Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS September/October 2010, all entries  Not logged in ELOG logo
ID Date Authordown Project Subject Run Number Events StartTime EndTime
  13   Mon Sep 27 15:39:33 2010 Thomas BergauercommonPI-XY Table    

M-521.dd: (links/rechts)

downstream rechts => pos. limit [0]

downstream links => neg. limit [207]

----------------------

M-511.dd: (oben/unten)

oben [102]

unten [0]

----------------------

M-060.dg: (rotation)

parallel beam [7,5]

 

-------------------------------------------

Remote Control:

lokal ssh tunnel starten:
ssh -g -C -L5959:zenpixelw:5900 eudet@eudetmac001.cern.ch

danach mit "Chicken of the VNC" (von lokalem Mac) VNC auf localhost (port 5959). 

  14   Mon Sep 27 15:41:28 2010 Thomas BergauercommonSzintillatoren    

1: breit  (1)

2: schmal (2)

3: breit  (4)

4: schmal  (8)

 

AND aus beiden breiten: 5

AND aus beiden schmalen: 10

 

  15   Mon Sep 27 15:42:09 2010 Thomas BergauercommonTLU: wir stecken auf DUT 3    

TLUControl.exe ist auf zenpixell3 unter /home/eudet/eudaq/bin

TLUControl.exe -d 14 -a 12
-dXX Mask for DUT:
1   abgeschnittenes Dummykabel
2   EUDRB hinten
4   EUDRB vorne
8   DUT3(wir)
-t100 internal trigger
-aXX Mask for Szintis:
1   4 mm (front)
2   4 mm (front)
4   9 mm (back)
8   9 mm (back)
  16   Mon Sep 27 18:54:47 2010 Thomas BergauerBELLEXY Position    

center position: 55/40/277,5

  24   Tue Sep 28 16:50:31 2010 Thomas Bergauercommonserial connection chiller    

 Der chiller braucht ein gekreuztes serielles Kabel!!

  35   Wed Sep 29 16:28:17 2010 Thomas BergauercommonEUDET telescope pedestal run20089122850 (events built)29.09.2010 16:2729.09.2010 17:33

 EUDAQ config eudet2-test-6boards-in-2crates

rate: ~745.5 Hz

 

  36   Wed Sep 29 17:38:15 2010 Thomas BergauercommonEUDET telescope pedestal run2009711812529.09.2010 17:3729.09.2010 18:09

new pedestal run of EUDET telescope with new JTAG settings of plane 3 (sensor 11) [according to Ingrid]:


VRef2    98
VRef1A  87
VRef1B  143
VRef1C  108
VRef1D   153

 

  38   Wed Sep 29 18:53:05 2010 Thomas BergauerMicron BabyXY Positions    

center position: 113/47/7.5

top left (direction jura): 121/53.5/7.5

bottom right (direction saleve): 105/40.5/7.5

  43   Thu Sep 30 14:45:16 2010 Thomas BergauerMicron Babyrunrun01522.5k30.09.2010 13:18:1130.09.2010 14:38:01

micron baby stack angle scan 15 grad mit 3 modulen

HV=100V, I=3.8uA

Beam on

 

telescope position: 129/76/187.5

telescope run 20109

  48   Thu Sep 30 23:09:29 2010 Thomas BergauerMicron Babyrunrun01916200030.09.2010 23:08:0301.10.2010 9:33:38

micron baby: 4 DUTs
HV=100V I=12uA I_stop=15.4uA
Beam on
45° rotation

 

telescope run  20115 (after JTAG programming of telescope chips due to config errors)


  53   Fri Oct 1 23:50:28 2010 Thomas BergauerCNMrunrun023227501.10.2010 23:49:2901.10.2010 23:53:12

CMN-SILC stack
HV_SILC (Katze)=75V, 0.25uA (6 SiLC)
HV_CNM (Keithley)=30V, CNM_1=84nA, CNM_2=4.3uA

too much optimized alignment (XY-table to 133/74/187.5)   ;-)

telescope run 20119

  54   Fri Oct 1 23:55:12 2010 Thomas BergauerCNMrunrun024320k01.10.2010 23:53:1202.10.2010 09:47:37

CMN-SILC stack
HV_SILC (Katze)=75V, 0.25uA (6 SiLC)
HV_CNM (Keithley)=30V, CNM_1=84nA, CNM_2=4.3uA

optimized alignment (XY-table to 133/76/187.5)

telescope run 20120

  55   Sat Oct 2 09:57:20 2010 Thomas BergauerCNMrunrun025150k02.10.2010 09:54:2802.10.2010 14:21:20

 CMN-SILC stack

HV_SILC (Katze)=75V, 0.25uA (6 SiLC)
HV_CNM (Keithley)=30V, CNM_1=84nA, CNM_2=4.3uA

new position along the CNM strips (XY-table to 143/76/187.5)

telescope run 20122

 

  59   Sat Oct 2 17:27:14 2010 Thomas BergauerITEcalcal0078380002.10.2010 17:11:18  

ITE: 2 DUTs
2 x SILC + 2 x ITE
HV=100V

Beam on 

one short only per sensor

  91   Wed Oct 6 11:51:25 2010 Thomas BergauerMicron Babyrunrun049448906.10.2010 11:38:2106.10.2010 11:49:23
8 x Micron Baby (3 irradiated), no cooling
HV=100V I=141uA (start of run)

beam on 

not yet optimized XY-table positions (111/43.5/7.5)

  105   Sat Oct 9 12:25:36 2010 Thomas BergauerBELLErunrun05727647509.10.2010 12:22:2109.10.2010 15:08:46

 

Origami1 (n-side only) + Micron1 (non-irrad)

angle scan: 73 degree

HV=100V / 36 uA  (beginning), 35uA (end of run)

cooling: chiller set to 15C

 PROBLEM: wrong config file (single hit, not multi6)

telescope run 20200

Origami p-side does not receive triggers -> disabled

origami flex straight part needed to be folded due to severe rotation angle -> nanonics connector problem...

 

  107   Sat Oct 9 18:56:35 2010 Thomas Bergauercommonpath to telescope data    

eudetmac001.cern.ch

path is /Volumes/Data/eudet/Data/cern_2010_sept_silc_apvdaq (Vienna system)

and /Volumes/Data/eudet/Data/cern_2010_sept_silc_alibava (Santander system)

  109   Sun Oct 10 15:45:04 2010 Thomas Bergauercommonend of success  09.10.2010 19:44:23NaN

 ;-) 

genau das gleiche wollte ich auch gerade schreiben!

  120   Wed May 4 15:14:31 2011 Thomas BergauerPtinfo about module    

pt-Modul hat jeweils zwei OB1 Sensoren von STM (mit 122um Pitch)

im Abstand von 2mm uebereinander

  17   Tue Sep 28 01:13:57 2010 Markus FriedlBELLEcalcal0018380028.09.2010 01:11:20 

first intcal with complete Belle stack: 2 x Origami, 2 x Micron

HV=100V  I=49uA

beam is on

chiller is set to 15°C (module temperature is ~17°C)

both Origamis and both Microns are serially cooled

  18   Tue Sep 28 03:06:31 2010 Markus FriedlBELLErunrun00111951628.09.2010 03:06:0428.09.2010 12:18:33

first run with complete Belle stack: 2 x Origami, 2 x Micron

HV=100V  I=49uA

beam is on

chiller is set to 15°C (module temperature is ~17°C)

both Origamis and both Microns are serially cooled

 

position:centered in both axes  55 / 30 / 277.5

 

telescope: run20076 (in zero suppressed mode)

  19   Tue Sep 28 12:54:33 2010 Markus FriedlBELLErunrun002 28.09.2010 12:46:54 

same as run001 after shifting x by 48mm

103 / 30 / 277.5 ? unsure after crash of xy stage PC

  20   Tue Sep 28 13:04:02 2010 Markus FriedlBELLErunrun0032500028.09.2010 13:00:0528.09.2010 14:41:14

now for real (previous run was at wrong position)

all same as run001, except position now still centered on p-strips, but on high edge (last APVs) for n side

position: 103 / 30 / 277.5

corresponds to telescope run 20078

  22   Tue Sep 28 14:48:00 2010 Markus FriedlBELLErunrun004175528.09.2010 14:48:2828.09.2010 15:06:31

same as before, but now pos 1 is located on the other edge (-48mm from center)

telescope 7 / 30 / 277.5

telescope run 20079

  23   Tue Sep 28 15:09:16 2010 Markus FriedlBELLErunrun0054000028.09.2010 15:07:0828.09.2010 20:20:12

previous run stopped due to beam problem (shifted, broad, etc).

now recovered, restarting with same settings.

