Message ID: 90     Entry time: Wed Oct 6 11:03:59 2010
Author: Marko Dragicevic 
Project: Micron Baby 
Subject: cal 
Run Number: cal013 
Events: 83800 
StartTime: 06.10.2010 11:03:12 
EndTime:  

8 x Micron Baby (3 irradiated), no cooling
HV=100V I=115uA (start of run)
beam off

# VADJ/VPSP increased to 48 (was 30) for irradiated DUTs to restore baseline position (higher after irradiation)

ADC delay timing did not change after irradiation (verified)
 