Wed Mar  7 16:58:36 2012, Christian Irmler, BELLE, Origami Module #4, cal113, 100k, 07.03.2012  16:40:04 , 07.03.2012  16:57:08, Unknown 
 |  
Sr90, small (new) scintillator, new trigger unit
 
Origami Mod. #4
 
HV=+-40V, Ibias=1,6µA |  
   Wed Mar  7 16:03:30 2012, Christian Irmler, BELLE, Origami Module #4, run113, 100k, 07.03.2012  16:07:34, 07.03.2012  16:30:48 , Unknown  
 |  
Sr90, small (new) scintillator, new trigger unit
 
Origami Mod. #4
 
HV=+-40V, Ibias=1,6µA |  
   Wed Mar  7 15:44:25 2012, Christian Irmler, BELLE, Origami Module #4, cal112, 83800, 07.03.2012  15:42:53, , Unknown 
 |  
Sr90, small (new) scintillator, new trigger unit
 
Origami Mod. #4
 
HV=+-40V, Ibias=1,6µA |  
   Wed Mar  7 15:12:42 2012, Christian Irmler, BELLE, Origami Module #4, run112, 100k, 07.03.2012  15:13:18,  07.03.2012  14:31:07, Unknown 
 |  
Sr90, small (new) scintillator, new trigger unit
 
Origami Mod. #4
 
HV=+-40V, Ibias=1,6µA |  
   Mon Mar  5 19:27:56 2012, Christian Irmler, BELLE, Origami Module #4, run111, 50k, 05.03.2012  19:26:28, , Unknown 
 |  
Sr90, large scintillator, 
 
Origami Mod. #4
 
HV=+-40V, Ibias=1,30µA |  
   Mon Mar  5 19:06:41 2012, Christian Irmler, BELLE, Origami Module #4, cal110, 83800, 05.03.2012  19:05:52, 05.03.2012  19:17:01, Unknown 
 |  
Sr90, large scintillator, 
 
Origami Mod. #4
 
HV=+-40V, Ibias=1,9µA |  
   Mon Mar  5 18:41:23 2012, Christian Irmler, BELLE, Origami Module #4, run110, 100k, 05.03.2012  18:45:21, 05.03.2012  19:04:30, Unknown 
 |  
Sr90, large scintillator, 
 
Origami Mod. #4
 
HV=+-40V, Ibias=1,9µA |  
   Mon Mar  5 18:08:02 2012, Christian Irmler, BELLE, Origami Module #4, cal109, 83800, 05.03.2012  18:07:40, 05.03.2012  18:18:32, Unknown 
 |  
Sr90, large scintillator, 
 
Origami Mod. #4
 
HV=+-40V, Ibias=1,9µA |  
   Mon Mar  5 17:36:46 2012, Christian Irmler, BELLE, Origami Module #4, run109, 100k, 05.03.2012  17:36:19 , 05.03.2012  17:55:24 , Unknown 
 |  
Sr90, large scintillator, 
 
Origami Mod. #4
 
HV=+-40V, Ibias=1,9µA |  
   Mon Mar  5 17:35:31 2012, Christian Irmler, BELLE, Origami Module #4, cal108, 83800, 05.03.2012  16:47:51, 05.03.2012  17:05:16, Unknown  
 |  
Sr90, large scintillator, 
 
Origami Mod. #4
 
HV=+-40V, Ibias=1,9µA |  
   Mon Mar  5 17:34:43 2012, Christian Irmler, BELLE, Origami Module #4, run108, 100k, , 05.03.2012  16:24:12, Unknown 
 |  
Sr90, large scintillator, 
 
Origami Mod. #4
 
HV=+-40V, Ibias=1,9µA |  
   Wed Feb 22 18:32:24 2012, Christian Irmler, BELLE, Origami Module #4, run107, 50k, 22.02.2012  18:30:33, 22.02.2012  18:40:11, Good   
 |  
Sr90, large scintillator, 
 
