-Stick
Etikettiergeraet: Brother P-touch 1000
Verlaengerungskabel ohne Ende…
1 Dose Druckluft zur Reinigung
Laptops
-- Apple MacBook (MV) Inv.Nr.: 401-810
-- Apple MacBook Pro (MD) Inv Nr.: 401-831
-- Apple MacBook (GA) SN.:W87411Q3Z5Z
2x PCI Express-Karten (noch zu kaufen), je 30EUR
2x USB-Seriell Adapter
1 Trommel Ethernet-Kabel (100m, vom Walzel)
einige RJ-45 Stecker
2.5" externe HD
CD und DVD Rohlinge
Tools:
Diverse Adaptoren Lemo-BNC, Lemo-Lemo
Taschenlampe + 2x Hirnbirn
Massband
Multimeter
Werkzeug (Schraubenzieher & Co)
Pinzetten
Laserpointer
Schwarze Fetzen
Scotch tape
Kabelbinder
Adapter f. Steckdosen
Verteiler-Leisten
Tixo klein & gross
Loetstation Advanced JBC, SN.: 76841165, inkl. Zubehoer
Ethernet-Crimp-Zange
Eisensagl
Schublehre
Misc:
Fondueset
Spiegelreflex Digitalkamera Canon 450D (400EUR)
-- Stativ
-- Reflexionszelt
SLR Marko
Stativ
Scheinwerfer (fuer ordentliche Fotos)
Akkus+Ladegerät
Dickes Logbook
Kugelschreiber/Bleistifte
Pflaster
Carnet ATA |
Attachment 1: carnet_aug09.xls
|
7
|
Mon Jul 6 16:22:36 2009 |
Stephan Hänsel | SiLC | Measurements - Sensors | | | | |
Pt Modules:
Optical Modules:
ITE Modules:
|
8
|
Mon Jul 6 16:23:51 2009 |
Stephan Hänsel | SiLC | Module Components | | | | |
Pt Modules:
Pt-1:
hybrid: h01-4APV
bottom sensor: 30210331516116
top sensor: 30210332911309
Pt-2:
hybrid: h02-4APV
bottom sensor: 30210331415917
top sensor: 30210314845402
Optical Modules:
Opt_AC-Test-1:
hybrid: h21-2APV
sensor: HPK-ILC-TS-SPL-6687-05
Opt_AC-Test-2:
hybrid: h22-2APV
sensor: HPK-ILC-TS-SPL-6687-07
modules with SiLC alignment sensors:
Opt-1:
hybrid: h03
sensor: HPK-SPL-6686-03
Opt-2:
hybrid: h04
sensor: HPK-SPL-6686-07
ITE Modules: |
9
|
Thu Jul 9 10:29:58 2009 |
Stephan Hänsel | SiLC | Measurements - Modules | | | | |
Pt Modules:
- Sensoren sind Luftfeuhtigkeitsempfindlich
- die Sensoren brauchen einige Zeit unter Spannung bis sie sich bei einem akzeptablen Strom stabilisieren
small Problems:
Optical Modules:
small Problems with h03-Module:
ITE Modules:
|
10
|
Fri Jul 17 14:03:21 2009 |
Stephan Hänsel | | What to measure | | | | |
Origami
Testbeam08 Module
- Anglescan
Pt Modules (2Stück - je 2 Sensoren):
Anglescan
- einzelne module (auch als "stub" (fixer Abstand zwischen ihnen) ?)
wichtig: brauchen wir 2 Testbeam08 module um 90° verdreht für höheninformation??? (sensoren in den Pt-modulen sind nicht 100%ig parallel - MESSEN!)
