Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS September/October 2010  Not logged in ELOG logo
Message ID: 25     Entry time: Tue Sep 28 22:07:16 2010
Author: Markus Friedl 
Project: BELLE 
Subject: cal 
Run Number: cal002 DO NOT USE -> go to cal003 
Events: 83800 
StartTime: 28.09.2010 22:01:55 
EndTime:  

Belle stack (Origami, Micron, Micron, Origami)

now cooling only for Origami, Micron are uncooled

chiller set point: -25°C, measured values on Origami: -10°C

HV=100V, Ibias=38µA, beam off

modified I2C settings for cold modules

temperature monitoring: Origami2 pipes in<->out swapped (to achieve shorter tubes)

 

PROBLEM: Origami n channels are swapped -> USE cal003 INSTEAD!!!

ELOG V3.1.5-fc6679b