Entry  Tue Oct 23 23:12:03 2012, Thomas Bergauer, MicronOrigami_gross, run, run027, 220847, 23.10.2012 23:10:14, 24.10.2012 08:19:51, Unknown 
 Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-5V, Ibias=23.5uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew
#3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1
 
SPS Status during whole run: Still problems with North
Entry  Wed Oct 24 08:25:04 2012, Thomas Bergauer, MicronOrigami_gross, cal, cal027, 83800, 24.10.2012 08:22:25, 24.10.2012 09:10:19, Unknown 
 Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-5V, Ibias=23.5uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew
#3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1
Entry  Wed Oct 24 09:51:41 2012, Thomas Bergauer, MicronOrigami_gross, cal, cal028, 83800, 24.10.2012 09:50:53, 24.10.2012 10:39:43, Unknown 
 Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-2.5V, Ibias=14.5uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3,
wedgenew #3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1
Entry  Wed Oct 24 17:24:40 2012, Thomas Bergauer, MicronOrigami_gross, run ohne Strom ;-(, run028, , , , Unknown 
 
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-2.5V, Ibias=14.5uA
Entry  Fri Oct 12 23:51:35 2012, Markus Friedl, common, Zimmernummer & Telefonnummern, , , , , Unknown 
2nd week:
Markus: 38 - 420   (phone: 70 420)
Thomas: 38 - 431   (phone: 70 431)
Entry  Fri Oct 12 23:52:57 2012, Markus Friedl, common, Sozialisierung, , , , , Unknown 
Prost, Bergi!
(Das ist nur ein Test, ob du wirklich all die Elog-Emails liest.)
Entry  Sat Oct 13 19:04:23 2012, Markus Friedl, MicronOrigami_gross, CO2 cooling, , , , , Unknown 
Wir haben ja schon seit langem vermutet, dass man mit reiner Gasphase nicht kühlen kann. Jetzt erbringen wir den experimentellen Beweis dafür.
Expandierendes Gas kühlt zwar auch, aber nicht so tief runter und vor allem sind beträchtliche Temperaturdifferenzen zwischen den einzelnen
Modulen zu beobachten. Das erste Origami bekommt etwa -13°C aber bis zum letzten Micron sind wir auf Raumtemperatur.
Entry  Sat Oct 13 23:01:54 2012, Markus Friedl, MicronOrigami_gross, run with Belle stack 3, run004, 30k, 13.10.2012 21:41:34, 13.10.2012 22:57:48, Unknown 
Belle stack 3, other position (CE)
 
Position of xy table:
Entry  Sat Oct 13 23:04:22 2012, Markus Friedl, MicronOrigami_gross, cal, cal002, 83800, 13.10.2012 23:03:18, 13.10.2012 22:57:48, Unknown 
Belle stack 3 (2-DSSD, Micron new, Micron old)
HV = +-50V   I=10.5A 
beam on CE sensor
Entry  Tue Oct 16 23:03:09 2012, Markus Friedl, common, Sozialisierung, , , , , Unknown IMAG2041.jpgfondue.jpg
So steuert man einen Testbeam!
Entry  Wed Oct 17 14:06:24 2012, Markus Friedl, MicronOrigami_gross, Stack für stealth parasitic mode, , , , , Good pausenfueller1.jpgpausenfueller2.jpg
Dieser Stack wird jetzt quasi als Pausenkasperl eingebaut und läuft im "stealth parasitic" mode während der Irradiation-Woche. Gut,
dass wir alles auch von Wien aus fernsteuern können :-)
Entry  Wed Oct 17 21:30:39 2012, Markus Friedl, MicronOrigami_gross, cal, cal008, 83800, 17.10.2012 17:15:13, 17.10.2012 18:08:11, Good currents.pngcurrents2.png
Internal calibration for "stealth parasitic" mode Belle stack; taken without beam
 
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
Entry  Fri Oct 19 00:45:52 2012, Markus Friedl, MicronOrigami_gross, run, run016, 11855, 19.10.2012 00:24:05, 19.10.2012 00:48:24, Crap 
 
