Mon Oct 3 20:30:14 2011, Thomas Bergauer, common, XY Tisch, , , , ,
|
Grosser (DESY) Tisch: x = -342.0 y = 343.0 (Einheiten unbekannt, möglicherweise mm)
Raten-Scan siehe gescannter Zettel im Attachment.
|
Wed Oct 5 19:33:40 2011, Markus Friedl, common, Trigger condition, , , 4.10.2011 15:00, ,
|
Changed trigger such that off-spill scintillator triggers are vetoed.
Inserted Flip-Flop which is set by begin of spill (WWE) and reset by end of spill signal (EE). Out-bar is put in coincidence with the scintillator
trigger. |
Fri Oct 7 18:28:53 2011, Christian Irmler, common, run schedule, , , , , Unknown
|
|
Mon Oct 10 12:16:06 2011, Marko Dragicevic, common, Beam Profile and Magnet BeamRef Settings , , , , , Unknown
|
Beam Profile from H6A, 10.10.2011 11:40
BeamRef settings for all magnets, File H6B.702 |
Thu Oct 13 13:08:38 2011, Thomas Bergauer, common, end of success, , , , , Unknown
|
|
Thu Oct 20 11:49:14 2011, Markus Friedl, common, Scintillator dimensions, , , , , Good
|
|
Fri Sep 16 11:01:15 2011, Manfred Valentan, Micron, Micron Baby Modules, , , , ,
|
Irradiated modules from last year:
COMB-IRRAD: B2Micron_2826_19_Baby4: combined p-stop, intermediate strips (was DUT4)
COMM-IRRAD: B2Micron_2826_07_Baby2: common p-stop, intermediate strips (was DUT3) |
Mon Sep 19 17:38:34 2011, Manfred Valentan, Micron, Module ATOLL-2, , , , ,
|
Sensor: B2Micron_2826_17_Baby3
p-stop: Atoll, with intermediate strips
Hybrid p-side: H35 (reused from last year) |
Mon Sep 19 17:39:09 2011, Manfred Valentan, Micron, Module COMM-2, , , , ,
|
Sensor: B2Micron_2826_17_Baby2
p-stop: Common, with intermediate strips
Hybrid p-side: H34 (reused from last year) |
Mon Sep 19 17:39:55 2011, Manfred Valentan, Micron, Module COMB-2, , , , ,
|
Sensor: B2Micron_2826_17_Baby4
p-stop: Combined with intermediate strips
Hybrid p-side: H42 (reused from last year) |
Mon Sep 19 17:40:47 2011, Manfred Valentan, Micron, Module SPRAY-2, , , , ,
|
Sensor: B2Micron_2825_05_Baby4
p-stop: p-spray WITHOUT intermediate strips
Hybrid p-side: H44 (reused from last year) |
Mon Sep 19 17:41:27 2011, Manfred Valentan, Micron, Module SPRAY-I-2, , , , ,
|
Sensor: B2Micron_2825_15_Baby3
p-stop: p-spray WITH intermediate strips
Hybrid p-side: H43 (reused from last year) |
Mon Sep 19 17:42:01 2011, Manfred Valentan, Micron, Module SPRAY-1, , , , ,
|
Sensor: B2Micron_2825_05_Baby3
p-stop: p-spray WITHOUT intermediate strips
Hybrid p-side: H32 (reused from last year) |
Mon Sep 19 17:42:39 2011, Manfred Valentan, Micron, Module SPRAY-I-1, , , , ,
|
Sensor: B2Micron_2825_15_Baby2
p-stop: p-spray WITH intermediate strips
Hybrid p-side: MB1 |
Mon Sep 19 17:44:00 2011, Manfred Valentan, Micron, Module COMM-1, , , , ,
|
Sensor: B2Micron_2826_19_Baby2 (reused from last year, was TRK7)
p-stop: Common, with intermediate strips
Hybrid p-side: H46 |