 

telescope run: 20080

  25   Tue Sep 28 22:07:16 2010 Markus FriedlBELLEcalcal002 DO NOT USE -> go to cal0038380028.09.2010 22:01:55 

Belle stack (Origami, Micron, Micron, Origami)

now cooling only for Origami, Micron are uncooled

chiller set point: -25°C, measured values on Origami: -10°C

HV=100V, Ibias=38µA, beam off

modified I2C settings for cold modules

temperature monitoring: Origami2 pipes in<->out swapped (to achieve shorter tubes)

 

PROBLEM: Origami n channels are swapped -> USE cal003 INSTEAD!!!

  26   Tue Sep 28 22:09:39 2010 Markus FriedlBELLETemperature sensors Belle stack    

PicoLogic TC-08 temperature sensor assignment Belle stack:

Sensor type: K

channel 1:  Origami_mod1_in
channel 2:  Origami_mod1_out
channel 3:  Origami_mod2_out    (swapped with 4)  - label not changed
channel 4:  Origami_mod2_in      (swapped with 3)  - label not changed
channel 5:  Micron_wedge_mod1_p
channel 6:  Micron_wedge_mod1_n
channel 7:  Micron_wedge_mod2_p
channel 8:  Micron_wedge_mod2_n
 

The cooling pipes of the two Origami modules are connected in series, respectively.

  27   Tue Sep 28 23:23:47 2010 Markus FriedlBELLErunrun006200328.09.2010 23:13:2228.09.2010 23:22:26

channels swapped -> stopped

  28   Tue Sep 28 23:24:35 2010 Markus FriedlBELLErunrun007146028.09.2010 23:23:2928.09.2010 23:27:54

Belle stack: Origami-Micron-Micron-Origami
HV=100V, Ibias=38A, beam on
cooling: Origami only, chiller: -25C, Module: -10C
modified I2C settings for cooled modules
centered again

 

telescope run 20082

 

sensor config bug (only relevant for sensor display) found -> stopped

  29   Tue Sep 28 23:29:50 2010 Markus FriedlBELLErunrun00814000028.09.2010 23:29:0129.09.2010 09:36:58

Belle stack: Origami-Micron-Micron-Origami
HV=100V, Ibias=38A, beam on
cooling: Origami only, chiller: -25C, Module: -10C
modified I2C settings for cooled modules
centered again

 

telescope run 20083

  30   Wed Sep 29 09:39:33 2010 Markus FriedlBELLEcalcal0038380029.09.2010 09:38:00 

same as cal002, but now with corrected readout order

  31   Wed Sep 29 10:30:59 2010 Markus FriedlBELLErunrun0093000029.09.2010 10:27:2729.09.2010 11:06:35

zero suppressed (HIT4) @ FADC

Belle stack: Origami-Micron-Micron-Origami - HIT4
HV=100V, Ibias=28A, beam on
cooling: Origami only, chiller: -25C, Module: -10C
modified I2C settings for cooled modules
centered in both axes

telescope run 20084

  32   Wed Sep 29 11:09:10 2010 Markus FriedlBELLErunrun0103000029.09.2010 11:08:0329.09.2010 11:50:07

zero suppressed (HIT5) @ FADC

Belle stack: Origami-Micron-Micron-Origami - HIT5
HV=100V, Ibias=28A, beam on
cooling: Origami only, chiller: -25C, Module: -10C
modified I2C settings for cooled modules
centered in both axes

telescope run 20085

  34   Wed Sep 29 14:03:55 2010 Markus FriedlBELLEcalcal0048380029.09.2010 14:02:2529.09.2010 14:45:05

Belle stack: Origami-Micron-Micron-Origami
HV=100V, Ibias=100µA, beam off
no cooling

Temp. at modules: 
Origami 1: 50°C
Micron 1: 46°C
Micron 2: 48°C
Origami 2: 48°C

standard I2C settings
centered

  37   Wed Sep 29 17:38:19 2010 Markus FriedlMicron Babycalcal0058380029.09.2010 17:36:38 

micron baby stack
HV=100V I=6.5uA
Beam off

  39   Wed Sep 29 19:01:28 2010 Markus FriedlMicron Babyrunrun012224829.09.2010 18:59:0929.09.2010 19:07:02

micron baby stack
HV=100V I=11.0uA
Beam on
telescope position: 121/55/7.5

 

telescope run 20105

  40   Wed Sep 29 19:08:56 2010 Markus FriedlMicron Babyrunrun0138985329.09.2010 19:09:5730.09.2010 00:52:39

micron baby stack
HV=100V I=11.0uA
Beam on
telescope position: 121/53.5/7.5   (shifted in height by -1.5mm wrt run012 for better DUT centering)

 

telescope run 20107

  41   Thu Sep 30 00:56:32 2010 Markus FriedlMicron Babyrunrun014100k30.09.2010 00:55:3030.09.2010 11:20:02

micron baby stack

 

HV=100V I=11.0uA

I_end = 16uA

 

Beam on

 

telescope position: 105/40.5/7.5 

telescope run 20108

  44   Thu Sep 30 15:06:28 2010 Markus FriedlMicron Babycalcal0068380030.09.2010 15:01:56 

micron baby: 4 DUTs - angle scan
HV=100V I=6.8uA
Beam off (turned on at ~8k events)
 

  45   Thu Sep 30 15:39:53 2010 Markus FriedlMicron Babyrunrun01631k30.09.2010 15:38:2630.09.2010 17:44:36

micron baby: 4 DUTs
HV=100V I=10.3uA (start of run);  I=16.2uA (end of run)
Beam on

 reference run @ 0°

telescope run 20110

  46   Thu Sep 30 18:12:53 2010 Markus FriedlMicron Babyrunrun0173500030.09.2010 18:11:5330.09.2010 20:22:43

micron baby: 4 DUTs
HV=100V I=13.5uA, I_stop=17uA
Beam on
15° rotation

telescope run 20111

  47   Thu Sep 30 20:47:01 2010 Markus FriedlMicron Babyrunrun0182693830.09.2010 20:45:4830.09.2010 22:25:25

micron baby: 4 DUTs
HV=100V I=13.7uA, I_stop=15.6uA
Beam on
30° rotation

 

telescope run  20112

  52   Fri Oct 1 23:18:34 2010 Markus FriedlCNMrunrun022813901.10.2010 23:17:02 01.10.2010 23:45:51

CMN-SILC stack
HV_SILC (Katze)=75V, 0.25uA (6 SiLC)
HV_CNM (Keithley)=30V, CNM_1=84nA, CNM_2=4.3uA

not optimized alignment 

telescope run 20118

  58   Sat Oct 2 17:24:12 2010 Markus FriedlITErunrun026583402.10.2010 17:23:46 02.10.2010 17:31:51

2 x SILC + 2 x ITE
HV=100V

 

trying to find beam
 

telescope run 20124

  60   Sat Oct 2 17:35:51 2010 Markus FriedlITErunrun027299902.10.2010 17:34:51 02.10.2010 17:38:39

2 x SILC + 2 x ITE
HV=100V
telescope position: 107

telescope run 20125

 

beam not found yet

  61   Sat Oct 2 18:36:57 2010 Markus FriedlITErunrun02816226302.10.2010 18:34:0603.10.2010 08:11:13

6 x SILC + 2 x ITE
HV=100V
telescope position: 119

 short break ~2.10.2010 20:00 (beam off for a couple of minutes for access by marcos)

telescope run 20126

  62   Sun Oct 3 08:14:39 2010 Markus FriedlITEcalcal0088380003.10.2010 08:13:06 

6 x SILC + 2 x ITE
HV=100V
telescope position: 119

no beam (technical problem)

  63   Sun Oct 3 08:19:13 2010 Markus FriedlITErunrun0297500003.10.2010 08:33:2803.10.2010 10:50:27

same as previous run

telescope run 20127

Configuration file for DAQ: cern10_ite_silc_single.cfg --> peak mode with 1 sample!