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-50V, Ibias=77A
Entry  Fri Oct 19 00:56:16 2012, Markus Friedl, MicronOrigami_gross, run, run017, 197899, 19.10.2012 00:54:21, 19.10.2012 14:10:02 , Good 
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-50V, Ibias=76A
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
Entry  Fri Oct 19 19:25:29 2012, Markus Friedl, MicronOrigami_gross, run, run018, 318756, 19.10.2012 19:23:55, 20.10.2012 10:27:11, Good 
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-50V, Ibias=77A
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
Entry  Sat Oct 20 10:49:03 2012, Markus Friedl, MicronOrigami_gross, cal, cal019, 83800, 20.10.2012 10:46:36, 20.10.2012 11:32:57, Good 
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-45V, Ibias=70A
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
Entry  Sat Oct 20 11:40:13 2012, Markus Friedl, MicronOrigami_gross, run, run019, 100000, 20.10.2012 11:38:19, 20.10.2012 19:20:51, Good 
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-45V, Ibias=72A
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
Entry  Sat Oct 20 19:35:30 2012, Markus Friedl, MicronOrigami_gross, run, run020, 300000, 20.10.2012 19:34:19, 21.10.2012 08:55:28, Good 
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-40V, Ibias=73A
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
Entry  Sun Oct 21 09:01:04 2012, Markus Friedl, MicronOrigami_gross, cal, cal020, 83800, 21.10.2012 08:59:21, 21.10.2012 09:45:03, Good 
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-40V, Ibias=72uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
Entry  Sun Oct 21 09:50:00 2012, Markus Friedl, MicronOrigami_gross, cal, cal021, 83800, 21.10.2012 09:50:07 , 21.10.2012 10:35:40, Good 
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-35V, Ibias=69uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
Entry  Sun Oct 21 10:39:15 2012, Markus Friedl, MicronOrigami_gross, run, run021, 100000, 21.10.2012 10:37:26, 21.10.2012 15:04:49, Good 
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-35V, Ibias=69uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
Entry  Sun Oct 21 15:15:45 2012, Markus Friedl, MicronOrigami_gross, cal, cal022, 83800, 21.10.2012 15:13:47, 21.10.2012 16:00:25, Good 
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-30V, Ibias=70uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
Entry  Sun Oct 21 16:04:06 2012, Markus Friedl, MicronOrigami_gross, run, run022, 151282, 21.10.2012 18:16:53, 22.10.2012 00:04:42, Good 
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-30V, Ibias=70uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
Entry  Mon Oct 22 00:08:39 2012, Markus Friedl, MicronOrigami_gross, cal, cal023, 83800, 22.10.2012 00:07:34, 22.10.2012 00:53:02, Good 
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-25V, Ibias=65uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
Entry  Mon Oct 22 00:57:05 2012, Markus Friedl, MicronOrigami_gross, run, run023, 176629, 22.10.2012 00:55:59, 22.10.2012 10:04:38, Good 
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-25V, Ibias=65uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
Entry  Mon Oct 22 10:10:16 2012, Markus Friedl, MicronOrigami_gross, cal, cal024, 83800, 22.10.2012 10:08:53, 22.10.2012 10:54:18, Good 
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-20V, Ibias=53uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
Entry  Mon Oct 22 19:19:53 2012, Markus Friedl, MicronOrigami_gross, run, run024, 260000, 22.10.2012 19:18:16, 23.10.2012 08:17:20 , Good 
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-20V, Ibias=57uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
Entry  Tue Oct 23 08:22:42 2012, Markus Friedl, MicronOrigami_gross, run, run025, 100000, 23.10.2012 08:21:37, 23.10.2012 13:47:09, Good 
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-15V, Ibias=47uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
Entry  Tue Oct 23 13:50:44 2012, Markus Friedl, MicronOrigami_gross, cal, cal025, 83800, 23.10.2012 13:47:09 , 23.10.2012 14:35:05, Good 
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-15V, Ibias=48uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
Entry  Tue Oct 23 15:55:58 2012, Markus Friedl, MicronOrigami_gross, cal, cal026, 83800, 23.10.2012 14:56:47, 23.10.2012 15:42:17 , Good 
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-10V, Ibias=36uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
Entry  Tue Oct 23 16:06:09 2012, Markus Friedl, MicronOrigami_gross, run, run026, 102124, 23.10.2012 16:04:47, 23.10.2012 23:04:56, Unknown 
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-10V, Ibias=36uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
Entry  Sat Oct 27 19:36:24 2012, Markus Friedl, MicronOrigami_gross, cal, cal031, 83800, 27.10.2012 19:59:50, 27.10.2012 20:44:38, Good 
Belle stack 2 after irradiation
HV = +50V -50V
I = 112 µA
Entry  Sat Oct 27 21:49:08 2012, Markus Friedl, MicronOrigami_gross, run, run031, 150k, 27.10.2012 21:42:46, 28.10.2012 02:35:55 (+1h due to winter time), Good 
Belle stack 2 after gamma irrdiation
HV = +50V -50 V
I = 102 uA
Entry  Sun Oct 28 02:51:49 2012, Markus Friedl, MicronOrigami_gross, run, run032, 150k, 28.10.2012 02:47:24, 28.10.2012 08:31:19 , Good 
Belle stack 2 after gamma irradiation
HV = +50V -50V
I = 101 uA
Entry  Sun Oct 28 15:46:07 2012, Markus Friedl, MicronBaby, cal, cal034, 83800, 28.10.2012 15:19:10, 28.10.2012 15:40:47, Good 
Micron Baby stack 2 after irradiation (intermediate strips)
HV = -100 V
I = 33 uA
Entry  Sun Oct 28 20:07:28 2012, Markus Friedl, MicronBaby, run, run035, 304110, 28.10.2012 20:01:48, 29.10.2012 03:50:44, Good 
Micron Baby stack 2 after irradiation (intermediate strips)
HV = -100 V
I = 39 uA
Entry  Mon Oct 29 11:36:40 2012, Markus Friedl, Infineon, cal, cal037, 83800, 29.10.2012 11:35:12, 29.10.2012 11:58:02 , Good 
Infineon stack Version 2 after irradiation
HV = +300 V
I = 137 A
Entry  Mon Oct 29 12:24:41 2012, Markus Friedl, Infineon, run, run037, 301382, 29.10.2012 12:22:22, 29.10.2012 21:05:57, Good 
Infineon stack Version 2 after irradiation
HV = +300 V
I = 162 A
Entry  Mon Oct 29 22:36:52 2012, Markus Friedl, HPK_baby, cal, cal038, 83800, 29.10.2012 22:17:34, 29.10.2012 22:47:47, Good 
HPK baby stack after irradiation with partial cooling (HPK neutron & HPK neutron/gamma)
HV = +75 Vm  -75V
I =  226A
Entry  Mon Oct 29 23:13:52 2012, Markus Friedl, HPK_baby, run, run038, 476500, 29.10.2012 23:13:05, 30.10.2012 10:22:54, Unknown 
HPK baby stack after irradiation with partial cooling (HPK neutron & HPK neutron/gamma)
HV = +75 V  -75V
I =  176A
Entry  Tue Oct 30 10:37:19 2012, Markus Friedl, HPK_baby, cal, cal039, 83800, 30.10.2012 10:35:35 , 30.10.2012 11:02:06 , Good 
Turned off cooling, now taking warm data
 