Mon Sep 19 17:44:39 2011, Manfred Valentan, Micron, Module COMB-1, , , , ,
|
Sensor: B2Micron_2826_01_Baby4 (reused from last year, was TRK6)
p-stop: Combined, with intermediate strips
Hybrid p-side: H45 |
Mon Sep 19 17:46:07 2011, Manfred Valentan, Micron, Module ATOLL-1, , , , ,
|
Sensor: B2Micron_2826_07_Baby3 (reused from last year, but was not used in beam test SPS2010)
p-stop: Atoll, with intermediate strips
Hybrid p-side: H40 |
Mon Sep 19 17:47:11 2011, Manfred Valentan, Micron, Module COMB-IRRAD, , , , ,
|
Sensor: B2Micron_2826_19_Baby4 (reused from last year, was DUT4, module is irradiated to 700 kGy)
p-stop: Combined, with intermediate strips, irradiated
Hybrid p-side: H48 |
Mon Sep 19 17:47:50 2011, Manfred Valentan, Micron, Module COMM-IRRAD, , , , ,
|
Sensor: B2Micron_2826_07_Baby2 (reused from last year, was DUT3, module is irradiated to 700 kGy)
p-stop: Common, with intermediate strips, irradiated
Hybrid p-side: H41 |
Mon Oct 3 21:01:00 2011, Manfred Valentan, Micron, Micron-Baby-Stack p-stop, zones n & h-n, run001, 200k, 03.10.2011 20:54:22, 03.10.2011 23:25:47, Good
|
hit modules in top right corner -> Zones narrow and half-narrow for all modules
Position of HEPHY x-z-table:
x = 324 |
Mon Oct 3 21:08:27 2011, Manfred Valentan, Micron, Micron-Baby-Stack p-stop, configuration, , , , ,
|
Photo of hand-drawn stack configuration, config files |
Tue Oct 4 00:11:31 2011, Manfred Valentan, Micron, Micron-Baby-Stack p-stop, zones w & h-w, run002, 760000, 04.10.2011 00:11:06, 04.10.2011 09:01:06, Good
|
hit modules in bottom left corner -> Zones wide and half-wide for all modules
Position of HEPHY x-z-table:
x = 336 |
Tue Oct 4 10:44:09 2011, Christian Irmler, Micron, Internal Calibration, cal002, 83800, 04.10.2011 10:04:49, 04.10.2011 10:19:41,
|
micronbaby p-spray/irrad
HV = -100V
beam on, |
Tue Oct 4 10:44:48 2011, Christian Irmler, Micron, Internal Calibration, cal003, 83800, 04.10.2011 10:33:50, 04.10.2011 10:48:51,
|
micronbaby p-spray/irrad
HV = -100V
beam on, baseline of irrad APV reduced |
Tue Oct 4 10:47:59 2011, Manfred Valentan, Micron, Internal Calibration, cal001, 83800, 03.10.2011 20:34:48, 03.10.2011 20:50:57,
|
micronbaby p-stop stack
HV = -100V
beam on |
Tue Oct 4 15:16:06 2011, Manfred Valentan, Micron, Micron-Baby-Stack p-spray, run bottom left, run003, 200k, 04.10.2011 11:29:19, 04.10.2011 13:57:54, Good
|
hit modules in bottom left corner -> Zones wide and half-wide for COMB_IRRAD, Zones narrow and half-narrow for BOMM_IRRAD
Position of HEPHY x-z-table:
x = 336 |
Tue Oct 4 15:16:45 2011, Manfred Valentan, Micron, Micron-Baby-Stack p-spray, run bottom right NOT USABLE, run004, 200k, 4.10.2011 15:28:48, 04.10.2011 19:36:50, Crap
|
HAS TO BE REPEATED!!! Before this run there were changes in the trigger line (vetoing the trigger when no spill), and thus the timing is incorrect.