Optical Modules:(DAUER ca 18 Stunden)
- tests in box mit laserbeam (laser auf anderer Höhe al beam?!? - sonst geht der beam durch den Laser)
ITE Modules:
- 8 ter stack: (2 Testbeam08 module quer + 2 x 1stmetal128 + 2 x 2nd metal 128 + 2 x normal128)
- 2ndmetal512 module 3 stück bauen und im beam versetzt einbauen parasitär bei den spanier-modulen)
zusätliche ideen:
- CMS-Tracker slice (2Pt + 2 optische + 3 2ndmetal512 hintereinander in unterschiedlichen winkeln um einen tracker-slice zu simulieren - CMS-layout !?!)
|
11
|
Fri Jul 31 19:23:26 2009 |
Thomas Bergauer | | Laser Spot size | | | | |
10cm nach Kollimator: Durchmesser 1.45mm (FWHM)
20cm nach Kollimator: Durchmesser 1,54mm (FWHM) |
Attachment 1: laser_spot_overview.jpg
|
|
Attachment 2: laser_spot_10cm.jpg
|
|
Attachment 3: laser_spot_20cm.jpg
|
|
Attachment 4: laser_spot_30cm.jpg
|
|
12
|
Tue Aug 11 14:03:57 2009 |
Marko Dragicevic | | Sensor Designs | | | | |
Screenshots
HEPHY Gallery
GDS File Viewer
KLayout Website
Layer Properties File Warsaw.lyp in den Attachments. |
Attachment 1: Wafer.gds
|
Attachment 2: SensorSTD.gds
|
Attachment 3: SensorPAS.gds
|
Attachment 4: SensorPAD.gds
|
Attachment 5: Sensor512.gds
|
Attachment 6: Warsaw.lyp
|
<?xml version="1.0"?>
<layer-properties>
<properties>
<frame-color>#01ff6b</frame-color>
<fill-color>#01ff6b</fill-color>
<frame-brightness>0</frame-brightness>
<fill-brightness>0</fill-brightness>
<dither-pattern>I3</dither-pattern>
<visible>true</visible>
<transparent>false</transparent>
<width>1</width>
<marked>false</marked>
<animation>0</animation>
<name>NPlus</name>
<source>1/0@1</source>
</properties>
<properties>
<frame-color>#ff0000</frame-color>
<fill-color>#ff0000</fill-color>
<frame-brightness>0</frame-brightness>
<fill-brightness>0</fill-brightness>
<dither-pattern>I9</dither-pattern>
<visible>true</visible>
<transparent>false</transparent>
<width>1</width>
<marked>false</marked>
<animation>0</animation>
<name>PPlus</name>
<source>2/0@1</source>
</properties>
<properties>
<frame-color>#ff8000</frame-color>
<fill-color>#ff8000</fill-color>
<frame-brightness>0</frame-brightness>
<fill-brightness>0</fill-brightness>
<dither-pattern>I0</dither-pattern>
<visible>true</visible>
<transparent>false</transparent>
<width>1</width>
<marked>false</marked>
<animation>0</animation>
<name>Via</name>
<source>3/0@1</source>
</properties>
<properties>
<frame-color>#00ffff</frame-color>
<fill-color>#00ffff</fill-color>
<frame-brightness>0</frame-brightness>
<fill-brightness>0</fill-brightness>
<dither-pattern>I15</dither-pattern>
<visible>true</visible>
<transparent>false</transparent>
<width>1</width>
<marked>false</marked>
<animation>0</animation>
<name>Metal</name>
<source>4/0@1</source>
</properties>
<properties>
<frame-color>#ff00ff</frame-color>
<fill-color>#ff00ff</fill-color>
<frame-brightness>0</frame-brightness>
<fill-brightness>0</fill-brightness>
<dither-pattern>I2</dither-pattern>
<visible>true</visible>
<transparent>false</transparent>
<width>1</width>
<marked>false</marked>
<animation>0</animation>
<name>Passivation</name>
<source>5/0@1</source>
</properties>
<properties>
<frame-color>#91ff00</frame-color>
<fill-color>#91ff00</fill-color>
<frame-brightness>0</frame-brightness>
<fill-brightness>0</fill-brightness>
<dither-pattern>I3</dither-pattern>
<visible>true</visible>
<transparent>false</transparent>
<width>1</width>
<marked>false</marked>
<animation>0</animation>
<name>PolySilicon</name>
<source>6/0@1</source>
</properties>
<properties>
<frame-color>#008050</frame-color>
<fill-color>#008050</fill-color>
<frame-brightness>0</frame-brightness>
<fill-brightness>0</fill-brightness>
<dither-pattern>I2</dither-pattern>
<visible>true</visible>
<transparent>false</transparent>
<width>1</width>
<marked>false</marked>
<animation>0</animation>