HPK baby stack after irradiation - no cooling
Entry  Tue Oct 30 11:05:32 2012, Markus Friedl, HPK_baby, run, run039, 150k, 30.10.2012 11:03:19, 30.10.2012 14:57:57, Unknown 
HPK baby stack after irradiation - no cooling
I =  420A and growing (warming up)
positioned centered on p and n
Entry  Tue Oct 30 17:24:01 2012, Markus Friedl, MicronOrigami_gross, cal, cal040, 83800, 30.10.2012 17:20:28 , 30.10.2012 17:54:09, Unknown 
Cooling for 2DSSD established after some struggle.
2DSSD fully read out with cooling
HV= +40 V -40 V    I = 2 uA
Entry  Tue Oct 30 22:15:41 2012, Markus Friedl, MicronOrigami_gross, run, run041, 100k, 30.10.2012 22:09:13, , Unknown temperatures_run041.jpg
Cooling for 2DSSD established after some struggle.
2DSSD fully read out with cooling
HV= +40 V -40 V    I =  1.84 uA
Entry  Fri Oct 12 15:04:55 2012, Marko Dragicevic, common, Network configuration, , , , , Unknown 
Router:
IP 137.138.113.230
Hostname ROUTERHEPHY.cern.ch
Entry  Sun Oct 14 20:12:14 2012, Marko Dragicevic, Infineon, run, run007, 110k, 14.10.2012 20:07:12, 14.10.2012 21:04:12, Unknown 
Infineon Stack Version 1 (with height information, BabyStrips horizontal Strixel vertical)
HV = 300V   I=3uA
beam on
Entry  Sun Oct 14 23:01:11 2012, Marko Dragicevic, Infineon, cal, cal004, 83800, 14.10.2012 21:44:00, 14.10.2012 21:03:00, Unknown 
Infineon Stack Version 1 (with height information, BabyStrips horizontal Strixel vertical)
HV = 300V   I=3.1 uA
Entry  Mon Oct 15 00:08:26 2012, Marko Dragicevic, Infineon, run, run008, 339075, 15.10.2012 01:49:33, 15.10.2012 08:04:24, Unknown 
 Infineon Stack Version 2 (no height information, BabyStrips vertical Strixel vertical)
HV = 300V   I=4uA
beam on
Entry  Mon Oct 15 18:52:18 2012, Marko Dragicevic, MicronOrigami_gross, Stack configuration, Belle Stack 2, , , , , Unknown 
Belle stack 2:
Modules:

