Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS October 2012 and Irradiation Mol, all entries  Not logged in ELOG logo
IDdown Date Author Project Subject Run Number Events StartTime EndTime Data Text Attachments
  80   Wed Oct 31 15:54:59 2012 Christian IrmlercommonEthernetkabel zu H6A    UnknownEthernetkabel HNA447 -> H6A:
Das obere Ende im Counting Hut liegt
im Zwischenboden unterhalb der orangenen
 2012-10-31_15.47.42.jpg2012-10-31_12.28.32.jpg 
  79   Tue Oct 30 22:15:41 2012 Markus FriedlMicronOrigami_grossrunrun041100k30.10.2012 22:09:13 UnknownCooling for 2DSSD established after some
struggle.
2DSSD fully read out with cooling
 temperatures_run041.jpg 
  78   Tue Oct 30 18:35:51 2012 Christian IrmlerMicronOrigami_grossrunrun040100k30.10.2012 18:23:2130.10.2012 21:55:53 UnknownCooling for 2DSSD established after some
struggle.
2DSSD fully read out with cooling
 temperatures_run040.jpg 
  77   Tue Oct 30 17:24:01 2012 Markus FriedlMicronOrigami_grosscalcal0408380030.10.2012 17:20:28 30.10.2012 17:54:09UnknownCooling for 2DSSD established after some
struggle.
2DSSD fully read out with cooling
  
  76   Tue Oct 30 11:05:32 2012 Markus FriedlHPK_babyrunrun039150k30.10.2012 11:03:1930.10.2012 14:57:57UnknownHPK baby stack after irradiation - no cooling
I =  420A and growing (warming
up)
  
  75   Tue Oct 30 10:37:19 2012 Markus FriedlHPK_babycalcal0398380030.10.2012 10:35:35 30.10.2012 11:02:06 GoodTurned off cooling, now taking warm data
 
HPK baby stack after irradiation
  
  74   Mon Oct 29 23:13:52 2012 Markus FriedlHPK_babyrunrun03847650029.10.2012 23:13:0530.10.2012 10:22:54UnknownHPK baby stack after irradiation with partial
cooling (HPK neutron & HPK neutron/gamma)
HV = +75 V  -75V
  
  73   Mon Oct 29 22:36:52 2012 Markus FriedlHPK_babycalcal0388380029.10.2012 22:17:3429.10.2012 22:47:47GoodHPK baby stack after irradiation with partial
cooling (HPK neutron & HPK neutron/gamma)
HV = +75 Vm  -75V
  
  72   Mon Oct 29 12:24:41 2012 Markus FriedlInfineonrunrun03730138229.10.2012 12:22:2229.10.2012 21:05:57GoodInfineon stack Version 2 after irradiation
HV = +300 V
I = 162 A
  
  71   Mon Oct 29 11:36:40 2012 Markus FriedlInfineoncalcal0378380029.10.2012 11:35:1229.10.2012 11:58:02 GoodInfineon stack Version 2 after irradiation
HV = +300 V
I = 137 A
  
  70   Mon Oct 29 04:02:16 2012 Manfred ValentanMicronBabyrunrun03629629429.10.2012 03:53:3329.10.2012 11:05:35UnknownMicron Baby stack 2 after irradiation (intermediate
strips)
HV = -100 V
  
  69   Sun Oct 28 20:07:28 2012 Markus FriedlMicronBabyrunrun03530411028.10.2012 20:01:4829.10.2012 03:50:44GoodMicron Baby stack 2 after irradiation (intermediate
strips)
HV = -100 V
  
  68   Sun Oct 28 16:22:35 2012 Christian IrmlerMicronBabyrunrun03410186428.10.2012 16:12:24 28.10.2012 18:34:24GoodMicron Baby stack 2 after irradiation (intermediate
strips)
HV = -100 V
  