<name>PolySiHeads</name>
<source>7/0@1</source>
</properties>
<properties>
<frame-color>#ffa080</frame-color>
<fill-color>#ffa080</fill-color>
<frame-brightness>0</frame-brightness>
<fill-brightness>0</fill-brightness>
<dither-pattern>I0</dither-pattern>
<visible>true</visible>
<transparent>false</transparent>
<width>1</width>
<marked>false</marked>
<animation>0</animation>
<name>Via2</name>
<source>8/0@1</source>
</properties>
<properties>
<frame-color>#000080</frame-color>
<fill-color>#000080</fill-color>
<frame-brightness>0</frame-brightness>
<fill-brightness>0</fill-brightness>
<dither-pattern>I12</dither-pattern>
<visible>true</visible>
<transparent>false</transparent>
<width>1</width>
<marked>false</marked>
<animation>0</animation>
<name>Metal2</name>
<source>10/0@1</source>
</properties>
<properties>
<frame-color>#ffa080</frame-color>
<fill-color>#ffa080</fill-color>
<frame-brightness>0</frame-brightness>
<fill-brightness>0</fill-brightness>
<dither-pattern>I1</dither-pattern>
<visible>true</visible>
<transparent>false</transparent>
<width>1</width>
<marked>false</marked>
<animation>0</animation>
<name>Margins</name>
<source>11/0@1</source>
</properties>
<properties>
<frame-color>#805000</frame-color>
<fill-color>#805000</fill-color>
<frame-brightness>0</frame-brightness>
<fill-brightness>0</fill-brightness>
<dither-pattern>I0</dither-pattern>
<visible>true</visible>
<transparent>false</transparent>
<width>1</width>
<marked>false</marked>
<animation>0</animation>
<name>Dicing Lines</name>
<source>12/0@1</source>
</properties>
<custom-dither-pattern>
<pattern>
<line>................................</line>
<line>................................</line>
<line>................................</line>
<line>................................</line>
<line>................................</line>
<line>................................</line>
<line>................................</line>
<line>................................</line>
<line>................................</line>
<line>................................</line>
<line>................................</line>
<line>................................</line>
<line>................................</line>
<line>................................</line>
<line>................................</line>
<line>................................</line>
<line>................................</line>
<line>................................</line>
<line>................................</line>
<line>................................</line>
<line>................................</line>
<line>................................</line>
<line>................................</line>
<line>................................</line>
<line>................................</line>
<line>................................</line>
<line>................................</line>
<line>................................</line>
<line>................................</line>
<line>................................</line>
<line>................................</line>
<line>................................</line>
</pattern>
<order>1</order>
<name></name>
</custom-dither-pattern>
</layer-properties>
|
13
|
Fri Aug 14 16:45:25 2009 |
Stephan Hänsel | | Module - Setups | | | | |
- 5mm Inbus-Schlüssel
- 3mm Inbus Schlüssel
- 6- 2(1) x 30 Pt-Pins
- beim 5mm-Sockel müssen die 2 Löcher über die das optische Modul h03 verschraubt wird noch ausgeweitet werden (Thomas)
- bei Pt-Deckel oben einzeichnen welche Balkenstellung welchem Winkel entspricht
(SK) ... SenkKopf
(ZK) ... ZylinderKopf
OPTISCHER SETUP - Setup-alignment-modules
upstream - BEAM VON UNTEN - APV-Nummerierung in Beamrichtung von links anfangend
1) Collimator
- Alu-Spacer (neuer = höheren verwenden) + 4- M6 x 15 (ZK)
- schwarzer-Spanier-x-y-z-Tisch - Schreuben dabei -> Plastikschrauben abschneiden ?!?