Origami Mod. #4
 
HV=+-40V, Ibias=1,6µA |  
   Wed Feb 22 18:10:29 2012, Christian Irmler, BELLE, Origami Module #4, run106, 50k, 22.02.2012  17:39:10 , 22.02.2012  18:23:47, Good  
 |  
Sr90, large scintillator, 
 
Origami Mod. #4
 
HV=+-40V, Ibias=1,6µA |  
   Wed Feb 22 17:38:29 2012, Christian Irmler, BELLE, Origami Module #4, run105, 100k, 22.02.2012  17:39:10 , 22.02.2012  17:58:01, Good  
 |  
Sr90, large scintillator, 
 
Origami Mod. #4
 
HV=+-40V, Ibias=1,6µA |  
   Wed Feb 22 17:25:34 2012, Christian Irmler, BELLE, Origami Module #4, cal105, 83800, 22.02.2012  17:23:13 , 22.02.2012  17:34:27, Good 
 |  
Sr90, large scintillator, 
 
Origami Mod. #4
 
HV=+-40V, Ibias=1,6µA |  
   Wed Feb 22 16:49:29 2012, Christian Irmler, BELLE, Origami Module #4, cal104, 83800, 22.02.2012  16:51:13, 22.02.2012  17:02:11, Good 
 |  
Sr90, large scintillator, 
 
Origami Mod. #4
 
HV=+-40V, Ibias=1,6µA |  
   Wed Feb 22 16:21:23 2012, Christian Irmler, BELLE, Origami Module #4, run104, 100k, 22.02.2012  16:22:34, 22.02.2012  16:41:26, Good   
 |  
Sr90, large scintillator, 
 
Origami Mod. #4
 
HV=+-40V, Ibias=1,6µA |  
   Wed Feb 22 13:37:11 2012, Christian Irmler, BELLE, Origami Module #4, run103, 100k, 22.02.2012  13:35:08, 22.02.2012  13:54:08 , Crap 
 |  
Sr90, large scintillator, 
 
HVret @ Origami closed
 
HVret @ SMU connected |  
   Wed Feb 22 13:17:34 2012, Christian Irmler, BELLE, Origami Module #4, cal102, 83800, 22.02.2012  13:11:30, 22.02.2012  13:25:18, Good 
 |  
Sr90, large scintillator, HVret @ Origami open
 
Origami Mod. #4
 
HV=+-40V, Ibias=1,8µA |  
   Wed Feb 22 12:15:11 2012, Christian Irmler, BELLE, Origami Module #4, run102, 170k, 22.02.2012  12:31:08, 22.02.2012  13:03:27 , Good 
 |  
same as run101
 
Sr90, large scintillator, HVret @ Origami open
 
Origami Mod. #4 |  
   Mon Feb 20 17:27:02 2012, Christian Irmler, BELLE, Origami Module #4, run101, 24497, 20.02.2012  17:33:33, 20.02.2012  17:38:21, Good 
 |  
Sr90, large scintillator, HVret @ Origami open
 
Origami Mod. #4
 
HV=+-40V, Ibias=2,03µA |  
   Mon Feb 20 17:20:20 2012, Christian Irmler, BELLE, Origami Module #4, cal100, 50k, 20.02.2012  17:19:03, 20.02.2012  17:29:58, Good 
 |  
Sr90, large scintillator, HVret @ Origami open
 
Origami Mod. #4
 
HV=+-40V, Ibias=2,03µA |  
   Mon Feb 20 17:17:27 2012, Christian Irmler, BELLE, Origami Module #4, run100, 50k, 20.02.2012  17:07:21, 20.02.2012  17:17:22, Good 
 |  
Sr90, large scintillator, HVret @ Origami open
 
Origami Mod. #4
 
HV=+-40V, Ibias=2,03µA |  
   Thu Oct 20 11:49:14 2011, Markus Friedl, common, Scintillator dimensions, , , , , Good   
 |  
|   |  
   Thu Oct 13 13:08:38 2011, Thomas Bergauer, common, end of success, , , , , Unknown 
 |  
|   |  
   Mon Oct 10 21:55:30 2011, Marko Dragicevic, Micron, Internal Calibration, cal013, 83800, 10.10.2011  21:52:32, , Unknown 
 |  
micronbaby p-spray/irrad
 