hit modules in bottom right corner -> Zones narrow and half-narrow for COMB_IRRAD, Zones wide and half-wide for COMM_IRRAD
Position of HEPHY x-z-table: |
Mon Oct 10 21:54:24 2011, Marko Dragicevic, Micron, Micron-Baby-Stack p-spray, run bottom right, run027, 700k, 10.10.2011 22:40:31, 11.10.2011 09:49:11, Unknown
|
hit modules in bottom left corner -> Zones narrow and half-narrow for COMB_IRRAD, Zones wide and half-wide for COMM_IRRAD
timing corrected w.r.t. run004
Position of HEPHY x-z-table: |
Mon Oct 10 21:55:30 2011, Marko Dragicevic, Micron, Internal Calibration, cal013, 83800, 10.10.2011 21:52:32, , Unknown
|
micronbaby p-spray/irrad
HV = -100V
beam on, baseline of irrad APV reduced |
Sat Oct 8 14:33:25 2011, Thomas Bergauer, HPK, baby_std, run016, 250k, 08.10.2011 14:31:40, , Crap
|
falsches config file (single statt multi6)
no cooling |
Sat Oct 8 16:35:04 2011, Thomas Bergauer, HPK, baby_std, run017, , 08.10.2011 16:26:10, , Crap
|
wrong timing
no cooling |
Sat Oct 8 16:45:14 2011, Thomas Bergauer, HPK, baby_std, run018, 150000, 08.10.2011 16:44:13, 08.10.2011 19:33:33, Good
|
no cooling
beam on; xy table position x=322 y=80
HV=200V Istart_PY=8.2uA; Istart_N=0.45uA |
Sat Oct 8 20:33:58 2011, Karl-Heinz Hoffmann, HPK, baby_std, run019, 150000, 08.10.2011 20:22:45, 08.10.2011 23:19:23, Good
|
no cooling
beam on; xy table position x=333 y=80
HV=200V Istart_PY=8.2uA; Istart_N=0.45uA |
Sat Oct 8 23:27:44 2011, Karl-Heinz Hoffmann, HPK, baby_std, run020, 382000, 08.10.2011 23:24:16, 09.10.2011 09:24:20, Good
|
no cooling
beam on; xy table position x=327,5 y=65
HV=200V Istart_PY=8.2uA; Istart_N=0.45uA |
Sun Oct 9 10:05:34 2011, Markus Friedl, HPK, baby_std, cal010, 83800, 08.10.2011 13:36:25, 08.10.2011 13:54:07, Good
|
HV=+-40V,
no cooling
beam off; xy table position x= y= |
Sun Oct 9 10:13:11 2011, Karl-Heinz Hoffmann, HPK, baby_add, cal011, 83800, 09.10.2011 10:05:01, , Good
|
no cooling
beam on; xy table position x= y=
HV=200V Istart_P=1.5uA; Istart_N=0.22uA |
Sun Oct 9 11:00:33 2011, Karl-Heinz Hoffmann, HPK, baby_add, run021, 150000, 09.10.2011 10:56:47, 09.10.2011 12:47:23, Good
|
no cooling
beam on; xy table position x=330 y=74
HV=200V Istart_PY=1,9uA; Istart_N=0.27uA |
Sun Oct 9 11:28:30 2011, Manfred Valentan, HPK, HPK BSTD stack configuration, , , , , Unknown
|
Module order:
BSTD1-N
BSTD2-N |
Sun Oct 9 11:31:43 2011, Manfred Valentan, HPK, HPK BADD stack configuration, , , , , Unknown
|
Module order:
BADD1-N
BADD2-N |
Sun Oct 9 13:12:32 2011, Karl-Heinz Hoffmann, HPK, baby_add, run022, 670k, 09.10.2011 13:09:32, 10.10.2011 00:48:16, Good
|
no cooling
beam on; xy table position x=330 y=64
HV=200V Istart_PY=1,9uA; Istart_N=0.27uA |
Mon Oct 10 00:50:23 2011, Christian Irmler, HPK, baby_add, run023, 680k, 10.10.2011 00:51:26, 10.10.2011 09:15:35, Good
|
no cooling
beam on; xy table position x=330 y=74
HV=200V Istart_PY=1,9uA; Istart_N=0.27uA |
Mon Oct 10 10:37:52 2011, Christian Irmler, CNM, CNM stack, cal012, 83800, 10.10.2011 11:29:55, 10.10.2011 11:40:55, Unknown
|
no cooling
beam on; xy table position x=330 y=64
HV_CNM=20V, HV_BSTD1=200V |
Mon Oct 10 12:15:52 2011, Manfred Valentan, CNM, CNM stack, run024, 110000, 10.10.2011 12:03:58, 10.10.2011 14:05:56, Good
|
no cooling
beam on; xy table position x=320.5 y=79.5
HV_CNM=20V, HV_BSTD1-N=200V |
Mon Oct 10 12:32:42 2011, Manfred Valentan, CNM, CNM stack configuration, , , , , Unknown
|
Module order:
CNM-V1 (draws a lot of current, gives only low signal)
BSTD1-N (for height information) |
Mon Oct 10 14:11:53 2011, Christian Irmler, CNM, CNM stack, run025, 110000, 10.10.2011 14:09:00, 10.10.2011 16:11:57, Good
|
no cooling
beam on; xy table position x=335.5 y=79.5
HV_CNM=20V, HV_BSTD1-N=200V |
Mon Oct 10 16:26:20 2011, Marko Dragicevic, CNM, CNM stack, run026, 300000, 10.10.2011 16:23:46, 10.10.2011 20:30:00, Good
|
no cooling
beam on; xy table position x=328 y=69.5
HV_CNM=20V, HV_BSTD1-N=200V |
Tue Oct 4 21:40:52 2011, Christian Irmler, BELLE, Origami stack, cal004, 83800, 04.10.2011 21:18:09, 04.10.2011 21:50:23, Good
|
Origami6
HV=+-40V, no cooling
beam on |
Tue Oct 4 22:11:12 2011, Christian Irmler, BELLE, Origami stack, run005, 330000, 04.10.2011 22:09:37, 05.10.2011 09:11:54, Crap
|
Origami6
HV=+-40V, no cooling
beam on |
Wed Oct 5 12:09:00 2011, Christian Irmler, BELLE, Origami stack cooled wrong I2C settings, cal005, 83800, 05.10.2011 12:04:50, 05.10.2011 12:37:11, Crap
|
This calibration file can not be used, due to wrong I2C settings!