2) 5mm Spacer + h03 - backplane richtung Collimator - APV3210
- 2- M4 x 15 (SK) - 5mm Spacer durch Alignment-Boden mit h03 verschrauben
- 3- M4 x 15 (SK) - Alignment-Boden auf Drehteller verschrauben
3) h04 - backplane richtung Collimator - APV3210
- 2 Positionen
- 2- M4 x 10 (SK)
Pt + ITE-512-Stack + 3 SiLC08-Module
upstream - BEAM VON UNTEN - APV-Nummerierung in Beamrichtung von links anfangend
1) h06-ITE-512 - APV0123 (allerdings nur eineinhalb APVs gebondet!)
2) h05-ITE-512 - APV0123
3) h07-ITE-512 - APV3210 !!!
4) SiLC08-2 - APV12 - 90° gedreht
5) SiLC08-1 - APV12 - 90° gedreht
6) SiLC08-0 - APV12 - 90° gedreht
Stack 1) bis 6)
- schwarzer Sockel +4- M4 x 35 (ZK) -> verschraubt in h06 und h07
- 2 Gewindestangen M6 x 80 + 4 Scheiben + 4 Muttern M6 -> die 3 ITE-512er zusammen
- 3 Gewindestangen M6 x 160 + 6 Scheiben + 5 Flügelmuttern M6 + 1 Mutter M6 -> 3- SiLC08-Module VORSICHTIG dazu
7) h02-Pt - APV0123 - überprüfen - kann rotieren ;-)
- Schrauben gehen von oben (ausserhalb der Box): Balken - Box-Deckel - Beilagscheibe - Pt-Modul
- Balken + 4- 2(1) x 30 Pins + 2- Scheiben + 2- M4 x 20
8) h01-Pt - APV0123 - überprüfen - kann rotieren;-)
- Schrauben gehen von oben (ausserhalb der Box): Balken - Box-Deckel - Beilagscheibe - Pt-Modul
- Balken + 4- 2(1) x 30 Pins + 2- Scheiben + 2- M4 x 20
ITE128-Stack
upstream - BEAM VON UNTEN - APV-Nummerierung in Beamrichtung von links anfangend
1) h21_alignment-TS05 - APV12 - 90°gedreht
2) h13_ITE-PAS - APV1
3) h14_ITE-PAS - APV1
4) h15_ITE-PAD - APV1
5) h16_ITE-PAD - APV1
6) h11_ITE-STD - APV1
7) h12_ITE-STD - APV1
8) h22-alignment-TS07 - APV12 - 90°gedreht
Schrauben verwenden je nach Sockel und Spacer
SiLC08-Stack
upstream - BEAM VON UNTEN - APV-Nummerierung in Beamrichtung von links anfangend
1) SiLC08-7 - APV12 - Überprüfen
2) SiLC08-6 - APV12 - Überprüfen
3) SiLC08-5 - APV12 - Überprüfen
4) SiLC08-4 - APV12 - Überprüfen
5) SiLC08-3 - APV12 - Überprüfen
6) SiLC08-2 - APV12 - Überprüfen
7) SiLC08-1 - APV12 - Überprüfen
8) SiLC08-0 - APV12 - Überprüfen
Schrauben verwenden je nach Sockel und Spacer |
14
|
Fri Aug 14 19:35:43 2009 |
Thomas Bergauer | Pt_ITE512 | intcal | | | | |
HV=100V except h05-ITE-512 and h06-ITE-512 (runaway, HV off)
