Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS September/October 2010  Not logged in ELOG logo
Message ID: 54     Entry time: Fri Oct 1 23:55:12 2010
Author: Thomas Bergauer 
Project: CNM 
Subject: run 
Run Number: run024 
Events: 320k 
StartTime: 01.10.2010 23:53:12 
EndTime: 02.10.2010 09:47:37 

CMN-SILC stack
HV_SILC (Katze)=75V, 0.25uA (6 SiLC)
HV_CNM (Keithley)=30V, CNM_1=84nA, CNM_2=4.3uA

optimized alignment (XY-table to 133/76/187.5)

telescope run 20120

Attachment 1: cnm_2d_2.png  16 kB  Uploaded Sat Oct 2 08:38:45 2010  | Hide | Hide all
cnm_2d_2.png
Attachment 2: cnm_2d_1.png  17 kB  Uploaded Sat Oct 2 10:37:26 2010  | Hide | Hide all
cnm_2d_1.png
ELOG V3.1.5-fc6679b