  92   Wed Oct 6 11:59:29 2010 Markus FriedlMicron Babyrunrun0509000006.10.2010 11:57:5506.10.2010 15:30:37

8 x Micron Baby (3 irradiated), no cooling
HV=100V I=141uA (start of run)
beam on
telescope position 118 / 41.1 / 7.5

 

no telescope run

  93   Wed Oct 6 16:33:55 2010 Markus FriedlMicron Babyrunrun0519000006.10.2010 16:32:0306.10.2010 20:59:58

8 x Micron Baby (3 irradiated), no cooling
HV=100V I=209uA (start of run, still rising); 203uA (end of run)
beam on, NIM trigger from TLU (no handshake)
telescope position 131 / 53.5 / 7.5
 

no telescope run - being tuned (some intervals during data taking are possible)

 

  96   Wed Oct 6 23:48:49 2010 Markus FriedlBELLErunrun05216578906.10.2010 23:47:1207.10.2010 08:43:42

Belle stack without Origami2
HV=80V I=217uA
telescope setting 103 / 30 / 277.5
telescope run 20184

temperature of chiller set to 15°C

beam stopped at 7.10. 08:00 sharp, no beam until 8.10 - 8:00 according to SPS Page 1. We keep DAQ and telescope running and cross our fingers for at least some spills of particles.

 

Irradiated micron module 2, n-side: excessive hit count on channels at the edges of the APV chips - no such thing on the p-side

  97   Fri Oct 8 17:26:36 2010 Markus FriedlBELLEcalcal0158380008.10.2010 17:22:44 

Belle stack without Origami2
HV=11V I=32uA

beam on

2 suspicious APVs on n side of Micron due to burnt strip

trying to identify problematic Micron n side channels with low bias voltage (APV22 baseline saturates at higher bias)

  99   Fri Oct 8 18:12:43 2010 Markus FriedlBELLErunrun0549000008.10.2010 18:08:4808.10.2010 21:49:36

Belle stack w/o Origami2 after irradiation

HV=80V I=224uA (beginning of run)

2 suspicious APVs on Micron n side

xy-table position 7 / 30 / 277.5 (shoots at the smaller edge of the trapezoidal sensor)

 

telescope run 20195

  100   Fri Oct 8 23:05:03 2010 Markus FriedlBELLEcalcal0168380008.10.2010 23:03:16 

Belle stack w/o Origami2 after irradiation
HV=80V / 258 µA
cooling: Origami only, chiller set to -25°C,
2 suspicious APVs on n side of Micron due to burnt strip
 

Bias connection of Origami repaired --> lower noise on p-side

  103   Sat Oct 9 00:17:02 2010 Markus FriedlBELLErunrun056225k09.10.2010 00:15:5309.10.2010 09:54:28

Belle stack w/o Origami2 after irradiation
HV=80V / I_start=255 µA, I_stop=243 µA  

cooling: Origami only, chiller set to -25°C,
2 suspicious APVs on n side of Micron (possibly due to burnt strip)

same position as in previous run

telescope run 20198 - now with correct telescope threshold settings

a lot of "Error detected in APV 21, subevent 2. Event discarded, reset sent." errors started at 09.10.2010 09:00:25 (after whole night without any error)

  106   Sat Oct 9 15:29:09 2010 Markus FriedlBELLErunrun0583000009.10.2010 15:26:5009.10.2010 16:21:37

Origami1 (n-side only) + Micron1 (non-irrad)
angle scan: 73 - now with multi6 (previous run was single)
HV=100V / 35uA (beginning of run) 34uA (end of run)
cooling: chiller set to 15C

telescope run 20201

Origami p-side does not receive triggers -> disabled

origami flex straight part needed to be folded due to severe rotation angle -> nanonics connector problem...

 

  108   Sat Oct 9 19:44:36 2010 Markus Friedlcommonend of success  09.10.2010 19:44:23NaN
  1   Wed Sep 15 10:25:13 2010 Marko DragiceviccommonEquipment List    
Slow Control:
3x Source Measurement Unit Keithley K2410
-- Inv.Nr.: 540-702, 1000EUR
-- Inv.Nr.: 540-730, 1000EUR
-- Inv.Nr.: 540-709, 1000EUR
-- Koax-Kabel + Adapter auf Banane
Scanning Voltmeter Keithley K2700 , Inv.Nr.: 540-698, 1000EUR
-- Shunt-Widerstand-Platine
-- Flachbandkabel fuer Verbindung Shunt-Platine<->K2700
TRHX
-- 3 Sensoren
-- 2 lange Flachbandkabel, 1 serielles Kabel
LV-Power-Supplies, je 150EUR
-- GW Instek GPC-1850, SN.: 4080392
-- GW Instek GPC-1850D, Inv.Nr.: 545-059
-- GW Instek GPC-1850D, Inv.Nr.: 545-062
-- Systron Donner HR 20-10A, SN.: 781-092
-- Systron Donner HR 20-10A, SN.: 781-096
-- GW Instek GPS-3030D SN.: E871711
-- HAMEG MHP4030 SN.: 057910044 500EUR
Oszilloskop Tektronix TDS 3054, SN.: B011109, 2500EUR
-- 3 probes
Die Katze (Belle-HV-Supply)
-- 2x HV-Kabel 30m (rot/schwarz)
GBIP
USB Adapter NI GPIB-USB-HS, S/N 14693EB, 100EUR
-Kabel, 3x lang, 1x kurz
USB Temperaturlogger PicoTech TC-08, S/N.: VSR 08/519 100EUR

BELLE DAQ (CERN):
Chrisu-PC, Inv.Nr.: 401-925
-- Monitore
---- Belinea, Inv.Nr.: 401-696
---- Gericom, SN.: M1132GR5467345
-- Keyboard & Maus
Wiener 9U-VME-Crate, Inv.Nr.: 545-043, 2000EUR
-- Power Supply
-- VME-Controller
-- 4 VME-Module (1x Buffer, 1, Neco, 2x FADC)
DOCK-Box
-- Power Kabel
VME-Kabel (bockig) + Verlaengerung
30m-Kabel (8xCat7, 2xCat5, 2xgrau)
Lemo-Kabel
100pin-Flachkabel Neco-Buffer
Bananenkabel
Hybridkabel
Special TLU-Adapter (flipping pin order of RJ45)
Schrauben für Crate-Montage
Erdungskabel (liegen am CERN im Labor)
Magic Box

APVDAQ (Mol):
PC Inv.Nr: 401-943
-- Ilyama E2407, S/N 1105702000889
-- Keyboard & Maus
VME Crate Inv.Nr: 545-030
-- Create Controller Inv.Nr: 540-732
-- 3x APVDAQ
Repeater Board
-- 3x auf Platte montiert
Kabel
-- VME-Kabel (bockig)
-- 4x Netzwerk (gelb 1:1 verschalten)
-- 4x Netzwerk (grau 1:1 verschalten)
-- 1x Flachband
-- diverse Bananen

DUT:
Schraubenbox bau
-- diverse Schrauben
-- Gewindestangen
-- Fluegelmittern
-- 2x Sockel
4mm Steckschlauch fuer Trockenluft
Anschluss 1/8" auf 4mm Steckschlauch
Druckminderer
-- 6mm Snap-In
-- 6mm Schlauch
Chiller Huber ministat 230, Inv.Nr.: 482-021, 3000EUR
-- Manual
-- Netzteil
-- langes serielles Kabel
-- 5-6mm Schlauch
-- Adapter
-- 5 Liter dest. Wasser (falls noch Platz ist)
-- Frostschutz
-- LabView (falls ferngesteuert)
Box-Deckel
Baseplates (4?)
Schwarze Selbstklebefolie
Alufolie
GROSSES SCHWARZES LICHTDICHTES TUCH !!!!
Module
-- 2 x Micron Trapezoid
-- 2 x 6" Origami
-- 9 x Micron Baby
-- 2 x CNM 2D Sensoren
-- 8x SiLC (No. 0-7)
-- 2x Pt

