Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS September/October 2010  Not logged in ELOG logo
Message ID: 13     Entry time: Mon Sep 27 15:39:33 2010
Author: Thomas Bergauer 
Project: common 
Subject: PI-XY Table 
Run Number:  
Events:  
StartTime:  
EndTime:  

M-521.dd: (links/rechts)

downstream rechts => pos. limit [0]

downstream links => neg. limit [207]

----------------------

M-511.dd: (oben/unten)

oben [102]

unten [0]

----------------------

M-060.dg: (rotation)

parallel beam [7,5]

 

-------------------------------------------

Remote Control:

lokal ssh tunnel starten:
ssh -g -C -L5959:zenpixelw:5900 eudet@eudetmac001.cern.ch

danach mit "Chicken of the VNC" (von lokalem Mac) VNC auf localhost (port 5959). 

ELOG V3.1.5-fc6679b