Message ID: 32     Entry time: Wed Oct 17 01:21:50 2012
Author: Marko Dragicevic 
Project: Infineon 
Subject: run 
Run Number: run009 
Events: 150k 
StartTime: 15.10.2012 08:20:15 
EndTime: 15.10.2012 11:01:11 
Data: Unknown 

 This run was not recorded in original sequence in the ELOG!!!

 

 Infineon Stack Version 2 (no height information, BabyStrips vertical Strixel vertical)

HV = 300V   I=4uA
beam on

 

Final DESY position (center of vertical beam profile)

Module position: 15 / 3 -- hitting lower part of baby and bottom strixels

07_baby 0,0 APV1 lower, APV2 upper
Strixel 2 20,8 Hybrid1/APV1 top-left, Hybrid1/APV2 top right, Hybrid2/APV1 bottom left, Hybrid2/APV2 bottom right 
Strixel 1 39,4 Hybrid1/APV1 top-left, Hybrid1/APV2 top right, Hybrid2/APV1 bottom left, Hybrid2/APV2 bottom right 
12_baby 60,6 APV1 lower, APV2 upper

 

 