  67   Sun Oct 28 15:46:07 2012 Markus FriedlMicronBabycalcal0348380028.10.2012 15:19:1028.10.2012 15:40:47GoodMicron Baby stack 2 after irradiation (intermediate
strips)
HV = -100 V
  
  66   Sun Oct 28 08:37:53 2012 Christian IrmlerMicronOrigami_grossrunrun0336693728.10.2012 08:33:4228.10.2012 14:10:43 UnknownBelle stack 2 after gamma irradiation
HV = +50V -50V
I = 101 uA
 temp_run33.JPGtemp_run33_2.JPG 
  65   Sun Oct 28 02:51:49 2012 Markus FriedlMicronOrigami_grossrunrun032150k28.10.2012 02:47:2428.10.2012 08:31:19 GoodBelle stack 2 after gamma irradiation
HV = +50V -50V
I = 101 uA
  
  64   Sat Oct 27 21:49:08 2012 Markus FriedlMicronOrigami_grossrunrun031150k27.10.2012 21:42:4628.10.2012 02:35:55 (+1h due to winter time)GoodBelle stack 2 after gamma irrdiation
HV = +50V -50 V
I = 102 uA
  
  63   Sat Oct 27 19:36:24 2012 Markus FriedlMicronOrigami_grosscalcal0318380027.10.2012 19:59:5027.10.2012 20:44:38GoodBelle stack 2 after irradiation
HV = +50V -50V
I = 112 µA
  
  62   Sat Oct 27 07:51:49 2012 Manfred ValentanMicronBabyrunrun03037667827.10.2012 07:49:0927.10.2012 17:32:07GoodAfter irradiation
xy-table: x=319.4, y=87.6
beam hits APV1
  
  61   Sat Oct 27 01:13:47 2012 Christian IrmlerMicronBabyrunrun029307k27.10.2012 01:02:4927.10.2012 07:36:34GoodAfter irradiation
xy-table: x=319.4, y=74.6
beam hits APV0
  
  60   Sat Oct 27 00:43:55 2012 Christian IrmlerMicronBabycalcal0298380027.10.2012 00:10:1527.10.2012 00:36:55GoodAfter irradiation
 
Micron baby stack after gamma irrdiation
  
  59   Wed Oct 24 17:24:40 2012 Thomas BergauerMicronOrigami_grossrun ohne Strom ;-(run028   Unknown 
Belle Stack 4: 2 DSSD -z, Origami
#3, #1, wedge new #2
  
  58   Wed Oct 24 09:51:41 2012 Thomas BergauerMicronOrigami_grosscalcal0288380024.10.2012 09:50:5324.10.2012 10:39:43Unknown Belle Stack 4: 2 DSSD -z, Origami
#3, #1, wedge new #2
HV = +-2.5V, Ibias=14.5uA
Position:
  
  57   Wed Oct 24 08:25:04 2012 Thomas BergauerMicronOrigami_grosscalcal0278380024.10.2012 08:22:2524.10.2012 09:10:19Unknown Belle Stack 4: 2 DSSD -z, Origami
#3, #1, wedge new #2
HV = +-5V, Ibias=23.5uA
Position:
  
  56   Tue Oct 23 23:12:03 2012 Thomas BergauerMicronOrigami_grossrunrun02722084723.10.2012 23:10:1424.10.2012 08:19:51Unknown Belle Stack 4: 2 DSSD -z, Origami
#3, #1, wedge new #2
HV = +-5V, Ibias=23.5uA
Position:
  
  55   Tue Oct 23 16:06:09 2012 Markus FriedlMicronOrigami_grossrunrun02610212423.10.2012 16:04:4723.10.2012 23:04:56UnknownBelle Stack 4: 2 DSSD -z, Origami #3, #1,
wedge new #2
HV = +-10V, Ibias=36uA
  
  54   Tue Oct 23 15:55:58 2012 Markus FriedlMicronOrigami_grosscalcal0268380023.10.2012 14:56:4723.10.2012 15:42:17 GoodBelle Stack 4: 2 DSSD -z, Origami #3, #1,
wedge new #2
HV = +-10V, Ibias=36uA
  
