Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS October 2012 and Irradiation Mol  Not logged in ELOG logo
Message ID: 28     Entry time: Tue Oct 16 13:59:46 2012
Author: Christian Irmler 
Project: MicronOrigami_gross 
Subject: run 
Run Number: run013 
Events: 150k 
StartTime: 16.10.2012 13:43:05 
EndTime: 16.10.2012 20:21:04 
Data: Unknown 

Origami Stack 2: Origami #4, #3, Wedge new1, old

HV = +-50V

Ibias=5.2µA
 

beam position:
vertical: between APV 1&2 (of 6)
horizontal: centered on APV#3 ->  left side of sensor -> wide side of wedge sensors

Position of xy table:
x = 83, y = -31

 

Temperatur sensors:

  • T11: Origami #4 in
  • T12: Origami #4 out
  • T13: Origami #3 in (wrong values!)
  • T14: Origami #3 out
  • T15: Wedge new 1 out
  • T16: Wedge old out
  • T17: Wedge new 1 cooling block
  • T18: Wedge old cooling block

 

 

Attachment 1: belle_2_temperatures.jpg  60 kB  | Hide | Hide all
belle_2_temperatures.jpg
ELOG V3.1.5-fc6679b