Origami6
HV=+-40V |
Wed Oct 5 13:00:41 2011, Christian Irmler, BELLE, Origami stack cooled , run006, 24692, 05.10.2011 12:55:53, 05.10.2011 14:05:49, Crap
|
Run stopped after 24692 events, because all n-side APV failed due to a shortcut of a capacitor (C223) on n-side rebo
Origami6
HV=+-40V |
Wed Oct 5 16:43:00 2011, Christian Irmler, BELLE, Origami stack cooled, cal006, 83800, 05.10.2011 16:40:18, 05.10.2011 17:12:27, Good
|
Origami6
HV=+-40V
beam on |
Wed Oct 5 17:54:09 2011, Christian Irmler, BELLE, Origami stack cooled, cal007, 83800, 05.10.2011 17:51:57 , , Good
|
I2C setting modified to improve the shape of the p-side signal --> shaping time reduced, pulse height still low
Origami6
HV=+-40V |
Wed Oct 5 19:57:15 2011, Christian Irmler, BELLE, Origami stack cooled , run007, 17845, 05.10.2011 18:27:51, 05.10.2011 19:31:43, Crap
|
Run stopped after 17845 events, because of bad trigger timing
Origami6 |
Wed Oct 5 20:28:00 2011, Markus Friedl, BELLE, Origami stack cooled, run008, 10582, 05.10.2011 20:25:10, 05.10.2011 20:45:10, Good
|
HV=+-40V,
CO2 cooling: P_TT_4: 18.2 bar, mf=0.9 g/s
beam on |
Wed Oct 5 20:49:11 2011, Markus Friedl, BELLE, Origami stack cooled, run009, 330k, 05.10.2011 20:46:30, 06.10.2011 09:12:24 , Good
|
HV=+-40V,
CO2 cooling: P_TT_4: 18.2 bar, mf=0.9 g/s
beam on; xy table position x=306 y=76.5 |
Thu Oct 6 09:22:34 2011, Christian Irmler, BELLE, Origami stack cooled, run010, 330k, 05.10.2011 20:46:30, 06.10.2011 09:12:24 , Good
|
HV=+-40V,
CO2 cooling: P_TT_4: 18.2 bar, mf=0.9 g/s
beam on; xy table position x=306 y=76.5 |
Thu Oct 6 15:57:51 2011, Christian Irmler, BELLE, Origami stack cooled, cal008, 83800, 06.10.2011 15:53:20, 06.10.2011 16:25:29 , Good
|
HV=+-40V,
CO2 cooling: P_TT_4: 18.2 bar, mf=1 g/s
beam on; xy table position x=306 y=76.5 |
Thu Oct 6 17:36:47 2011, Christian Irmler, BELLE, Origami stack cooled, run011, 180000, 06.10.2011 17:06:38, 07.10.2011 00:04:06, Good
|
HV=+-40V,
CO2 cooling: P_TT_4: 18.2 bar, mf=1 g/s
beam on; xy table position x=260.8 y=60.25 |
Fri Oct 7 00:20:15 2011, Christian Irmler, BELLE, Origami stack cooled, run012, 250k, 07.10.2011 00:15:54 , 07.10.2011 09:13:55, Good
|
HV=+-40V,
CO2 cooling: P_TT_4: 18.2 bar, mf=1 g/s
beam on; xy table position x=352 y=89 |
Fri Oct 7 10:13:12 2011, Christian Irmler, BELLE, Origami stack cooled, run013, 185k, 07.10.2011 10:02:20, 07.10.2011 17:17:32, Good
|
HV=+-40V,
CO2 cooling: P_TT_4: 18.2 bar, mf=1 g/s
beam on; xy table position x=321 y=99 |
Fri Oct 7 18:40:07 2011, Christian Irmler, BELLE, Origami stack cooled, cal009, 83800, 07.10.2011 18:35:04 , 07.10.2011 19:31:51, Good
|
Origami6
HV=+-40V,
CO2 cooling: P_TT_4: 14.9 bar, mf=0.9 g/s |