    Origami #4
    Origami #3
    Wedge new 1
    Wedge old

n-Seite: Beam abgewand
Entry  Mon Oct 15 19:21:56 2012, Marko Dragicevic, common, Beam settings and profile, , , , , Unknown NetBeans_IDE_3.5_15-Oct-12_19-28-32.png
Beam setting file:
H6A.804: FM HAD (H8=+180, H6=120@0mrad) PARALL IN H6A; RD42
Kommentar (Marko):
Entry  Mon Oct 15 19:40:03 2012, Marko Dragicevic, MicronOrigami_gross, run ATTENTION: wrong bias voltage, run009, 31650, 15.10.2012 19:28:30 , 15.10.2012 22:08:31 , Crap 
ATTENTION! Bias voltage was +-100 V instead of +-50 V 
Origami Stack 2: Origami #4, #3, Wedge new1, old
HV = +-100V
Entry  Mon Oct 15 22:13:28 2012, Marko Dragicevic, MicronOrigami_gross, cal ATTENTION: wrong bias voltage , cal005, 83800, 15.10.2012 22:16:26, 15.10.2012 23:07:37 , Unknown 
ATTENTION: Bias voltage was +-100 V instead of +- 50 V
Origami Stack 2: Origami #4, #3, Wedge new1, old
HV = +-100V
Entry  Mon Oct 15 23:26:52 2012, Marko Dragicevic, MicronOrigami_gross, run ATTENTION: wrong bias voltage, run010, 158k, 15.10.2012 23:10:40 , 16.10.2012 05:05:35, Crap 
ATTENTION: Bias voltage was +-100 V instead of +- 50 V
Same as run009.
Origami Stack 2: Origami #4, #3, Wedge new1, old
Entry  Wed Oct 17 01:21:50 2012, Marko Dragicevic, Infineon, run, run009, 150k, 15.10.2012 08:20:15, 15.10.2012 11:01:11, Unknown 
 This run was not recorded in original sequence in the ELOG!!!
 

