Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS October 2012 and Irradiation Mol  Not logged in ELOG logo
Message ID: 32     Entry time: Wed Oct 17 01:21:50 2012
Author: Marko Dragicevic 
Project: Infineon 
Subject: run 
Run Number: run009 
Events: 150k 
StartTime: 15.10.2012 08:20:15 
EndTime: 15.10.2012 11:01:11 
Data: Unknown 

 This run was not recorded in original sequence in the ELOG!!!

 

 Infineon Stack Version 2 (no height information, BabyStrips vertical Strixel vertical)

HV = 300V   I=4uA
beam on

 

Final DESY position (center of vertical beam profile)

Module position: 15 / 3 -- hitting lower part of baby and bottom strixels

07_baby 0,0 APV1 lower, APV2 upper
Strixel 2 20,8 Hybrid1/APV1 top-left, Hybrid1/APV2 top right, Hybrid2/APV1 bottom left, Hybrid2/APV2 bottom right 
Strixel 1 39,4 Hybrid1/APV1 top-left, Hybrid1/APV2 top right, Hybrid2/APV1 bottom left, Hybrid2/APV2 bottom right 
12_baby 60,6 APV1 lower, APV2 upper

 

 
ELOG V3.1.5-fc6679b