h01-Pt: 10uA
h02-Pt: 1.6uA
3 SiLC DUTs mit je ca. 38nA
h07-ITE-512: 3.77uA
h05-ITE-512: breakthrough
h06-ITE-512: breakthrough |
15
|
Fri Aug 14 21:36:17 2009 |
Markus Friedl | | Config files | | | | |
Status of config files as of Friday 14 August 2009 late evening
Config file name |
Timing adjusted |
Sensor definition |
Tested |
cern09_ite128_single1 |
YES |
NOT YET (?) |
YES |
cern09_ite128_multi6
|
YES |
NOT YET (?) |
YES |
cern09_pt_ite512_single1
|
YES |
NOT YET (?) |
YES |
cern09_pt_ite512_multi6
|
YES |
NOT YET (?) |
NO |
cern09_alignment_beam_single1
|
YES |
NOT YET (?) |
YES |
cern09_alignment_beam_multi6
|
YES |
NOT YET (?) |
YES |
cern09_belle_single
|
YES |
NOT YET (?) |
YES |
cern09_belle_multi6
|
YES |
NOT YET (?) |
YES |
cern09_silc_all_single |
YES (2008) |
YES (2008) |
NO |
cern09_silc_all_multi6 |
YES (2008) |
YES (2008) |
NO |
|
17
|
Wed Aug 19 15:41:17 2009 |
Wolfgang Kiesenhofer | SiLC | angle scan templates | | | | |
Linie am rechten Seitenrand (in der Vorschau unten leider nicht gut zu sehen) sollte mit dem rechten Rand der Basisplatte abschließen (bezogen auf die Beam Richtung). |
Attachment 1: angle_scan0.pdf
|
Attachment 2: angle_scan5.pdf
|
Attachment 3: angle_scan10.pdf
|
Attachment 4: angle_scan15.pdf
|
Attachment 5: angle_scan20.pdf
|
Attachment 6: angle_scan25.pdf
|
Attachment 7: angle_scan30.pdf
|
Attachment 8: angle_scan35.pdf
|
Attachment 9: angle_scan40.pdf
|
Attachment 10: angle_scan45.pdf
|
Attachment 11: angle_scan50.pdf
|
Attachment 12: angle_scan55.pdf
|
Attachment 13: angle_scan60.pdf
|
20
|
Wed Aug 19 22:57:13 2009 |
Marko Dragicevic | | How-To | | | | |
TLU (run from DAQPCHEPHY):
ssh eudet@eudetmac001.cern.ch
ssh tlupc
~\eudaq\bin\TLUControl.exe -d1 -a12
-t100 internal trigger
-aXX Mask for Szintis:
1 4 mm (front)
2 4 mm (front)
4 9 mm (back)
8 9 mm (back)
DAQ:
Hostname: DAQPCHEPHY.CERN.CH
XY Table PC:
Hostname: XYPCEUDET.CERN.CH
Beam Control:
Hostname: cwo-hna453-h6b1.cern.ch
137.138.61.206
Eudet DAQ:
vnc eudetmac001.cern.ch
Cycle Run:
o) stop DAQ
o) kill eudaq Run Control
o) restart: ./STARTRUN.FORTIS.1
o) load config: testfortis_with_eudrb_beam_backpressure_WITH_SILC
o) press: Config (wait ~1 min.)