    
        
Entry  Sat Oct 13 06:55:47 2012, Manfred Valentan, MicronBaby, run, run002, 234019, 13.10.2012 06:50:00, 13.10.2012 13:50:40, Unknown 
Micron baby stack
HV = -100V   I=5.4uA
beam on
Entry  Sat Oct 13 14:44:47 2012, Manfred Valentan, MicronOrigami_gross, Stack configuration, Belle Stack 3, , , , , Unknown 
Module in Beamrichtung:
2-DSSD Origami  -z
2-DSSD Origami ce
Entry  Sat Oct 13 19:04:02 2012, Manfred Valentan, MicronOrigami_gross, run with Belle stack 3, run003, 30k, 13.10.2012 19:02:31, , Unknown 
 Belle stack 3: 2DSSD-Origami, Wedge_New_1, Wedge_old
HV = +- 50V
I_ges = 11.6 µA
Entry  Sun Oct 14 02:00:12 2012, Manfred Valentan, MicronBaby, Configuration of intermediate stack, , , , , Unknown 
Micron baby stack with every other strip connected to APV chips
n-side faces the beam, p-side not read out.
Channels counting from bottom to top
Entry  Sun Oct 14 02:02:39 2012, Manfred Valentan, MicronBaby, run, run005, 300k, 14.10.2012 02:00:08, 14.10.2012 08:17:02, Unknown 
Micron baby intermediate stack
HV = -100V   I=6.3uA
beam on
Entry  Sun Oct 14 08:25:10 2012, Manfred Valentan, MicronBaby, cal, cal003, 83800, 14.10.2012 08:21:46, 14.10.2012 08:51:58, Unknown 
Micron baby intermediate stack
HV = -100 V
I = 6.9 uA
Entry  Sun Oct 14 09:08:42 2012, Manfred Valentan, MicronBaby, run, run006, 300k, 14.10.2012 09:01:15, , Unknown 
Micron baby intermediate stack
HV = -100V   I=6.9uA
beam on
Entry  Thu Oct 18 09:14:07 2012, Manfred Valentan, common, Fahrt nach Mol, , , , , Unknown 
 Liebe Kollegen,
wir brechen. auf. Wünscht uns Glück!
Entry  Sat Oct 27 07:51:49 2012, Manfred Valentan, MicronBaby, run, run030, 376678, 27.10.2012 07:49:09, 27.10.2012 17:32:07, Good 
After irradiation
xy-table: x=319.4, y=87.6
beam hits APV1
Entry  Mon Oct 29 04:02:16 2012, Manfred Valentan, MicronBaby, run, run036, 296294, 29.10.2012 03:53:33, 29.10.2012 11:05:35, Unknown 
Micron Baby stack 2 after irradiation (intermediate strips)
HV = -100 V
I = 36 uA
Entry  Fri Oct 12 19:42:36 2012, Christian Irmler, MicronBaby, Configuration of normal stack, , , , , Unknown micronbaby_stack_geometry.jpg
Micron baby stack with all strips connected to APV chips
n-side faces the beam, p-side not read out.
Channels counting from bottom to top
Entry  Fri Oct 12 22:00:52 2012, Christian Irmler, MicronBaby, cal, cal001, 83800, 12.10.2012 21:16:33, 12.10.2012 21:59:02, Good 
12.10.2012  21:16:33  event=0  Disk space: Needed=0.00 GB, Available=206.59 GB, Total=931.51 GB
12.10.2012  21:16:33  event=0  DAQ start (mode: Calibration Scan)
12.10.2012  21:16:33  event=0  Init NECO... done
Entry  Fri Oct 12 23:10:14 2012, Christian Irmler, MicronBaby, run, run001, 333000, 12.10.2012 23:05:19, 13.10.2012 06:29:00, Good 
Micron baby stack
HV = -100V   I=5.8uA
beam on
Entry  Tue Oct 16 05:24:21 2012, Christian Irmler, MicronOrigami_gross, run ATTENTION: wrong bias voltage, run011, 150k, 16.10.2012 05:19:28 , 16.10.2012 09:59:24, Crap 
ATTENTION: Bias voltage was +-100 V instead of +- 50 V
Origami Stack 2: Origami #4, #3, Wedge new1, old
HV = +-100V
Entry  Tue Oct 16 11:07:17 2012, Christian Irmler, MicronOrigami_gross, cal, cal006, 83800, 16.10.2012 10:30:34, 16.10.2012 11:00:51, Unknown 
Origami Stack 2a: Origami #4, Wedge new1
reading out all 6 APV of p-side
HV = +-40V, Ibias=5.12µA
Entry  Tue Oct 16 11:23:43 2012, Christian Irmler, MicronOrigami_gross, run, run012, 20k, 16.10.2012 11:16:01, 16.10.2012 12:27:03 , Unknown belle_2a_temperatures.jpg
Origami Stack 2a: Origami #4, Wedge new1
reading out all 6 APV of p-side
HV = +-40V, Ibias=10.4µA
Entry  Tue Oct 16 13:59:46 2012, Christian Irmler, MicronOrigami_gross, run, run013, 150k, 16.10.2012 13:43:05, 16.10.2012 20:21:04, Unknown belle_2_temperatures.jpg
Origami Stack 2: Origami #4, #3, Wedge new1, old
HV = +-50V
Ibias=5.2µA
Entry  Tue Oct 16 22:19:21 2012, Christian Irmler, MicronOrigami_gross, cal, cal007, 83800, 16.10.2012 20:25:17 , 16.10.2012 21:12:01 , Unknown 
Origami Stack 2: Origami #4, #3, Wedge new1, old
HV = +-50V, Ibias=12.3µA
Position: verticallbtween APV 1&2 of 6,  left side of sensor, 
Entry  Tue Oct 16 23:35:28 2012, Christian Irmler, MicronOrigami_gross, run, run014, 150k, 16.10.2012 23:32:24, 17.10.2012 04:59:02 , Unknown run014_temperatures.jpg
Same as run011, but now with +- 50V bias voltage.
Origami Stack 2: Origami #4, #3, Wedge new1, old
HV = +-10V
Entry  Wed Oct 17 05:16:22 2012, Christian Irmler, MicronOrigami_gross, run, run015, 54005, 17.10.2012 05:10:06, 17.10.2012 07:27:20, Unknown run015_temperatures.JPG
Origami Stack 2: Origami #4, #3, Wedge new1, old
HV = +-50V
Ibias=4.43µA
Entry  Sat Oct 27 00:43:55 2012, Christian Irmler, MicronBaby, cal, cal029, 83800, 27.10.2012 00:10:15, 27.10.2012 00:36:55, Good 
After irradiation
 