Fri Oct 7 19:35:14 2011, Christian Irmler, BELLE, Origami stack cooled, run014, 90k, 07.10.2011 19:49:26, 07.10.2011 23:26:52, Good
|
Origami6
HV=+-40V,
CO2 cooling: P_TT_4: 14.9 bar, mf=0.9 g/s |
Sat Oct 8 00:14:37 2011, Christian Irmler, BELLE, Origami stack, run015, 180111, 08.10.2011 00:06:41, 08.10.2011 08:24:38, Good
|
Origami6
HV=+-40V,
no cooling |
Sat Oct 8 09:30:44 2011, Christian Irmler, BELLE, Cooling plant tests, , , 08.10.2011 09:30, , Unknown
|
Software run with 6 samples to ensure that APV chips dissipate full power.
DAQ data not saved, bias current monitored
new longterm files: |
Mon Feb 20 17:17:27 2012, Christian Irmler, BELLE, Origami Module #4, run100, 50k, 20.02.2012 17:07:21, 20.02.2012 17:17:22, Good
|
Sr90, large scintillator, HVret @ Origami open
Origami Mod. #4
HV=+-40V, Ibias=2,03µA |
Mon Feb 20 17:20:20 2012, Christian Irmler, BELLE, Origami Module #4, cal100, 50k, 20.02.2012 17:19:03, 20.02.2012 17:29:58, Good
|
Sr90, large scintillator, HVret @ Origami open
Origami Mod. #4
HV=+-40V, Ibias=2,03µA |
Mon Feb 20 17:27:02 2012, Christian Irmler, BELLE, Origami Module #4, run101, 24497, 20.02.2012 17:33:33, 20.02.2012 17:38:21, Good
|
Sr90, large scintillator, HVret @ Origami open
Origami Mod. #4
HV=+-40V, Ibias=2,03µA |
Wed Feb 22 12:15:11 2012, Christian Irmler, BELLE, Origami Module #4, run102, 170k, 22.02.2012 12:31:08, 22.02.2012 13:03:27 , Good
|
same as run101
Sr90, large scintillator, HVret @ Origami open
Origami Mod. #4 |
Wed Feb 22 13:17:34 2012, Christian Irmler, BELLE, Origami Module #4, cal102, 83800, 22.02.2012 13:11:30, 22.02.2012 13:25:18, Good
|
Sr90, large scintillator, HVret @ Origami open
Origami Mod. #4
HV=+-40V, Ibias=1,8µA |
Wed Feb 22 13:37:11 2012, Christian Irmler, BELLE, Origami Module #4, run103, 100k, 22.02.2012 13:35:08, 22.02.2012 13:54:08 , Crap
|
Sr90, large scintillator,
HVret @ Origami closed
HVret @ SMU connected |
Wed Feb 22 16:21:23 2012, Christian Irmler, BELLE, Origami Module #4, run104, 100k, 22.02.2012 16:22:34, 22.02.2012 16:41:26, Good
|
Sr90, large scintillator,
Origami Mod. #4
HV=+-40V, Ibias=1,6µA |
Wed Feb 22 16:49:29 2012, Christian Irmler, BELLE, Origami Module #4, cal104, 83800, 22.02.2012 16:51:13, 22.02.2012 17:02:11, Good
|
Sr90, large scintillator,
Origami Mod. #4
HV=+-40V, Ibias=1,6µA |
Wed Feb 22 17:25:34 2012, Christian Irmler, BELLE, Origami Module #4, cal105, 83800, 22.02.2012 17:23:13 , 22.02.2012 17:34:27, Good
|
Sr90, large scintillator,
Origami Mod. #4
HV=+-40V, Ibias=1,6µA |
Wed Feb 22 17:38:29 2012, Christian Irmler, BELLE, Origami Module #4, run105, 100k, 22.02.2012 17:39:10 , 22.02.2012 17:58:01, Good
|
Sr90, large scintillator,
Origami Mod. #4
