Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS October 2012 and Irradiation Mol  Not logged in ELOG logo
Message ID: 77     Entry time: Tue Oct 30 17:24:01 2012
Author: Markus Friedl 
Project: MicronOrigami_gross 
Subject: cal 
Run Number: cal040 
Events: 83800 
StartTime: 30.10.2012 17:20:28  
EndTime: 30.10.2012 17:54:09 
Data: Unknown 

Cooling for 2DSSD established after some struggle.

2DSSD fully read out with cooling
HV= +40 V -40 V    I = 2 uA
Beam position: none

 

Positions of thermal sensors:

11   Kapillare Anfang

12   Kapillare Ende

13   ---

14   unmittelbar nach Kapillare

15   Origami in

16   Origami out

17   Origami -z

18   Origami CE

 

Strip order:

n-Seite: rechts (Salev) nach links (Jura)

p-Seite: oben nach unten

 

APV chips with lower noise:

                          -z                                   ce
p-side             #5                                #10 (= pos 4)
n-side             #13 (= pos1)             #19 (= pos 3)

ELOG V3.1.5-fc6679b