HV = -100V
 
beam on, baseline of irrad APV reduced |  
   Mon Oct 10 21:54:24 2011, Marko Dragicevic, Micron, Micron-Baby-Stack p-spray, run bottom right, run027, 700k, 10.10.2011  22:40:31, 11.10.2011  09:49:11, Unknown 
 |  
hit modules in bottom left corner -> Zones narrow and half-narrow for COMB_IRRAD, Zones wide and half-wide for COMM_IRRAD
 
timing corrected w.r.t. run004
 
Position of HEPHY x-z-table: |  
   Mon Oct 10 16:26:20 2011, Marko Dragicevic, CNM, CNM stack, run026, 300000, 10.10.2011  16:23:46, 10.10.2011  20:30:00, Good 
 |  
no cooling
 
beam on; xy table position x=328  y=69.5
 
HV_CNM=20V, HV_BSTD1-N=200V |  
   Mon Oct 10 14:11:53 2011, Christian Irmler, CNM, CNM stack, run025, 110000, 10.10.2011  14:09:00, 10.10.2011  16:11:57, Good 
 |  
no cooling
 
beam on; xy table position x=335.5  y=79.5
 
HV_CNM=20V, HV_BSTD1-N=200V |  
   Mon Oct 10 12:32:42 2011, Manfred Valentan, CNM, CNM stack configuration, , , , , Unknown   
 |  
Module order:
 
CNM-V1 (draws a lot of current, gives only low signal)
 
BSTD1-N (for height information) |  
   Mon Oct 10 12:16:06 2011, Marko Dragicevic, common, Beam Profile and Magnet BeamRef Settings , , , , , Unknown   
 |  
Beam Profile from H6A, 10.10.2011 11:40
 
BeamRef settings for all magnets, File H6B.702 |  
   Mon Oct 10 12:15:52 2011, Manfred Valentan, CNM, CNM stack, run024, 110000, 10.10.2011  12:03:58, 10.10.2011  14:05:56, Good 
 |  
no cooling
 
beam on; xy table position x=320.5  y=79.5
 
HV_CNM=20V, HV_BSTD1-N=200V |  
   Mon Oct 10 10:37:52 2011, Christian Irmler, CNM, CNM stack, cal012, 83800, 10.10.2011  11:29:55, 10.10.2011  11:40:55, Unknown 
 |  
no cooling
 
beam on; xy table position x=330  y=64
 
HV_CNM=20V, HV_BSTD1=200V |  
   Mon Oct 10 00:50:23 2011, Christian Irmler, HPK, baby_add, run023, 680k, 10.10.2011  00:51:26, 10.10.2011 09:15:35, Good 
 |  
no cooling
 
beam on; xy table position x=330  y=74
 
HV=200V Istart_PY=1,9uA;  Istart_N=0.27uA |  
   Sun Oct  9 13:12:32 2011, Karl-Heinz Hoffmann, HPK, baby_add, run022, 670k, 09.10.2011  13:09:32, 10.10.2011  00:48:16, Good 
 |  
no cooling
 
beam on; xy table position x=330  y=64
 
HV=200V Istart_PY=1,9uA;  Istart_N=0.27uA |  
   Sun Oct  9 11:31:43 2011, Manfred Valentan, HPK, HPK BADD stack configuration, , , , , Unknown  
 |  
Module order:
 
BADD1-N
 
BADD2-N |  
   Sun Oct  9 11:28:30 2011, Manfred Valentan, HPK, HPK BSTD stack configuration, , , , , Unknown   
 |  
Module order:
 