EDV:
Netzwerk-Switch:
-- D-Link 8-Port GBit-Switch DGS1008D S/N F37v89B010104, 40 EUR
WLAN-Router: Linksys WRT54GL-DE, SN.: CL7B1H502248, 60 EUR
1TB externe Festplatte: Western Digital MyBook, SN.: WCAJ1469094, 40 EUR
-- Netzgeraet
-- USB-Kabel
-- Firewire 400/800 Kabel
Webcam
USB-Stick
Etikettiergeraet: Brother P-touch 1000
Laptops
-- Apple MacBook (MV) Inv.Nr.: 401-810
(-- Apple MacBook Pro (MD) Inv Nr.: 401-831)
2x USB-Seriell Adapter
Netzwerkkabel
1 Trommel Ethernet-Kabel (100m, vom Walzel)
einige RJ-45 Stecker
2.5" externe HD
CD/DVD Rohlinge

Tools:
Diverse Adaptoren Lemo-BNC, Lemo-Lemo
Taschenlampe + 2x Hirnbirn
Massband
Multimeter
Werkzeug (Schraubenzieher & Co)
Pinzetten
Laserpointer
Schwarze Fetzen
Gaffa
Doppelscotch
Kabelbinder
Druckluft zur Reinigung
Adapter f. Steckdosen
Verteiler-Leisten
Kabeltrommel
Schaltbare Steckerleisten
Tixo klein & gross
Loetstation Advanced JBC, SN.: 76841165, inkl. Zubehoer
Ethernet-Crimp-Zange
Eisensagl
Schublehre
Wasserwaage

Misc:
Fondueset Wink
Spiegelreflex Digitalkamera
-- Stativ
-- Reflexionszelt
Scheinwerfer
-- 3 x 500 W
-- 2 x Stativ
Akkus+Ladegerät
Dickes Logbook
Kugelschreiber/Bleistifte
Pflaster
Carnet ATA
  64   Sun Oct 3 14:35:12 2010 Marko DragicevicCNMcalcal0098380003.10.2010 13:50:54 

CMN-SILC stack
HV_SILC (Katze)=75V, 0.25uA (6 SiLC)
HV_CNM (Keithley)=30V, CNM_1=84nA, CNM_2=4.3uA
DUT outside of beam

calibration started after 1 hour warmup

  73   Mon Oct 4 10:43:45 2010 Marko DragicevicPtrunrun0362560004.10.2010 10:33:0504.10.2010 11:35:51

Pt modules, angle scan

h01-Pt and h02-Pt
currents: h01=24.9A h02=12.5A
HV=200V beam on
angle: 39 deg

telescope run 20142

  89   Wed Oct 6 10:15:26 2010 Marko DragicevicMicron BabyXY Positions After Irradiation    

center position: 119/50/(7.5)

top left (direction jura, bottom right on sensor): 127/56.5/7.5

bottom right (direction saleve, top left on sensor): 111/43.5/7.5

  90   Wed Oct 6 11:03:59 2010 Marko DragicevicMicron Babycalcal0138380006.10.2010 11:03:12 

8 x Micron Baby (3 irradiated), no cooling
HV=100V I=115uA (start of run)
beam off

# VADJ/VPSP increased to 48 (was 30) for irradiated DUTs to restore baseline position (higher after irradiation)

ADC delay timing did not change after irradiation (verified)
 

  94   Wed Oct 6 23:02:09 2010 Marko DragiceviccommonBeam Configuration    

Beam Settings and Profile on 5.10.2010 - 17:00h

Saved as: H6B.801

  95   Wed Oct 6 23:03:15 2010 Marko DragicevicBELLEcalcal0148380006.10.2010 23:01:5606.10.2010 23:34:07

Belle stack without Origami2
HV=80V I=227uA

beam on

  3   Thu Sep 23 15:32:28 2010 Manfred ValentanMicron BabyModul B2Micron_2826_7_Baby4 -> UNBRAUCHBAR    

p-side: Hybrid 42
APV2: viele gerissene bonds der inneren Bondreihe
APV3: gerissene bonds innen

n-side: Hybrid 32
APV4: 0-35 fail
APV5: 10-40, 68 fail

 

  4   Thu Sep 23 15:37:54 2010 Manfred ValentanMicron BabyModul B2Micron_2826_19_Baby4 -> TRACKING & best DUT candidate    

p-side: Hybrid 48
alles ok

n-side: Hybrid 35 (wurde repariert, nachdem ein paar bonds dran glauben mussten...)
APV4: 15-25 hoher noise, keine Fehler zu sehen -> Sensorfehler?
APV5: 127&128 kreuzen sich, beim Behebungsversuch mehr Schaden angerichtet -> besser mal die Finger davon lassen!

  5   Thu Sep 23 15:54:20 2010 Manfred ValentanMicron BabyModul B2Micron_2826_19_Baby3 -> DUT & TRACKING    

p-side: Hybrid 47
alles ok

n-side: Hybrid 38
APV5: Streifen 127 hoher Noise

ALS DUT VERWENDEN!

 

  6   Thu Sep 23 16:00:31 2010 Manfred ValentanMicron BabyModul B2Micron_2826_19_Baby2 -> TRACKING    

p-side: Hybrid 46
alles ok

n-side: Hybrid 37
APV4: 70-75 schlecht, nix zu sehen -> Sensorfehler
APV5: 115-128 schlecht, rebond fail?

FUER TRACKING GEEIGNET!

 

 

 

  7   Thu Sep 23 16:01:10 2010 Manfred ValentanMicron BabyModul B2Micron_2826_7_Baby3 -> DUT    

p-side: Hybrid 40
APV3: letzte 10 Streifennicht gebondet, ging sich beim Prototyp-Modul an der Stelle nicht aus

n-side: Hybrid 30
APV5: 57-64 schlecht, rebond fail?

ALS DUT GEEIGNET!

 

 

 

 

  8   Thu Sep 23 16:12:54 2010 Manfred ValentanMicron BabyModul B2Micron_2826_7_Baby2 -> DUT & TRACKING    

p-side: Hybrid 41
alles ok

n-side: Hybrid 31
APV4: Streifen 0, 83 schlecht
APV5: Streifen 64, 88, 126 schlecht

ALS DUT GEEIGNET!
FUER TRACKING GEEIGNET!

  9   Thu Sep 23 16:19:54 2010 Manfred ValentanMicron BabyModul B2Micron_2826_1_Baby4, DUT EINGESCHRAENKT, TRACKING    

p-side: Hybrid 45
APV0: beide Randstreifen schlecht
APV1: Streifen 0 schlecht
APV3: beide Randstreifen etwas schlechter, nicht schlimm

n-side: Hybrid 36
APV4: 0, 9, 40, 79-85, 97, 102, 124 Sensorfehler?
APV5: 0-30 vereinzelt schlechte Streifen, 115-128 Bonds beruehren
 

ALS DUT AUGENZUDRUECKEN GEEIGNET!
FUER TRACKING GEEIGNET!

 

 

  10   Thu Sep 23 16:22:33 2010 Manfred ValentanMicron BabyModul B2Micron_2826_1_Baby3, TRACKING    

p-side: Hybrid 44
alles ok

n-side: Hybrid 34
APV4: zur Gaenze schlecht, APV-Fehler?
APV5: beide Randstreifen schlecht

FUER TRACKING GEEIGNET!

 

 

 

 

 

  11   Thu Sep 23 16:23:07 2010 Manfred ValentanMicron BabyModul B2Micron_2826_1_Baby2, DUT (eingeschraenkt) & TRACKING    

p-side: Hybrid 43
APV3: Streifen 9 schlecht

n-side: Hybrid 33
APV4: 0-10 andere Bond-Parameter?, 28&29 erhoehtes noise
APV5: 111-128: 4 schlechte Streifen + common mode correction?

ALS DUT GEEIGNET!
FUER TRACKING GEEIGNET!