  53   Tue Oct 23 13:50:44 2012 Markus FriedlMicronOrigami_grosscalcal0258380023.10.2012 13:47:09 23.10.2012 14:35:05GoodBelle Stack 4: 2 DSSD -z, Origami #3, #1,
wedge new #2
HV = +-15V, Ibias=48uA
  
  52   Tue Oct 23 08:22:42 2012 Markus FriedlMicronOrigami_grossrunrun02510000023.10.2012 08:21:3723.10.2012 13:47:09GoodBelle Stack 4: 2 DSSD -z, Origami #3, #1,
wedge new #2
HV = +-15V, Ibias=47uA
  
  51   Mon Oct 22 19:19:53 2012 Markus FriedlMicronOrigami_grossrunrun02426000022.10.2012 19:18:1623.10.2012 08:17:20 GoodBelle Stack 4: 2 DSSD -z, Origami #3, #1,
wedge new #2
HV = +-20V, Ibias=57uA
  
  50   Mon Oct 22 10:10:16 2012 Markus FriedlMicronOrigami_grosscalcal0248380022.10.2012 10:08:5322.10.2012 10:54:18GoodBelle Stack 4: 2 DSSD -z, Origami #3, #1,
wedge new #2
HV = +-20V, Ibias=53uA
  
  49   Mon Oct 22 00:57:05 2012 Markus FriedlMicronOrigami_grossrunrun02317662922.10.2012 00:55:5922.10.2012 10:04:38GoodBelle Stack 4: 2 DSSD -z, Origami #3, #1,
wedge new #2
HV = +-25V, Ibias=65uA
  
  48   Mon Oct 22 00:08:39 2012 Markus FriedlMicronOrigami_grosscalcal0238380022.10.2012 00:07:3422.10.2012 00:53:02GoodBelle Stack 4: 2 DSSD -z, Origami #3, #1,
wedge new #2
HV = +-25V, Ibias=65uA
  
  47   Sun Oct 21 16:04:06 2012 Markus FriedlMicronOrigami_grossrunrun02215128221.10.2012 18:16:5322.10.2012 00:04:42GoodBelle Stack 4: 2 DSSD -z, Origami #3, #1,
wedge new #2
HV = +-30V, Ibias=70uA
  
  46   Sun Oct 21 15:15:45 2012 Markus FriedlMicronOrigami_grosscalcal0228380021.10.2012 15:13:4721.10.2012 16:00:25GoodBelle Stack 4: 2 DSSD -z, Origami #3, #1,
wedge new #2
HV = +-30V, Ibias=70uA
  
  45   Sun Oct 21 10:39:15 2012 Markus FriedlMicronOrigami_grossrunrun02110000021.10.2012 10:37:2621.10.2012 15:04:49GoodBelle Stack 4: 2 DSSD -z, Origami #3, #1,
wedge new #2
HV = +-35V, Ibias=69uA
  
  44   Sun Oct 21 09:50:00 2012 Markus FriedlMicronOrigami_grosscalcal0218380021.10.2012 09:50:07 21.10.2012 10:35:40GoodBelle Stack 4: 2 DSSD -z, Origami #3, #1,
wedge new #2
HV = +-35V, Ibias=69uA
  
  43   Sun Oct 21 09:01:04 2012 Markus FriedlMicronOrigami_grosscalcal0208380021.10.2012 08:59:2121.10.2012 09:45:03GoodBelle Stack 4: 2 DSSD -z, Origami #3, #1,
wedge new #2
HV = +-40V, Ibias=72uA
  
  42   Sat Oct 20 19:35:30 2012 Markus FriedlMicronOrigami_grossrunrun02030000020.10.2012 19:34:1921.10.2012 08:55:28GoodBelle Stack 4: 2 DSSD -z, Origami #3, #1,
wedge new #2
HV = +-40V, Ibias=73A
  
