Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS October 2012 and Irradiation Mol  Not logged in ELOG logo
Message ID: 7     Entry time: Sat Oct 13 06:55:47 2012
Author: Manfred Valentan 
Project: MicronBaby 
Subject: run 
Run Number: run002 
Events: 234019 
StartTime: 13.10.2012 06:50:00 
EndTime: 13.10.2012 13:50:40 
Data: Unknown 

Micron baby stack
HV = -100V   I=5.4uA
beam on

 

Final DESY position (center of vertical beam profile)

Module position: 0 / -13.0 -- hitting the lower half of the sensor (centered on even APVs)

Run interrupted due to RF transmitter fault.

ELOG V3.1.5-fc6679b