Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS September/October 2010  Not logged in ELOG logo
Message ID: 53     Entry time: Fri Oct 1 23:50:28 2010
Author: Thomas Bergauer 
Project: CNM 
Subject: run 
Run Number: run023 
Events: 2275 
StartTime: 01.10.2010 23:49:29 
EndTime: 01.10.2010 23:53:12 

CMN-SILC stack
HV_SILC (Katze)=75V, 0.25uA (6 SiLC)
HV_CNM (Keithley)=30V, CNM_1=84nA, CNM_2=4.3uA

too much optimized alignment (XY-table to 133/74/187.5)   ;-)

telescope run 20119

ELOG V3.1.5-fc6679b