BSTD1-N
 
BSTD2-N |  
   Sun Oct  9 11:00:33 2011, Karl-Heinz Hoffmann, HPK, baby_add, run021, 150000, 09.10.2011  10:56:47, 09.10.2011 12:47:23, Good 
 |  
no cooling
 
beam on; xy table position x=330  y=74
 
HV=200V Istart_PY=1,9uA;  Istart_N=0.27uA |  
   Sun Oct  9 10:13:11 2011, Karl-Heinz Hoffmann, HPK, baby_add, cal011, 83800, 09.10.2011  10:05:01, , Good 
 |  
no cooling
 
beam on; xy table position x=  y=
 
HV=200V Istart_P=1.5uA;  Istart_N=0.22uA |  
   Sun Oct  9 10:05:34 2011, Markus Friedl, HPK, baby_std, cal010, 83800, 08.10.2011  13:36:25, 08.10.2011  13:54:07, Good 
 |  
HV=+-40V, 
 
no cooling
 
beam off; xy table position x=  y= |  
   Sat Oct  8 23:27:44 2011, Karl-Heinz Hoffmann, HPK, baby_std, run020, 382000, 08.10.2011  23:24:16, 09.10.2011  09:24:20, Good 
 |  
no cooling
 
beam on; xy table position x=327,5  y=65
 
HV=200V Istart_PY=8.2uA;  Istart_N=0.45uA |  
   Sat Oct  8 20:33:58 2011, Karl-Heinz Hoffmann, HPK, baby_std, run019, 150000, 08.10.2011  20:22:45, 08.10.2011 23:19:23, Good 
 |  
no cooling
 
beam on; xy table position x=333  y=80
 
HV=200V Istart_PY=8.2uA;  Istart_N=0.45uA |  
   Sat Oct  8 16:45:14 2011, Thomas Bergauer, HPK, baby_std, run018, 150000, 08.10.2011  16:44:13, 08.10.2011 19:33:33, Good 
 |  
no cooling
 
beam on; xy table position x=322  y=80
 
HV=200V Istart_PY=8.2uA;  Istart_N=0.45uA |  
   Sat Oct  8 16:35:04 2011, Thomas Bergauer, HPK, baby_std, run017, , 08.10.2011  16:26:10, , Crap 
 |  
wrong timing
 
 
 
no cooling |  
   Sat Oct  8 14:33:25 2011, Thomas Bergauer, HPK, baby_std, run016, 250k, 08.10.2011  14:31:40, , Crap 
 |  
falsches config file (single statt multi6)
 
 
 
no cooling |  
   Sat Oct  8 09:30:44 2011, Christian Irmler, BELLE, Cooling plant tests, , , 08.10.2011  09:30, , Unknown   
 |  
Software run with 6 samples to ensure that APV chips dissipate full power.
 
DAQ data not saved, bias current monitored
 
new longterm files: |  
   Sat Oct  8 00:14:37 2011, Christian Irmler, BELLE, Origami stack, run015, 180111, 08.10.2011  00:06:41, 08.10.2011  08:24:38, Good 
 |  
Origami6
 
HV=+-40V, 
 
no cooling |  
   Fri Oct  7 19:35:14 2011, Christian Irmler, BELLE, Origami stack cooled, run014, 90k, 07.10.2011  19:49:26, 07.10.2011  23:26:52, Good 
 |  
Origami6
 
HV=+-40V,
 
CO2 cooling: P_TT_4: 14.9 bar, mf=0.9 g/s |  
   Fri Oct  7 18:40:07 2011, Christian Irmler, BELLE, Origami stack cooled, cal009, 83800, 07.10.2011  18:35:04 , 07.10.2011  19:31:51, Good 
 |  
Origami6
 
HV=+-40V,
 
CO2 cooling: P_TT_4: 14.9 bar, mf=0.9 g/s |  
   Fri Oct  7 18:28:53 2011, Christian Irmler, common, run schedule, , , , , Unknown   
 |  
|   |  
   Fri Oct  7 10:13:12 2011, Christian Irmler, BELLE, Origami stack cooled, run013, 185k, 07.10.2011  10:02:20, 07.10.2011  17:17:32, Good 
 |  
HV=+-40V, 
 
CO2 cooling: P_TT_4: 18.2 bar, mf=1 g/s
 
beam on; xy table position x=321 y=99 |  
   Fri Oct  7 00:20:15 2011, Christian Irmler, BELLE, Origami stack cooled, run012, 250k, 07.10.2011  00:15:54 , 07.10.2011  09:13:55, Good 
 |  
HV=+-40V, 
 