 

 

 

 

 

  12   Fri Sep 24 12:09:32 2010 Manfred ValentanBELLEgds-file of Micron wafer    
  51   Fri Oct 1 10:06:59 2010 Manfred ValentanMicron Babyrunrun0217500001.10.2010 10:07:3701.10.2010 15:24:44

micron baby: 4 DUTs
HV=100V I=10.9uA (beginning)  13.6uA (end of run)
Beam on
60° rotation

 telescope run  20116

  70   Sun Oct 3 22:53:49 2010 Manfred ValentanPtrunrun0332560003.10.2010 22.47:3804.10.2010 00:02:37

Pt modules, angle scan

h01-Pt and h02-Pt
currents: h01=22.9A h02=6.9A
HV=200V beam on
angle: 33

telescope run 20138

  71   Mon Oct 4 00:08:55 2010 Manfred ValentanPtrunrun03418700004.10.2010 00:03:1804.10.2010 09:22:07

Pt modules, angle scan

h01-Pt and h02-Pt
currents: h01=21.9A h02=7.5A
HV=200V beam on
angle: 37

telescope run 20139

  72   Mon Oct 4 09:31:25 2010 Manfred ValentanPtrunrun0352560004.10.2010 09:28:40 

Pt modules, angle scan

h01-Pt and h02-Pt
currents: h01=24.7A h02=11.8A
HV=200V beam on
angle: 35 deg

telescope run 20140

  77   Mon Oct 4 14:15:22 2010 Manfred ValentanPtrunrun040 --> unusable --> no bias2560004.10.2010 14:?:?04.10.2010 14:32:14

Pt modules, angle scan

h01-Pt and h02-Pt
currents: h01=26.0A h02=13.4A
HV=200V beam on
angle: 47 deg

telescope run 20146

bias voltage has been ramped down during run039 --> needs to be repeated.

  83   Mon Oct 4 23:12:16 2010 Manfred ValentanBELLErunrun443000004.10.2010 23:?:?04.10.2010 23.57.23

angle scan Origami 1 and  Micron wedge 1
HV = 100V
chiller set to 14°C

angle: 30°
axis 1: 92.4 (horizontal)
axis 2: 35 (vertical)
axis 3: -22.5 (rotary table)

telescope run: 20150

  84   Mon Oct 4 23:59:05 2010 Manfred ValentanBELLErunrun45 04.10.2010 ??:??:??05.10.2010 00:56:48

angle scan Origami 1 and  Micron wedge 1
HV = 100V
chiller set to 14°C

angle: 45°
axis 1: 92.4 (horizontal)
axis 2: 35 (vertical)
axis 3: -37.5 (rotary table)

telescope run: 20151

  85   Tue Oct 5 10:20:30 2010 Manfred ValentanBELLErunrun4635000005.10.2010 01:00:0005.10.2010 10:16:07

angle scan Origami 1 and  Micron wedge 1
HV = 100V
chiller set to 14°C

angle: 15°
axis 1: 92.4 (horizontal)
axis 2: 35 (vertical)
axis 3: -7.5 (rotary table)

telescope run: 20152

  86   Tue Oct 5 10:23:09 2010 Manfred ValentanBELLErunrun473000005.10.2010 10:21:2005.10.2010

angle scan Origami 1 and  Micron wedge 1
HV = 100V
chiller set to 14°C

angle: 0°
axis 1: 92.4 (horizontal)
axis 2: 35 (vertical)
axis 3: +7.5 (rotary table)

telescope run: 20153

  101   Fri Oct 8 23:22:32 2010 Manfred ValentanBELLESchnittwinkel barrel vs. slanted    

17deg acceptance => Schnittwinkel barrel option = 90-17 = 73deg      ----->  rotary table 80.5

layer zusätzlich slanted um Winkel alpha => Schnittwinkel = 73 - alpha

slant angles: layer 4: 11.9deg => Schnittwinkel 61.1deg       ----->  rotary table 68.6
                     layer 5: 17.2deg => Schnittwinkel 55.8deg       ----->  rotary table 63.3
                     layer 6: 21.1deg => Schnittwinkel 51.9deg       ----->  rotary table 59.4

Im Vergleich mit senkrechtem Durchgang der Teilchen erwarte ich eine Vergrößerung der cluster width um den Faktor tan(Schnittwinkel):

slant layer 4: 1.81
slant layer 5: 1.47
slant layer 6: 1.28
barrel:           3.27

  111   Tue Oct 19 14:58:56 2010 Manfred ValentanMicron Babygeometry    
  112   Thu Mar 31 10:28:19 2011 Manfred ValentanMicron BabyDUT5, source run, post irrad, pre zupfcal100 31.03.2011 10:24:5931.03.2011 10:33:15

DUT5
cal-file: micronbaby_single_irrad_cal100.cfg


HV=+-50V
90Sr 1mCi ~centered
I_start=99muA
I_end=103muA

 

  113   Thu Mar 31 11:05:39 2011 Manfred ValentanMicron BabyDUT5, source run, post irrad, pre zupfrun100100k31.03.2011 11:02:1731.03.2011 11:15:41

DUT5
cal-file: micronbaby_multi6_irrad_run100.cfg


HV=+-50V
90Sr 1mCi ~centered
I_start=104µA
I_end=111µA

 

  114   Thu Mar 31 12:11:04 2011 Manfred ValentanMicron BabyDUT4, source run, post irrad, pre zupfcal101 31.03.2011 12:09:3631.03.2011 12:17:52

DUT4
config file: micronbaby_single_irrrad_cal101.cfg


HV=+-50V
90Sr 1mCi ~centered
I_start=128µA
I_end=140µA

 

  115   Thu Mar 31 12:24:24 2011 Manfred ValentanMicron BabyDUT4, source run, post irrad, pre zupfrun101100k31.03.2011 12:23:0031.03.2011 12:36:48

DUT4
config file: micronbaby_multi6_irrrad_run101.cfg


HV=+-50V
90Sr 1mCi ~centered
I_start=128µA
I_end=155µA

 

  116   Fri Apr 8 13:25:58 2011 Manfred ValentanMicron Babysensors and modules    

TRK1: B2Micron_2826_1_baby2

TRK2: B2Micron_2826_1_baby3

DUT3: B2Micron_2826_7_baby2 (common p-stop)

DUT4: B2Micron_2826_19_baby4 (combined p-stop)

DUT5: B2Micron_2826_19_baby3 (atoll p-stop)

TRK6: B2Micron_2826_1_baby4

TRK7: B2Micron_2826_19_baby2

GEW: B2Micron_2826_7_baby4

not used: B2Micron_2826_7_baby3

  117   Mon Apr 11 18:25:35 2011 Manfred ValentanMicron BabyDUT5, source run, post irrad, pre zupfcal1048380011.04.2011 18:12:3811.04.2011 18:20:50

DUT5 (atoll)
config file: D:/cern10/micronbaby/data_lab/DUT5/micronbaby_single_irrrad.cfg

HV=+-50V
90Sr 1mCi ~centered
I_start=26µA
I_end=48µA

 

  118   Mon Apr 11 18:37:28 2011 Manfred ValentanMicron BabyDUT5, source run, post irrad, pre zupfrun104100k11.04.2011 18:25:2811.04.2011 18:32:11

DUT5 (atoll)
config file: D:/cern10/micronbaby/data_lab/DUT5/micronbaby_multi6_irrrad.cfg

HV=+-50V
90Sr 1mCi ~centered
I_start=50µA
I_end=95µA

 

  119   Wed Apr 13 12:13:09 2011 Manfred ValentanMicron BabyDUT5, source run, post irrad, post zupf ** DO NOT USE **cal1058380013.04.2011 12:02:4113.04.2011 12:10:55

DUT5 (atoll), each second bond removed to simulate intermediate strips
config file: D:/cern10/micronbaby/data_lab/DUT5/micronbaby_single_irrrad.cfg

HV=+-50V
90Sr 1mCi ~centered
I_start=18µA
I_end=21.5µA

data recorded with new switching power supplies and old intcal, which doesn't ignore bad strips!!!!!