  41   Sat Oct 20 11:40:13 2012 Markus FriedlMicronOrigami_grossrunrun01910000020.10.2012 11:38:1920.10.2012 19:20:51GoodBelle Stack 4: 2 DSSD -z, Origami #3, #1,
wedge new #2
HV = +-45V, Ibias=72A
  
  40   Sat Oct 20 10:49:03 2012 Markus FriedlMicronOrigami_grosscalcal0198380020.10.2012 10:46:3620.10.2012 11:32:57GoodBelle Stack 4: 2 DSSD -z, Origami #3, #1,
wedge new #2
HV = +-45V, Ibias=70A
  
  39   Fri Oct 19 19:25:29 2012 Markus FriedlMicronOrigami_grossrunrun01831875619.10.2012 19:23:5520.10.2012 10:27:11GoodBelle Stack 4: 2 DSSD -z, Origami #3, #1,
wedge new #2
HV = +-50V, Ibias=77A
  
  38   Fri Oct 19 00:56:16 2012 Markus FriedlMicronOrigami_grossrunrun01719789919.10.2012 00:54:2119.10.2012 14:10:02 GoodBelle Stack 4: 2 DSSD -z, Origami #3, #1,
wedge new #2
HV = +-50V, Ibias=76A
  
  37   Fri Oct 19 00:45:52 2012 Markus FriedlMicronOrigami_grossrunrun0161185519.10.2012 00:24:0519.10.2012 00:48:24Crap 
Belle Stack 4: 2 DSSD -z, Origami
#3, #1, wedge new #2
  
  36   Thu Oct 18 09:14:07 2012 Manfred ValentancommonFahrt nach Mol    Unknown Liebe Kollegen,
wir brechen. auf. Wünscht uns
Glück!
  
  35   Wed Oct 17 21:30:39 2012 Markus FriedlMicronOrigami_grosscalcal0088380017.10.2012 17:15:1317.10.2012 18:08:11GoodInternal calibration for "stealth
parasitic" mode Belle stack; taken without
beam
 currents.pngcurrents2.png 
  34   Wed Oct 17 14:06:24 2012 Markus FriedlMicronOrigami_grossStack für stealth parasitic mode    GoodDieser Stack wird jetzt quasi als Pausenkasperl
eingebaut und läuft im "stealth
parasitic" mode während der Irradiation-Woche.
 pausenfueller1.jpgpausenfueller2.jpg 
  33   Wed Oct 17 05:16:22 2012 Christian IrmlerMicronOrigami_grossrunrun0155400517.10.2012 05:10:0617.10.2012 07:27:20UnknownOrigami Stack 2: Origami #4, #3, Wedge
new1, old
HV = +-50V
 run015_temperatures.JPG 
  32   Wed Oct 17 01:21:50 2012 Marko DragicevicInfineonrunrun009150k15.10.2012 08:20:1515.10.2012 11:01:11Unknown This run was not recorded in original
sequence in the ELOG!!!
 
  
  31   Tue Oct 16 23:35:28 2012 Christian IrmlerMicronOrigami_grossrunrun014150k16.10.2012 23:32:2417.10.2012 04:59:02 UnknownSame as run011, but now with +- 50V bias
voltage.
Origami Stack 2: Origami #4, #3,
 run014_temperatures.jpg 
  30   Tue Oct 16 23:03:09 2012 Markus FriedlcommonSozialisierung    UnknownSo steuert man einen Testbeam!
 IMAG2041.jpgfondue.jpg 
  29   Tue Oct 16 22:19:21 2012 Christian IrmlerMicronOrigami_grosscalcal0078380016.10.2012 20:25:17 16.10.2012 21:12:01 UnknownOrigami Stack 2: Origami #4, #3, Wedge
new1, old
HV = +-50V, Ibias=12.3µA
  