o) press: Start |
33
|
Thu Aug 20 15:54:45 2009 |
Manfred Valentan | BELLE | temp/humidty logger data | | | | |
position: underneath telescope. dewpoint ~ 15 degree
test with chiller: running 4 hours at 15 degress: NO condensation on alu pipe |
Attachment 1: easylog_under_telescope.gif
|
|
55
|
Fri Aug 21 17:14:58 2009 |
Wolfgang Kiesenhofer | | S/N Histograms Raw (no data selection) | run001 (strips), run002 (pitch adapter), run003 (upper edge) | | | |
|
Attachment 1: sn_langaufit_raw_strips.pdf
|
Attachment 2: sn_langaufit_raw_pa.pdf
|
Attachment 3: sn_langaufit_raw_edgerun.pdf
|
58
|
Fri Aug 21 22:42:32 2009 |
Thomas Bergauer | common | EUDAQ config file used when running with telescope | | | | |
Used until Friday, 21.08.09:
AndMask = 0xf # 4x4 mm scintillator for trigger
Used since Friday, 21.08.09:
AndMask = 0xc # 9x9 mm scintillator for trigger
Local trigger using TLU only: ALWAYS WITH 9x9mm scintillator
|
Attachment 1: testfortis_with_eudrb_beam_backpressure_WITH_SILC.conf
|
[RunControl]
RunSizeLimit = 1800000000
NoTrigWarnTime = 10
[DataCollector]
[LogCollector]
SaveLevel = EXTRA
PrintLevel = INFO
[Producer.TLU]
AndMask = 0xc # 9x9 mm scintillaotr for trigger
#AndMask = 0xf # 4x4 mm scintillator for trigger
OrMask = 0
VetoMask = 0
# EUDRB plugged into DUT#4 , FORTIS plugged into DUT#1, SiLC plugged into DUT#0
#DutMask = 20 # EUDRB, FORTIS, SiLC in
DutMask = 17 # FORTIS, SiLC in
EnableDUTVeto = 2#0
TriggerInterval = 0
TrigRollover = 0
StrobePeriod = 16000000
StrobeWidth = 480000
[Producer.EUDRB]
Version = 2
Det = MIMOTEL
Mode = ZS
Unsynchronized = 1
AdcDelay = 3
ClkSelect = 2
#Marker1 = 0xff
#Marker2 = 0xff
PostDetResetDelay = 4
PedestalFile = auto
IDOffset = 0
NumBoards = 6
Board0.Slot = 3
Board1.Slot = 5
Board2.Slot = 7
Board3.Slot = 9
Board4.Slot = 11
Board5.Slot = 13
[Producer.FORTIS]
# Need \ not / for directory name with Cygwin...
# ExecutableDirectory = /home/cussans/optodaq/halsall_test_v5/
ExecutableDirectory = /home/cussans/optodaq/MyF11/
# ExecutableDirectory = /home/cussans/optodaq/MyF10/
ExecutableProcessName = optodaqV.exe
#ExecutableFilename = test_run_128_block_mod_C2.bat
ExecutableFilename = test_run_512_128_block_mod_CX.bat
# ExecutableFilename = test_run_512_448_block_mod_full.bat
ExecutableArgs =
NumRows = 512
NumColumns = 128
|
65
|
Sat Aug 22 11:54:49 2009 |
Thomas Bergauer | common | beam profile | | | | |
beam shifted a bit in vertical direction downwards since 21. August 09 evening
Beam configuration:
Beam configuration file: H6b.802 (FM HAD (P0 off, H8=+180) PARLALLEL IN H6B SILC 2008 |
Attachment 1: 20090822_1150_beam_conditions.jpg
|
|
67
|
Sat Aug 22 13:28:53 2009 |
Wolfgang Kiesenhofer | Pt_ITE512 | runlist for pt-module angle-scan | | | | |
Preliminary run list for pt-modules + ite512 + silc1, silc2, silc5, silc6
run |
angle[deg] |
pos |
height (xy-table) |
importance |
events |
1 |
1 |
center module |
|
+ |
10k |
2 |
2 |
center module |
|
+ |
10k |
3 |
3 |
center module |
|
+ |
10k |
4 |
4 |
center module |
|
+ |
10k |
5 |
5 |
center module |
|
+ |
10k |
6 |
