Message ID: 82     Entry time: Mon Oct 4 21:01:25 2010
Author: Christian Irmler 
Project: BELLE 
Subject: run 
Run Number: run43 
Events: 30000 
StartTime: 04.10.2010 20:59:48 
EndTime: 04.10.2010 23:04:24 

angle scan Origami 1 and  Micron wedge 1
HV = 100V
chiller set to 14°C

angle: 60°
axis 1: 92.4 (horizontal)
axis 2: 35 (vertical)
axis 3: -52.5 (rotary table)

telescope run: 20149