  121   Wed May 11 16:28:07 2011 Manfred ValentanMicron BabyDUT5, source run, post irrad, post zupfrun106100k11.05.2011 16:0011.05.2011 16:25

DUT5 (atoll)
config file: D:/cern10/micronbaby/data_lab/DUT5/micronbaby_multi6_irrrad.cfg

HV=+-50V
90Sr 1mCi ~centered
I_start=52µA
I_end=120µA

 DAQ modified so that only strips marked as good are considered when calculating the common mode correction.

  122   Wed May 11 16:28:20 2011 Manfred ValentanMicron BabyDUT5, source run, post irrad, post zupfcal106100k11.05.2011 16:0011.05.2011 16:25

DUT5 (atoll)
config file: D:/cern10/micronbaby/data_lab/DUT5/micronbaby_multi6_irrrad.cfg

HV=+-50V
90Sr 1mCi ~centered
I_start=52µA
I_end=120µA

 DAQ modified so that only strips marked as good are considered when calculating the common mode correction.

  123   Tue May 17 13:02:34 2011 Manfred ValentanMicron BabyTRK1, source run, unirrad, prezupfcal1078380017.05.2011 12:2017.05.2011 12:35

TRK1: B2Micron_2826_1_baby2 (common p-stop)
config file: D:/cern10/micronbaby/data_lab/TRK1/prezupf/micronbaby_single.cfg

HV=+-50V
90Sr 1mCi ~centered
I_start=1.1µA
I_end=2µA

  124   Tue May 17 13:08:08 2011 Manfred ValentanMicron BabyTRK1, source run, unirrad, prezupfrun107100k17.05.2011 12:39:3417.05.2011 13:03:05

DUT candidate common p-stop

TRK1: B2Micron_2826_1_baby2 (common p-stop)
config file: D:/cern10/micronbaby/data_lab/TRK1/prezupf/micronbaby_multi6.cfg

HV=+-50V
90Sr 1mCi ~centered
I_start=1.1µA
I_end=2µA

n-side: half of zones 1 and 4 obsolete due to noisy strips, rest is okay. DUT Candidate

  125   Tue May 17 13:31:32 2011 Manfred ValentanMicron BabyTRK2, source run, unirrad, prezupfcal1088380017.05.2011 13:17:1717.05.2011 13:25:27

TRK2: B2Micron_2826_1_baby3 (atoll p-stop)
config file: D:/cern10/micronbaby/data_lab/TRK2/prezupf/micronbaby_single.cfg

HV=+-50V
90Sr 1mCi ~centered
I_start=1.0µA
I_end=1.3µA

  126   Tue May 17 14:01:45 2011 Manfred ValentanMicron BabyTRK2, source run, unirrad, prezupfrun108100k17.05.2011 13:28:4817.05.2011 13:51:16

No DUT candidate (atoll p-stop)

TRK2: B2Micron_2826_1_baby3 (atoll p-stop)
config file: D:/cern10/micronbaby/data_lab/TRK2/prezupf/micronbaby_multi6.cfg

HV=+-50V
90Sr 1mCi ~centered
I_start=1.3µA
I_end=2µA

n-side: APV4 most strips unusable, no DUT candidate

  127   Tue May 17 14:36:36 2011 Manfred ValentanMicron BabyTRK6, source run, unirrad, prezupfcal1098380017.05.2011 14:18:1317.05.2011 14:34:25

TRK6: B2Micron_2826_1_baby4 (combined p-stop)
config file: D:/cern10/micronbaby/data_lab/TRK6/prezupf/micronbaby_multi6.cfg

HV=+-50V
90Sr 1mCi ~centered
I_start=1.3µA
I_end=1.8µA

  128   Tue May 17 14:37:23 2011 Manfred ValentanMicron BabyTRK6, source run, unirrad, prezupfrun109100k17.05.2011 14:34:3217.05.2011 15:00:02

DUT candidate combined p-stop

TRK6: B2Micron_2826_1_baby4 (combined p-stop)
config file: D:/cern10/micronbaby/data_lab/TRK6/prezupf/micronbaby_multi6.cfg

HV=+-50V
90Sr 1mCi ~centered
I_start=1.9µA
I_end=2.4µA

n-side zone 2 several unusable strips, zone 3 & 4 32 strips each suspicious. Nevertheless DUT candidate!

  129   Tue May 17 15:10:52 2011 Manfred ValentanMicron BabyTRK7, source run, unirrad, prezupfcal1108380017.05.2011 15:16:2517.05.2011 15:24:35

TRK7: B2Micron_2826_19_baby2 (common p-stop)
config file: D:/cern10/micronbaby/data_lab/TRK7/prezupf/micronbaby_single.cfg

HV=+-50V
90Sr 1mCi ~centered
I_start=1.1µA
I_end=1.7µA

  130   Tue May 17 17:43:24 2011 Manfred ValentanMicron BabyTRK7, source run, unirrad, prezupfrun110100k17.05.2011 15:39:3717.05.2011 16:02:54

DUT candidate common p-stop

TRK7: B2Micron_2826_19_baby2 (common p-stop)
config file: D:/cern10/micronbaby/data_lab/TRK7/prezupf/micronbaby_multi6.cfg

HV=+-50V
90Sr 1mCi ~centered
I_start=1.8µA
I_end=2.1µA

n-side: highest 32 strips of APV5 noisy = half of zone 4. Rest okay, DUT candidate

  131   Tue May 17 17:44:12 2011 Manfred ValentanMicron BabyGEW8, source run, unirrad, prezupfcal1118380017.05.2011 17:51:5017.05.2011 18:00:02

GEW8: B2Micron_2826_7_baby4 (combined p-stop)
config file: D:/cern10/micronbaby/data_lab/GEW8/prezupf/micronbaby_single.cfg

HV=+-50V
90Sr 1mCi ~centered
I_start=1.3µA
I_end=1.6µA

  132   Tue May 17 18:33:07 2011 Manfred ValentanMicron BabyGEW8, source run, unirrad, prezupfrun111100k17.05.2011 18:01:4117.05.2011 18:23:24

NOT usable as DUT

GEW8: B2Micron_2826_7_baby4 (combined p-stop)
config file: D:/cern10/micronbaby/data_lab/GEW8/prezupf/micronbaby_multi6.cfg

HV=+-50V
90Sr 1mCi ~centered
I_start=1.6µA
I_end=2.2µA

n-side: most of zones 1 and 3 unusable

  133   Tue May 17 18:49:16 2011 Manfred ValentanMicron BabyB2Micron_2826_7_baby3, source run, unirrad, prezupfcal1128380017.05.2011 18:50:5017.05.2011 18:59:04

B2Micron_2826_7_baby3 (atoll p-stop)
config file: D:/cern10/micronbaby/data_lab/7baby3/prezupf/micronbaby_single.cfg

HV=+-50V
90Sr 1mCi ~centered
I_start=1.2µA
I_end=1.4µA

  134   Tue May 17 18:53:33 2011 Manfred ValentanMicron BabyB2Micron_2826_7_baby3, source run, unirrad, prezupfrun112100k17.05.2011 19:00:2117.05.2011 19:22:45

DUT candidate atoll p-stop

B2Micron_2826_7_baby3 (atoll p-stop)
config file: D:/cern10/micronbaby/data_lab/7baby3/prezupf/micronbaby_multi6.cfg

HV=+-50V
90Sr 1mCi ~centered
I_start=1.4µA
I_end=1.8µA

n-side: looks very good except for a few strips in the middle of APV5 -> DUT candidate

  135   Tue May 17 19:08:29 2011 Manfred ValentanMicron Babysensors for source test with intermediate strips    

Every second bond of these sensors will be removed to mimic the effect of an intermediate strip. For comparison, this is done both with irradiated and unirradiated sensors.