6 |
center module |
|
+ |
10k |
7 |
7 |
center module |
|
+ |
10k |
8 |
8 |
center module |
|
+ |
10k |
9 |
9 |
center module |
|
+ |
10k |
10 |
10 |
center module |
|
+ |
10k |
11 |
12 |
center module |
|
+ |
10k |
12 |
14 |
center module |
|
- |
10k |
13 |
16 |
center module |
|
- |
10k |
14 |
0 |
center module |
|
+ |
? depends on ite512 |
15 |
0 |
upper pos |
|
+ |
10k |
16 |
0 |
lower pos |
|
+ |
10k |
|
71
|
Sat Aug 22 15:12:44 2009 |
Thomas Bergauer | common | beam profile | | | | |
playing with TRIM4 in vertical plane (setting to 20A current) shifted beamspot back to center position
Beam configuration:
Beam configuration file: H6b.802 (FM HAD (P0 off, H8=+180) PARLALLEL IN H6B SILC 2008
Rate: 3.35E5 particles/spill (measured with SCINT8 in beamline)
Particle Production Applet
Calculator applet
For +120 Gev/c beam:
Pi+ |
55.67 % |
p |
38.95 % |
K+ |
5.38 % |
|
Attachment 1: 20090822_1511_beam_conditions.jpg
|
|
80
|
Sun Aug 23 13:15:42 2009 |
Marko Dragicevic | Pt_ITE512 | Current and Humindity during first Run | | | | |
Current of Pt modules during first run
Data of the run was dicarded.
Compressed air flow was at ~2 bars during run. Graph shows RH rise after switching of CA flow. Restarted at around 7% with very low pressure.
Timescales for RH and I graph are different!!!
after 3 hours first bottle of compressed air (dewpoint -170 degree C) is gone and sensor Pt-h01 starts to fluctuate again
Current of ITE512 plus 2 SiLC08 modules
HV=70V, Current: 25uA first, 29uA then, 35uA latest. now stable
|
Attachment 1: IandRH_first_Pt_run.png
|
|
Attachment 2: Picture_1.png
|
|
84
|
Sun Aug 23 23:38:27 2009 |
Georg Auzinger | | Phone numbers | | | | |
Georg #70
Wolfgang - Building: 41, Room: 204, Tel: ?
Manfred: Building 38, Room 522, Tel: 70522
Chrisu: B39, room 309, Tel: 79309
Bergi: Tel Zimmer: 79112, Handy: 16-2471
Maks: Tel Zimmer: 79117 |
94
|
Tue Aug 25 09:00:51 2009 |
Thomas Bergauer | | beam conditions | | | | |
manually changed TRIM3, TRIM4 and TRIM6 |
Attachment 1: magnet_settings_withH6B.802.jpg
|
|
Attachment 2: 20090825_0859_beam_conditions.jpg
|
|
106
|
Wed Aug 26 14:26:13 2009 |
Wolfgang Kiesenhofer | ITE128 | S/N final Single-Metal | run001 & run002 | | | |
Most probable S/N, Single Metal Layer, 2D histogram fitted with langau in 5 bin (strips) slices. |
Attachment 1: sn-pos_h13-h14_strips_pa_5bins.pdf
|
107
|
Wed Sep 2 14:15:17 2009 |
Wolfgang Kiesenhofer | ITE128 | ITE 128 Cross-Talk | run002 | | | |
Preliminary strip correlation (Kendalls Tau) for threshold = 3*stripnoise. |
Attachment 1: stripcorr_modall_thrs3_ktau.pdf
|
114
|
Fri Dec 4 12:21:56 2009 |
Wolfgang Kiesenhofer | | ITE128 strip correlation kendall tau (preliminary result) | | | | |
Kendall tau (rank correlation) for module 1 (single layer 1 / h13), module 2 (single layer 2 / h14), module 6 (standard sensor 2 / h12)
|
Attachment 1: stripcorr_mod1_thrs5_ktau_ev100000_run002_strip.pdf
|
Attachment 2: stripcorr_mod2_thrs5_ktau_ev100000_run002_strip.pdf
|
Attachment 3: stripcorr_mod6_thrs5_ktau_ev100000_run002_strip.pdf
|