CO2 cooling: P_TT_4: 18.2 bar, mf=1 g/s
 
beam on; xy table position x=352 y=89 |  
   Thu Oct  6 17:36:47 2011, Christian Irmler, BELLE, Origami stack cooled, run011, 180000, 06.10.2011  17:06:38, 07.10.2011  00:04:06, Good 
 |  
HV=+-40V, 
 
CO2 cooling: P_TT_4: 18.2 bar, mf=1 g/s
 
beam on; xy table position x=260.8 y=60.25 |  
   Thu Oct  6 15:57:51 2011, Christian Irmler, BELLE, Origami stack cooled, cal008, 83800, 06.10.2011  15:53:20, 06.10.2011  16:25:29  , Good 
 |  
HV=+-40V, 
 
CO2 cooling: P_TT_4: 18.2 bar, mf=1 g/s
 
beam on; xy table position x=306 y=76.5 |  
   Thu Oct  6 09:22:34 2011, Christian Irmler, BELLE, Origami stack cooled, run010, 330k, 05.10.2011  20:46:30, 06.10.2011  09:12:24 , Good 
 |  
HV=+-40V, 
 
CO2 cooling: P_TT_4: 18.2 bar, mf=0.9 g/s
 
beam on; xy table position x=306 y=76.5 |  
   Wed Oct  5 20:49:11 2011, Markus Friedl, BELLE, Origami stack cooled, run009, 330k, 05.10.2011  20:46:30, 06.10.2011  09:12:24 , Good 
 |  
HV=+-40V, 
 
CO2 cooling: P_TT_4: 18.2 bar, mf=0.9 g/s
 
beam on; xy table position x=306 y=76.5 |  
   Wed Oct  5 20:28:00 2011, Markus Friedl, BELLE, Origami stack cooled, run008, 10582, 05.10.2011  20:25:10, 05.10.2011  20:45:10, Good 
 |  
HV=+-40V, 
 
CO2 cooling: P_TT_4: 18.2 bar, mf=0.9 g/s
 
beam on |  
   Wed Oct  5 19:57:15 2011, Christian Irmler, BELLE, Origami stack cooled , run007, 17845, 05.10.2011  18:27:51, 05.10.2011  19:31:43, Crap 
 |  
Run stopped after 17845 events, because of bad trigger timing
 
 
Origami6 |  
   Wed Oct  5 19:33:40 2011, Markus Friedl, common, Trigger condition, , , 4.10.2011  15:00, ,   
 |  
Changed trigger such that off-spill scintillator triggers are vetoed.
 
Inserted Flip-Flop which is set by begin of spill (WWE) and reset by end of spill signal (EE). Out-bar is put in coincidence with the scintillator 
trigger. |  
   Wed Oct  5 17:54:09 2011, Christian Irmler, BELLE, Origami stack cooled, cal007, 83800, 05.10.2011  17:51:57 , , Good 
 |  
I2C setting modified to improve the shape of the p-side signal --> shaping time reduced, pulse height still low
 
Origami6
 
HV=+-40V |  
   Wed Oct  5 16:43:00 2011, Christian Irmler, BELLE, Origami stack cooled, cal006, 83800, 05.10.2011  16:40:18, 05.10.2011  17:12:27, Good 
 |  
Origami6
 
HV=+-40V
 
beam on |  
   Wed Oct  5 13:00:41 2011, Christian Irmler, BELLE, Origami stack cooled , run006, 24692, 05.10.2011  12:55:53, 05.10.2011  14:05:49, Crap 
 |  
Run stopped after 24692 events, because all n-side APV failed due to a shortcut of a capacitor (C223) on n-side rebo
 
Origami6
 
HV=+-40V |  
   Wed Oct  5 12:09:00 2011, Christian Irmler, BELLE, Origami stack cooled wrong I2C settings, cal005, 83800, 05.10.2011  12:04:50, 05.10.2011  12:37:11, Crap 
 |  
This calibration file can not be used, due to wrong I2C settings!
 