DUT3: B2Micron_2826_7_baby2, common p-stop, irradiated

DUT4: B2Micron_2826_19_baby4, combined p-stop, irradiated

DUT5: B2Micron_2826_19_baby3, atoll p-stop, irradiated (Wolfgang T. took this sensor to the SEM, it's destroyed by now)

TRK6: B2Micron_2826_1_baby4, combined p-stop, unirradiated

TRK7: B2Micron_2826_19_baby2, common p-stop, unirradiated

            B2Micron_2826_7_baby3, atoll p-stop, unirradiated

 

  136   Wed May 18 10:12:32 2011 Manfred ValentanMicron BabyDUT3, source run, unirrad, prezupfcal1138380018.05.2011 09:42:0818.05.2011 09:50:23

DUT3: B2Micron_2826_7_baby2 (common p-stop)
config file: D:/cern10/micronbaby/data_lab/DUT3/prezupf/micronbaby_single_irrad.cfg

HV=+-50V
90Sr 1mCi ~centered
I_start=13µA
I_end=20µA

  137   Wed May 18 10:38:07 2011 Manfred ValentanMicron BabyDUT3, source run, irrad, prezupfrun113100k18.05.2011 10:03:1518.05.2011 10:25:14

DUT3: B2Micron_2826_7_baby2 (common p-stop)
config file: D:/cern10/micronbaby/data_lab/DUT3/prezupf/micronbaby_single_irrad.cfg

HV=+-50V
90Sr 1mCi ~centered
I_start=20µA
I_end=26µA

  138   Wed May 18 12:06:42 2011 Manfred ValentanMicron BabyDUT4, source run, irrad, prezupfcal1148380018.05.2011 11:42:2218.05.2011 11:50:36

DUT4: B2Micron_2826_19_baby4 (combined p-stop)
config file: D:/cern10/micronbaby/data_lab/DUT4/prezupf/micronbaby_single_irrad.cfg

HV=+-50V
90Sr 1mCi ~centered
I_start=50µA
I_end=104µA

  139   Wed May 18 14:40:33 2011 Manfred ValentanMicron BabyTRK6, source run, unirrad, postzupfcal1158380018.05.2011 13:41:4418.05.2011 13:49:58

TRK6: B2Micron_2826_1_baby4 (combined p-stop)
config file: D:/cern10/micronbaby/data_lab/TRK6/postzupfzupf/micronbaby_single_postzupf.cfg

HV=+-50V
90Sr 1mCi ~centered
I_start=1.6µA
I_end=1.7µA

Every second bond zupfed. However, there was a mistake and the first ~60 channels are shifted by 1, see attachment!

  140   Wed May 18 14:42:49 2011 Manfred ValentanMicron BabyTRK6, source run, unirrad, postzupfrun115100k18.05.2011 13:53:5418.05.2011 13:53:54

TRK6: B2Micron_2826_1_baby4 (combined p-stop)
config file: D:/cern10/micronbaby/data_lab/TRK6/postzupfzupf/micronbaby_multi6_postzupf.cfg

HV=+-50V
90Sr 1mCi ~centered
I_start=1.7µA
I_end=1.8µA

Every second bond zupfed. However, there was a mistake and the first ~60 channels are shifted by 1, see attachment!

  141   Wed May 18 15:36:03 2011 Manfred ValentanMicron BabyTRK7, source run, unirrad, postzupfcal1168380018.05.2011 14:43:1818.05.2011 14:51:31

TRK7: B2Micron_2826_19_baby2 (common p-stop)
config file: D:/cern10/micronbaby/data_lab/TRK7/postzupf/micronbaby_single_postzupf.cfg

HV=+-50V
90Sr 1mCi ~centered
I_start=1.6µA
I_end=1.7µA

every second bond zupfed...

  142   Wed May 18 15:38:29 2011 Manfred ValentanMicron BabyTRK7, source run, unirrad, postzupfrun116100k18.05.2011 15:02:0518.05.2011 15:24:07

TRK7: B2Micron_2826_19_baby2 (common p-stop)
config file: D:/cern10/micronbaby/data_lab/TRK7/postzupf/micronbaby_multi6_postzupf.cfg

HV=+-50V
90Sr 1mCi ~centered
I_start=1.7µA
I_end=2.3µA

every second bond zupfed...

  143   Wed May 18 16:31:12 2011 Manfred ValentanMicron BabyB2Micron_2826_7_baby3, source run, unirrad, prezupfcal1178380018.05.2011 15:44:5818.05.2011 15:53:10

B2Micron_2826_7_baby3 (atoll p-stop)
config file: D:/cern10/micronbaby/data_lab/7baby3/postzupf/micronbaby_single_postzupf.cfg

HV=+-50V
90Sr 1mCi ~centered
I_start=1.0µA
I_end=1.3µA

Every second bond zupfed...

  144   Wed May 18 16:33:29 2011 Manfred ValentanMicron BabyB2Micron_2826_7_baby3, source run, unirrad, prezupfrun117100k18.05.2011 15:59:3918.05.2011 16:21:24

B2Micron_2826_7_baby3 (atoll p-stop)
config file: D:/cern10/micronbaby/data_lab/7baby3/postzupf/micronbaby_multi6_postzupf.cfg

HV=+-50V
90Sr 1mCi ~centered
I_start=1.3µA
I_end=1.7µA

Every second bond zupfed...

  145   Thu May 19 09:42:28 2011 Manfred ValentanMicron BabyDUT3, source run, irrad, postzupfcal1188380019.05.2011 08:56:1819.05.2011 09:04:30

DUT3: B2Micron_2826_7_baby2 (common p-stop)
config file: D:/cern10/micronbaby/data_lab/DUT3/postzupf/micronbaby_single_irrad_postzupf.cfg

HV=+-50V
90Sr 1mCi ~centered
I_start=14.9µA
I_end=17.6µA

Every second bond zupfed

  146   Thu May 19 09:44:39 2011 Manfred ValentanMicron BabyDUT3, source run, irrad, postzupfrun118100k19.05.2011 09:07:3319.05.2011 09:27:21

DUT3: B2Micron_2826_7_baby2 (common p-stop)
config file: D:/cern10/micronbaby/data_lab/DUT3/postzupf/micronbaby_multi6_irrad_postzupf.cfg

HV=+-50V
90Sr 1mCi ~centered
I_start=18.0µA
I_end=22.6µA

Every second bond zupfed

  147   Thu May 19 11:02:08 2011 Manfred ValentanMicron BabyDUT4, source run, irrad, postzupfcal1198380019.05.2011 09:57:5719.05.2011 10:06:06

DUT4: B2Micron_2826_19_baby4 (combined p-stop)
config file: D:/cern10/micronbaby/data_lab/DUT4/postzupf/micronbaby_single_irrad_postzupf.cfg

HV=+-50V
90Sr 1mCi ~centered
I_start=95µA
I_end=137µA

Every second bond zupfed...

  148   Thu May 19 11:04:04 2011 Manfred ValentanMicron BabyDUT4, source run, irrad, postzupfrun119100k19.05.2011 10:08:1419.05.2011 10:29:02

DUT4: B2Micron_2826_19_baby4 (combined p-stop)
config file: D:/cern10/micronbaby/data_lab/DUT4/postzupf/micronbaby_multi6_irrad_postzupf.cfg

HV=+-50V
90Sr 1mCi ~centered
I_start=141µA
I_end=167µA

Every second bond zupfed...

  149   Thu May 19 11:06:41 2011 Manfred ValentanMicron BabyDUT4, source run, irrad, prezupfrun114100k18.05.2011 11:57:1318.05.2011 12:13:12

DUT4: B2Micron_2826_19_baby4 (combined p-stop)
config file: D:/cern10/micronbaby/data_lab/DUT4/prezupf/micronbaby_multi6_irrad.cfg

HV=+-50V
90Sr 1mCi ~centered
I_start=118µA
I_end=168µA

keine hitmaps gespeichert...

