Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS October 2012 and Irradiation Mol  Not logged in ELOG logo
Message ID: 68     Entry time: Sun Oct 28 16:22:35 2012
Author: Christian Irmler 
Project: MicronBaby 
Subject: run 
Run Number: run034 
Events: 101864 
StartTime: 28.10.2012 16:12:24  
EndTime: 28.10.2012 18:34:24 
Data: Good 

Micron Baby stack 2 after irradiation (intermediate strips)
HV = -100 V
I = 36.3 uA

Position APV0 of all sensors

X-Y Table coordinates:
X=0 / Y=-1  (afterwards: nulled)

PC power cut after ~100k events

ELOG V3.1.5-fc6679b