Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS October 2012 and Irradiation Mol  Not logged in ELOG logo
Message ID: 31     Entry time: Tue Oct 16 23:35:28 2012
Author: Christian Irmler 
Project: MicronOrigami_gross 
Subject: run 
Run Number: run014 
Events: 150k 
StartTime: 16.10.2012 23:32:24 
EndTime: 17.10.2012 04:59:02  
Data: Unknown 

Same as run011, but now with +- 50V bias voltage.

Origami Stack 2: Origami #4, #3, Wedge new1, old
HV = +-10V

Ibias=4.83µA
 

beam position:
vertical: between APV 1&2 (of 6)
horizontal: centered on APV#1 ->  right side of sensor -> small side of wedge sensors

Position of xy table:
x = 23, y = -31

Temperatur sensors:

  • T11: Origami #4 in
  • T12: Origami #4 out
  • T13: Origami #3 in (wrong values!)
  • T14: Origami #3 out
  • T15: Wedge new 1 out
  • T16: Wedge old out
  • T17: Wedge new 1 cooling block
  • T18: Wedge old cooling block

 

Attachment 1: run014_temperatures.jpg  60 kB  | Hide | Hide all
run014_temperatures.jpg
ELOG V3.1.5-fc6679b