  49   Fri Oct 1 09:33:45 2010 Immanuel GfallcommonEudet Hit Correlation, Num Clusters Screenshots201151611359:309:30

Eudet-Num_Clusters-run020115.jpg

[IMG]49/2[/IMG]

  33   Wed Sep 29 11:53:16 2010 Erik HuemerBELLErunrun0111900329.09.2010 12:19:5729.09.2010 14:00:57

Belle stack: Origami-Micron-Micron-Origami
HV=100V, Ibias=83.22µA, beam on
no cooling

Temp. at modules: 
Origami 1: 50°C
Micron 1: 46°C
Micron 2: 48°C
Origami 2: 48°C

standard I2C settings
centered

telescope run 20085 (continued)

  50   Fri Oct 1 09:42:02 2010 Erik HuemerMicron Babyrunrun020184301.10.2010 09:59:09 01.10.2010 10.05

micron baby: 4 DUTs
HV=100V I=10.9uA
Beam on
60° rotation

Teleskop nicht neu gestartet, machma nochamal

  56   Sat Oct 2 15:24:00 2010 Erik HuemerITEXY Position and Slow Control    

center position: 119/48/187,5

 

  65   Sun Oct 3 16:23:20 2010 Erik HuemerPtXY/R Position    

centerposition: 119/43/187,5

27 grad: 214,5

  68   Sun Oct 3 20:44:40 2010 Erik HuemerPtrunrun0312560003.10.2010 19:42:34 

Pt modules, angle scan

h01-Pt and h02-Pt
currents: h01=20.5A h02=6.5A
HV=200V beam on
angle: 29

telescope run 20135

  69   Sun Oct 3 21:49:19 2010 Erik HuemerPtrunrun0322560003.10.2010 21:44:3003.10.2010 22.40.07

Pt modules, angle scan

h01-Pt and h02-Pt
currents: h01=22.9A h02=6.9A
HV=200V beam on
angle: 31

telescope run 20136

  75   Mon Oct 4 12:24:38 2010 Erik HuemerPtrunrun0382560004.10.2010 12:22:0904.10.2010 12:43:40

Pt modules, angle scan

h01-Pt and h02-Pt
currents: h01=26.6A h02=13.1A
HV=200V beam on
angle: 43 deg

telescope run 20144

  76   Mon Oct 4 12:50:13 2010 Erik HuemerPtrunrun039 --> run out of air --> repeat2560004.10.2010 12:45:1704.10.2010 14:00:00

Pt modules, angle scan

h01-Pt and h02-Pt
currents: h01=26.0A h02=13.4A
HV=200V beam on
angle: 45 deg

run out of dry air  --> h01 run into compliance --> HV turned off during run automatically  --> has to be repeated

telescope run 20145

  21   Tue Sep 28 14:38:24 2010 Christian IrmlerBELLETemperature sensors Belle stack    

PicoLogic TC-08 temperature sensor assignment Belle stack:

Sensor type: K

channel 1:  Origami_mod1_in
channel 2:  Origami_mod1_out
channel 3:  Origami_mod2_in
channel 4:  Origami_mod2_out
channel 5:  Micron_wedge_mod1_p
channel 6:  Micron_wedge_mod1_n
channel 7:  Micron_wedge_mod2_p
channel 8:  Micron_wedge_mod2_n
 

The cooling pipes of the two Origami modules and that of the Micron modules are connected in series, respectively.

  42   Thu Sep 30 10:56:34 2010 Christian IrmlercommonRoom numbers    

Room and telefone numbers.

 

Name Building Room Tel.
Bergi 38 418 70 418 or 162471 (mobile)
Markus 41 021 60 021
Manfred 38 404 70 404
Erik 38 463 70 463
Immanuel 38 313 70 313
Chrisu 39 324

79 324

Marko 39 007 79 007
Paqui 38 107 70 107

 

  66   Sun Oct 3 18:23:27 2010 Christian IrmlerPtcalcal0108380003.10.2010 18:26:49  

pt modules angle scan
h01-Pt and h02-Pt
currents: h01=23.1µA h02=10.4µA
HV=200V
beam on

modules flushed with dry air

 

  67   Sun Oct 3 18:52:56 2010 Christian IrmlerPtrunrun0302560003.10.2010 19:16:29 

Pt modules, angle scan

h01-Pt and h02-Pt
currents: h01=23.1A h02=10.4A
HV=200V beam on
angle: 27

telescope run 20134

  74   Mon Oct 4 11:43:05 2010 Christian IrmlerPtrunrun0372560004.10.2010 11:40:1504.10.2010 12:15:03

Pt modules, angle scan

h01-Pt and h02-Pt
currents: h01=25.4A h02=13.1A
HV=200V beam on
angle: 41 deg

telescope run 20143

  78   Mon Oct 4 15:39:34 2010 Christian IrmlerPtrunrun0412560004.10.2010 15:46:22 

Pt modules, angle scan

h01-Pt and h02-Pt
currents: h01=26.0A h02=13.4A
HV=200V beam on
angle: 45 deg
position axis = 232.5

repetition of run039

telescope run20147

  79   Mon Oct 4 16:15:48 2010 Christian IrmlerPtrunrun0422560004.10.2010 16:12:5204.10.2010 16:35:18

Pt modules, angle scan

h01-Pt and h02-Pt
currents: h01=28.1A h02=2.4A
HV=200V beam on
angle: 47 deg

repetition of run040, but now biased :-)

telescope run 20148

  80   Mon Oct 4 16:29:36 2010 Christian Irmlercommonbeam settings    

beam settings optimized by beamline operator

wire champer display fixed

  81   Mon Oct 4 20:16:19 2010 Christian IrmlerBELLEcalcal0118380004.10.2010 20:15:00 

angle scan Origami 1 and  Micron wedge 1
HV = 100V
chiller set to 14°C

HV connection of Origami 1 repaired

  82   Mon Oct 4 21:01:25 2010 Christian IrmlerBELLErunrun433000004.10.2010 20:59:4804.10.2010 23:04:24

angle scan Origami 1 and  Micron wedge 1
HV = 100V
chiller set to 14°C

angle: 60°
axis 1: 92.4 (horizontal)
axis 2: 35 (vertical)
axis 3: -52.5 (rotary table)

telescope run: 20149

  87   Tue Oct 5 17:50:23 2010 Christian IrmlerITEcalcal0128380005.10.2010 17:50:2605.10.2010 18:09:48

6 x SILC + 2 x ITE
HV=100V
telescope position: 124/48

DUTs and SILC4/5 swapped
new module order (downstream): SILC0 - SILC3 - SILC1 - W7 - W9 - SILC2 - SILC4 -SILC5
SILC1 and SILC2 are horizontal

beam on

modules flushed with dry air (black tube)
rel. humidity: ~0% @ 26°C

  88   Tue Oct 5 18:13:05 2010 Christian IrmlerITErunrun04853312505.10.2010 18:14:5706.10.2010 09:27:44

6 x SILC + 2 x ITE
HV=100V
telescope position: 124/48
telescope run: 20154-20155

DUTs and SILC4/5 swapped
new module order (downstream): SILC0 - SILC3 - SILC1 - W7 - W9 - SILC2 - SILC4 -SILC5
SILC1 and SILC2 are horizontal

beam on

modules flushed with dry air (black tube)
rel. humidity: ~0% @ 26°C

  98   Fri Oct 8 18:12:15 2010 Christian IrmlerBELLErunrun0539800008.10.2010 00:33:1408.10.2010 13:36:57

Belle stack w/o Origami2 after irradiation
HV=80V
Telescope position 55/30/277.5
NIM trigger

temperature of chiller set to 15°C

Analog signal of APVs #22 and #23 has been bound to ground after 1200 events.

  102   Fri Oct 8 23:43:07 2010 Christian IrmlerBELLErunrun0551231608.10.2010 23:42:5109.10.2010 00:14:56

Belle stack w/o Origami2 after irradiation
HV=80V / 255 µA
cooling: Origami only, chiller set to -25°C,
2 suspicious APVs on n side of Micron due to burnt strip

same position as in previous run

telescope run 20197  - wrong config file @ telescope -> new run with correct settings

  104   Sat Oct 9 12:00:55 2010 Christian IrmlerBELLEcalcal0178380009.10.2010 11:59:37 

Origami1 (n-side only) + Micron1 (non-irrad)
angle scan: 73°
HV=100V / 40 µA
cooling: chiller set to 15°C

Origami p-side does not receive triggers -> disabled

origami flex straight part needed to be folded due to severe rotation angle -> nanonics connector problem...

  110   Mon Oct 11 11:18:17 2010 Christian Irmlercommonend of success  09.10.2010 19:44:23NaN

der Beiweis  :-)

ELOG V3.1.5-fc6679b