Origami6
 
HV=+-40V |  
   Tue Oct  4 22:11:12 2011, Christian Irmler, BELLE, Origami stack, run005, 330000, 04.10.2011  22:09:37, 05.10.2011  09:11:54, Crap 
 |  
Origami6
 
HV=+-40V, no cooling
 
beam on |  
   Tue Oct  4 21:40:52 2011, Christian Irmler, BELLE, Origami stack, cal004, 83800, 04.10.2011  21:18:09, 04.10.2011  21:50:23, Good 
 |  
Origami6
 
HV=+-40V, no cooling
 
beam on |  
   Tue Oct  4 15:16:45 2011, Manfred Valentan, Micron, Micron-Baby-Stack p-spray, run bottom right NOT USABLE, run004, 200k, 4.10.2011 15:28:48, 04.10.2011  19:36:50, Crap 
 |  
HAS TO BE REPEATED!!! Before this run there were changes in the trigger line (vetoing the trigger when no spill), and thus the timing is incorrect.
 
hit modules in bottom right corner -> Zones narrow and half-narrow for COMB_IRRAD, Zones wide and half-wide for COMM_IRRAD
 
Position of HEPHY x-z-table: |  
   Tue Oct  4 15:16:06 2011, Manfred Valentan, Micron, Micron-Baby-Stack p-spray, run bottom left, run003, 200k, 04.10.2011  11:29:19, 04.10.2011  13:57:54, Good 
 |  
hit modules in bottom left corner -> Zones wide and half-wide for COMB_IRRAD, Zones narrow and half-narrow for BOMM_IRRAD
 
Position of HEPHY x-z-table:
 
x = 336 |  
   Tue Oct  4 10:47:59 2011, Manfred Valentan, Micron, Internal Calibration, cal001, 83800, 03.10.2011  20:34:48, 03.10.2011  20:50:57,  
 |  
micronbaby p-stop stack
 
HV = -100V
 
beam on |  
   Tue Oct  4 10:44:48 2011, Christian Irmler, Micron, Internal Calibration, cal003, 83800, 04.10.2011  10:33:50, 04.10.2011  10:48:51,  
 |  
micronbaby p-spray/irrad
 
HV = -100V
 
beam on, baseline of irrad APV reduced |  
   Tue Oct  4 10:44:09 2011, Christian Irmler, Micron, Internal Calibration, cal002, 83800, 04.10.2011  10:04:49, 04.10.2011  10:19:41,  
 |  
micronbaby p-spray/irrad
 
HV = -100V
 
beam on, |  
   Tue Oct  4 00:11:31 2011, Manfred Valentan, Micron, Micron-Baby-Stack p-stop, zones w & h-w, run002, 760000, 04.10.2011  00:11:06, 04.10.2011  09:01:06, Good 
 |  
hit modules in bottom left corner -> Zones wide and half-wide for all modules
 
Position of HEPHY x-z-table:
 
x = 336 |  
   Mon Oct  3 21:08:27 2011, Manfred Valentan, Micron, Micron-Baby-Stack p-stop, configuration, , , , ,     
 |  
| Photo of hand-drawn stack configuration, config files |  
   Mon Oct  3 21:01:00 2011, Manfred Valentan, Micron, Micron-Baby-Stack p-stop, zones n & h-n, run001, 200k, 03.10.2011  20:54:22, 03.10.2011  23:25:47, Good 
 |  
hit modules in top right corner -> Zones narrow and half-narrow for all modules
 
Position of HEPHY x-z-table:
 
x = 324 |  
   Mon Oct  3 20:30:14 2011, Thomas Bergauer, common, XY Tisch, , , , ,    
 |  
Grosser (DESY) Tisch:  x = -342.0    y = 343.0  (Einheiten unbekannt, möglicherweise mm)
 
Raten-Scan siehe gescannter Zettel im Attachment.
 
