  HEPHY logbook for testbeam at SPS September/October 2010  Not logged in ELOG logo
Message ID: 78     Entry time: Mon Oct 4 15:39:34 2010
Author: Christian Irmler 
Project: Pt 
Subject: run 
Run Number: run041 
Events: 25600 
StartTime: 04.10.2010 15:46:22 
EndTime:  

Pt modules, angle scan

h01-Pt and h02-Pt
currents: h01=26.0A h02=13.4A
HV=200V beam on
angle: 45 deg
position axis = 232.5

repetition of run039

telescope run20147