Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS October 2012 and Irradiation Mol  Not logged in ELOG logo
Message ID: 9     Entry time: Sat Oct 13 19:04:02 2012
Author: Manfred Valentan 
Project: MicronOrigami_gross 
Subject: run with Belle stack 3 
Run Number: run003 
Events: 30k 
StartTime: 13.10.2012 19:02:31 
EndTime:  
Data: Unknown 

 Belle stack 3: 2DSSD-Origami, Wedge_New_1, Wedge_old

HV = +- 50V
I_ges = 11.6 µA

Position of xy table:
x = 49, y = -1

Temperatures at start of run:

Measurement on cooling pipe:
Origami IN: -15,5 degC
Origami OUT = Wedge_New_1 IN: -5,5 degC
Micron_New_1 OUT = Wedge_Old IN: +9,0 degC
Micron_Old OUT: +8.2 degC

Measurement on cooling block
Wedge_New_1: +14.6 degC
Wedge_Old: +18.7 degC

 

ELOG V3.1.5-fc6679b