  |  
   Mon Sep 19 17:47:50 2011, Manfred Valentan, Micron, Module COMM-IRRAD, , , , ,  
 |  
Sensor: B2Micron_2826_07_Baby2 (reused from last year, was DUT3, module is irradiated to 700 kGy)
 
p-stop: Common, with intermediate strips, irradiated
 
Hybrid p-side: H41 |  
   Mon Sep 19 17:47:11 2011, Manfred Valentan, Micron, Module COMB-IRRAD, , , , ,  
 |  
Sensor: B2Micron_2826_19_Baby4 (reused from last year, was DUT4, module is irradiated to 700 kGy)
 
p-stop: Combined, with intermediate strips, irradiated
 
Hybrid p-side: H48 |  
   Mon Sep 19 17:46:07 2011, Manfred Valentan, Micron, Module ATOLL-1, , , , ,  
 |  
Sensor: B2Micron_2826_07_Baby3 (reused from last year, but was not used in beam test SPS2010) 
 
p-stop: Atoll, with intermediate strips
 
Hybrid p-side: H40 |  
   Mon Sep 19 17:44:39 2011, Manfred Valentan, Micron, Module COMB-1, , , , ,  
 |  
Sensor: B2Micron_2826_01_Baby4 (reused from last year, was TRK6)
 
p-stop: Combined, with intermediate strips
 
Hybrid p-side: H45 |  
   Mon Sep 19 17:44:00 2011, Manfred Valentan, Micron, Module COMM-1, , , , ,  
 |  
Sensor: B2Micron_2826_19_Baby2 (reused from last year, was TRK7)
 
p-stop: Common, with intermediate strips
 
Hybrid p-side: H46 |  
   Mon Sep 19 17:42:39 2011, Manfred Valentan, Micron, Module SPRAY-I-1, , , , ,  
 |  
Sensor: B2Micron_2825_15_Baby2
 
p-stop: p-spray WITH intermediate strips
 
Hybrid p-side: MB1 |  
   Mon Sep 19 17:42:01 2011, Manfred Valentan, Micron, Module SPRAY-1, , , , ,  
 |  
Sensor: B2Micron_2825_05_Baby3
 
p-stop: p-spray WITHOUT intermediate strips
 
Hybrid p-side: H32 (reused from last year) |  
   Mon Sep 19 17:41:27 2011, Manfred Valentan, Micron, Module SPRAY-I-2, , , , ,  
 |  
Sensor: B2Micron_2825_15_Baby3
 
p-stop: p-spray WITH intermediate strips
 
Hybrid p-side: H43 (reused from last year) |  
   Mon Sep 19 17:40:47 2011, Manfred Valentan, Micron, Module SPRAY-2, , , , ,  
 |  
Sensor: B2Micron_2825_05_Baby4
 
p-stop: p-spray WITHOUT intermediate strips
 
Hybrid p-side: H44 (reused from last year) |  
   Mon Sep 19 17:39:55 2011, Manfred Valentan, Micron, Module COMB-2, , , , ,  
 |  
Sensor: B2Micron_2826_17_Baby4
 
p-stop: Combined with intermediate strips
 
Hybrid p-side: H42 (reused from last year) |  
   Mon Sep 19 17:39:09 2011, Manfred Valentan, Micron, Module COMM-2, , , , ,  
 |  
Sensor: B2Micron_2826_17_Baby2
 
p-stop: Common, with intermediate strips
 
Hybrid p-side: H34 (reused from last year) |  
   Mon Sep 19 17:38:34 2011, Manfred Valentan, Micron, Module ATOLL-2, , , , ,  
 |  
Sensor: B2Micron_2826_17_Baby3
 
p-stop: Atoll, with intermediate strips
 
Hybrid p-side: H35 (reused from last year) |  
   Fri Sep 16 11:01:15 2011, Manfred Valentan, Micron, Micron Baby Modules, , , , ,  
 |  
Irradiated modules from last year:
 
COMB-IRRAD: B2Micron_2826_19_Baby4: combined p-stop, intermediate strips (was DUT4)
 
COMM-IRRAD: B2Micron_2826_07_Baby2: common p-stop, intermediate strips (was DUT3) |  
 
 |