  28   Tue Oct 16 13:59:46 2012 Christian IrmlerMicronOrigami_grossrunrun013150k16.10.2012 13:43:0516.10.2012 20:21:04UnknownOrigami Stack 2: Origami #4, #3, Wedge
new1, old
HV = +-50V
 belle_2_temperatures.jpg 
  27   Tue Oct 16 11:23:43 2012 Christian IrmlerMicronOrigami_grossrunrun01220k16.10.2012 11:16:0116.10.2012 12:27:03 UnknownOrigami Stack 2a: Origami #4, Wedge new1
reading out all 6 APV of p-side
HV = +-40V, Ibias=10.4µA
 belle_2a_temperatures.jpg 
  26   Tue Oct 16 11:07:17 2012 Christian IrmlerMicronOrigami_grosscalcal0068380016.10.2012 10:30:3416.10.2012 11:00:51UnknownOrigami Stack 2a: Origami #4, Wedge new1
reading out all 6 APV of p-side
HV = +-40V, Ibias=5.12µA
  
  25   Tue Oct 16 05:24:21 2012 Christian IrmlerMicronOrigami_grossrun ATTENTION: wrong bias voltagerun011150k16.10.2012 05:19:28 16.10.2012 09:59:24CrapATTENTION: Bias voltage was +-100 V instead
of +- 50 V
Origami Stack 2: Origami #4, #3,
  
  24   Mon Oct 15 23:26:52 2012 Marko DragicevicMicronOrigami_grossrun ATTENTION: wrong bias voltagerun010158k15.10.2012 23:10:40 16.10.2012 05:05:35CrapATTENTION: Bias voltage was +-100 V instead
of +- 50 V
Same as run009.
  
  23   Mon Oct 15 22:13:28 2012 Marko DragicevicMicronOrigami_grosscal ATTENTION: wrong bias voltage cal0058380015.10.2012 22:16:2615.10.2012 23:07:37 UnknownATTENTION: Bias voltage was +-100 V instead
of +- 50 V
Origami Stack 2: Origami #4, #3,
  
  22   Mon Oct 15 19:40:03 2012 Marko DragicevicMicronOrigami_grossrun ATTENTION: wrong bias voltagerun0093165015.10.2012 19:28:30 15.10.2012 22:08:31 CrapATTENTION! Bias voltage was +-100 V instead
of +-50 V 
Origami Stack 2: Origami #4, #3,
  
  21   Mon Oct 15 19:21:56 2012 Marko DragiceviccommonBeam settings and profile    UnknownBeam setting file:
H6A.804: FM HAD (H8=+180, H6=120@0mrad)
PARALL IN H6A; RD42
 NetBeans_IDE_3.5_15-Oct-12_19-28-32.png 
  20   Mon Oct 15 18:52:18 2012 Marko DragicevicMicronOrigami_grossStack configuration, Belle Stack 2    UnknownBelle stack 2:
Modules:

    Origami #4
    Origami
  
  19   Mon Oct 15 00:08:26 2012 Marko DragicevicInfineonrunrun00833907515.10.2012 01:49:3315.10.2012 08:04:24Unknown Infineon Stack Version
2 (no height information, BabyStrips vertical
  
  18   Sun Oct 14 23:01:11 2012 Marko DragicevicInfineoncalcal0048380014.10.2012 21:44:0014.10.2012 21:03:00UnknownInfineon Stack Version 1 (with height information,
BabyStrips horizontal Strixel vertical)
HV = 300V   I=3.1 uA
  
  17   Sun Oct 14 20:12:14 2012 Marko DragicevicInfineonrunrun007110k14.10.2012 20:07:1214.10.2012 21:04:12UnknownInfineon Stack Version 1 (with height information,
BabyStrips horizontal Strixel vertical)
HV = 300V   I=3uA
  
  16   Sun Oct 14 09:08:42 2012 Manfred ValentanMicronBabyrunrun006300k14.10.2012 09:01:15 UnknownMicron baby intermediate stack
HV = -100V   I=6.9uA
beam on
  