HV=+-40V, Ibias=1,6µA |
Wed Feb 22 18:10:29 2012, Christian Irmler, BELLE, Origami Module #4, run106, 50k, 22.02.2012 17:39:10 , 22.02.2012 18:23:47, Good
|
Sr90, large scintillator,
Origami Mod. #4
HV=+-40V, Ibias=1,6µA |
Wed Feb 22 18:32:24 2012, Christian Irmler, BELLE, Origami Module #4, run107, 50k, 22.02.2012 18:30:33, 22.02.2012 18:40:11, Good
|
Sr90, large scintillator,
Origami Mod. #4
HV=+-40V, Ibias=1,6µA |
Mon Mar 5 17:34:43 2012, Christian Irmler, BELLE, Origami Module #4, run108, 100k, , 05.03.2012 16:24:12, Unknown
|
Sr90, large scintillator,
Origami Mod. #4
HV=+-40V, Ibias=1,9µA |
Mon Mar 5 17:35:31 2012, Christian Irmler, BELLE, Origami Module #4, cal108, 83800, 05.03.2012 16:47:51, 05.03.2012 17:05:16, Unknown
|
Sr90, large scintillator,
Origami Mod. #4
HV=+-40V, Ibias=1,9µA |
Mon Mar 5 17:36:46 2012, Christian Irmler, BELLE, Origami Module #4, run109, 100k, 05.03.2012 17:36:19 , 05.03.2012 17:55:24 , Unknown
|
Sr90, large scintillator,
Origami Mod. #4
HV=+-40V, Ibias=1,9µA |
Mon Mar 5 18:08:02 2012, Christian Irmler, BELLE, Origami Module #4, cal109, 83800, 05.03.2012 18:07:40, 05.03.2012 18:18:32, Unknown
|
Sr90, large scintillator,
Origami Mod. #4
HV=+-40V, Ibias=1,9µA |
Mon Mar 5 18:41:23 2012, Christian Irmler, BELLE, Origami Module #4, run110, 100k, 05.03.2012 18:45:21, 05.03.2012 19:04:30, Unknown
|
Sr90, large scintillator,
Origami Mod. #4
HV=+-40V, Ibias=1,9µA |
Mon Mar 5 19:06:41 2012, Christian Irmler, BELLE, Origami Module #4, cal110, 83800, 05.03.2012 19:05:52, 05.03.2012 19:17:01, Unknown
|
Sr90, large scintillator,
Origami Mod. #4
HV=+-40V, Ibias=1,9µA |
Mon Mar 5 19:27:56 2012, Christian Irmler, BELLE, Origami Module #4, run111, 50k, 05.03.2012 19:26:28, , Unknown
|
Sr90, large scintillator,
Origami Mod. #4
HV=+-40V, Ibias=1,30µA |
Wed Mar 7 15:12:42 2012, Christian Irmler, BELLE, Origami Module #4, run112, 100k, 07.03.2012 15:13:18, 07.03.2012 14:31:07, Unknown
|
Sr90, small (new) scintillator, new trigger unit
Origami Mod. #4
HV=+-40V, Ibias=1,6µA |
Wed Mar 7 15:44:25 2012, Christian Irmler, BELLE, Origami Module #4, cal112, 83800, 07.03.2012 15:42:53, , Unknown
|
Sr90, small (new) scintillator, new trigger unit
Origami Mod. #4
HV=+-40V, Ibias=1,6µA |
Wed Mar 7 16:03:30 2012, Christian Irmler, BELLE, Origami Module #4, run113, 100k, 07.03.2012 16:07:34, 07.03.2012 16:30:48 , Unknown
|
Sr90, small (new) scintillator, new trigger unit
Origami Mod. #4
HV=+-40V, Ibias=1,6µA |
Wed Mar 7 16:58:36 2012, Christian Irmler, BELLE, Origami Module #4, cal113, 100k, 07.03.2012 16:40:04 , 07.03.2012 16:57:08, Unknown
|
Sr90, small (new) scintillator, new trigger unit
Origami Mod. #4
HV=+-40V, Ibias=1,6µA |
|