Micron baby stack after gamma irrdiation
Entry  Sat Oct 27 01:13:47 2012, Christian Irmler, MicronBaby, run, run029, 307k, 27.10.2012 01:02:49, 27.10.2012 07:36:34, Good 
After irradiation
xy-table: x=319.4, y=74.6
beam hits APV0
Entry  Sun Oct 28 08:37:53 2012, Christian Irmler, MicronOrigami_gross, run, run033, 66937, 28.10.2012 08:33:42, 28.10.2012 14:10:43 , Unknown temp_run33.JPGtemp_run33_2.JPG
Belle stack 2 after gamma irradiation
HV = +50V -50V
I = 101 uA
Entry  Sun Oct 28 16:22:35 2012, Christian Irmler, MicronBaby, run, run034, 101864, 28.10.2012 16:12:24 , 28.10.2012 18:34:24, Good 
Micron Baby stack 2 after irradiation (intermediate strips)
HV = -100 V
I = 36.3 uA
Entry  Tue Oct 30 18:35:51 2012, Christian Irmler, MicronOrigami_gross, run, run040, 100k, 30.10.2012 18:23:21, 30.10.2012 21:55:53 , Unknown temperatures_run040.jpg
Cooling for 2DSSD established after some struggle.
2DSSD fully read out with cooling
HV= +40 V -40 V    I = 2.1 uA
Entry  Wed Oct 31 15:54:59 2012, Christian Irmler, common, Ethernetkabel zu H6A, , , , , Unknown 2012-10-31_15.47.42.jpg2012-10-31_12.28.32.jpg
Ethernetkabel HNA447 -> H6A:
Das obere Ende im Counting Hut liegt im Zwischenboden unterhalb der orangenen Steckdose beim Eingang mit dem elektronischen Zahlenschloß.
Das untere Ende in der Zone hängt aufgerollt an einem Pfeiler der Kabeltasse, unweit der Stelle an der das Kabel von oben hinunter gelassen
ELOG V3.1.5-fc6679b