  15   Sun Oct 14 08:25:10 2012 Manfred ValentanMicronBabycalcal0038380014.10.2012 08:21:4614.10.2012 08:51:58UnknownMicron baby intermediate stack
HV = -100 V
I = 6.9 uA
  
  14   Sun Oct 14 02:02:39 2012 Manfred ValentanMicronBabyrunrun005300k14.10.2012 02:00:0814.10.2012 08:17:02UnknownMicron baby intermediate stack
HV = -100V   I=6.3uA
beam on
  
  13   Sun Oct 14 02:00:12 2012 Manfred ValentanMicronBabyConfiguration of intermediate stack    UnknownMicron baby stack with every other strip
connected to APV chips
n-side faces the beam, p-side not
  
  12   Sat Oct 13 23:04:22 2012 Markus FriedlMicronOrigami_grosscalcal0028380013.10.2012 23:03:1813.10.2012 22:57:48UnknownBelle stack 3 (2-DSSD, Micron new, Micron
old)
HV = +-50V   I=10.5A 
  
  11   Sat Oct 13 23:01:54 2012 Markus FriedlMicronOrigami_grossrun with Belle stack 3run00430k13.10.2012 21:41:3413.10.2012 22:57:48UnknownBelle stack 3, other position (CE)
 
Position of xy table:
  
  10   Sat Oct 13 19:04:23 2012 Markus FriedlMicronOrigami_grossCO2 cooling    UnknownWir haben ja schon seit langem vermutet,
dass man mit reiner Gasphase nicht kühlen
kann. Jetzt erbringen wir den experimentellen
  
  9   Sat Oct 13 19:04:02 2012 Manfred ValentanMicronOrigami_grossrun with Belle stack 3run00330k13.10.2012 19:02:31 Unknown Belle stack 3: 2DSSD-Origami, Wedge_New_1,
Wedge_old
HV = +- 50V
  
  8   Sat Oct 13 14:44:47 2012 Manfred ValentanMicronOrigami_grossStack configuration, Belle Stack 3    UnknownModule in Beamrichtung:
2-DSSD Origami  -z
2-DSSD Origami ce
  
  7   Sat Oct 13 06:55:47 2012 Manfred ValentanMicronBabyrunrun00223401913.10.2012 06:50:0013.10.2012 13:50:40UnknownMicron baby stack
HV = -100V   I=5.4uA
beam on
  
  6   Fri Oct 12 23:52:57 2012 Markus FriedlcommonSozialisierung    UnknownProst, Bergi!
(Das ist nur ein Test, ob du wirklich
all die Elog-Emails liest.)
  
  5   Fri Oct 12 23:51:35 2012 Markus FriedlcommonZimmernummer & Telefonnummern    Unknown2nd week:
Markus: 38 - 420   (phone: 70
420)
  
  4   Fri Oct 12 23:10:14 2012 Christian IrmlerMicronBabyrunrun00133300012.10.2012 23:05:1913.10.2012 06:29:00GoodMicron baby stack
HV = -100V   I=5.8uA
beam on
  
  3   Fri Oct 12 22:00:52 2012 Christian IrmlerMicronBabycalcal0018380012.10.2012 21:16:3312.10.2012 21:59:02Good12.10.2012  21:16:33  event=0 
Disk space: Needed=0.00 GB, Available=206.59
GB, Total=931.51 GB
  
  2   Fri Oct 12 19:42:36 2012 Christian IrmlerMicronBabyConfiguration of normal stack    UnknownMicron baby stack with all strips connected
to APV chips
n-side faces the beam, p-side not
 micronbaby_stack_geometry.jpg 
  1   Fri Oct 12 15:04:55 2012 Marko DragiceviccommonNetwork configuration    UnknownRouter:
IP 137.138.113.230
Hostname ROUTERHEPHY.cern.ch
  
ELOG V3.1.5-fc6679b