Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS October 2012 and Irradiation Mol  Not logged in ELOG logo
Message ID: 13     Entry time: Sun Oct 14 02:00:12 2012
Author: Manfred Valentan 
Project: MicronBaby 
Subject: Configuration of intermediate stack 
Run Number:  
Events:  
StartTime:  
EndTime:  
Data: Unknown 

Micron baby stack with every other strip connected to APV chips

n-side faces the beam, p-side not read out.

Channels counting from bottom to top

Modules as seen by the beam:

Module name                      z-position [mm]                        Sensor ID
COMM-I-1                             0.0                                               B2Micron_2965_16_baby2
COMM-I-2                             26.0                                             B2Micron_2965_17_baby2
SPRAY-I-1                            50.4                                             B2Micron_2825_15_baby2  (known issue: I2C-error of APV3)
SPRAY-I-2                            76.2                                             B2Micron_2825_15_baby3
COMB-I-1                             101.8                                           B2Micron_2965_16_baby4
COMB-I-2                             136.8                                           B2Micron_2965_17_baby4
ATOLL-I-1                            161.0                                           B2Micron_2965_10_baby3
ATOLL-I-2                            185.3                                           B2Micron_2965_13_baby3

ELOG V3.1.5-fc6679b