  HEPHY logbook for testbeam at SPS October 2012 and Irradiation Mol, all entries  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Datedown Author Project Subject Run Number Events StartTime EndTime Data Text Attachments
  80   Wed Oct 31 15:54:59 2012 Christian IrmlercommonEthernetkabel zu H6A    UnknownEthernetkabel HNA447 -> H6A:
Das obere Ende im Counting Hut liegt
im Zwischenboden unterhalb der orangenen
 2012-10-31_15.47.42.jpg2012-10-31_12.28.32.jpg 
  79   Tue Oct 30 22:15:41 2012 Markus FriedlMicronOrigami_grossrunrun041100k30.10.2012 22:09:13 UnknownCooling for 2DSSD established after some
struggle.
2DSSD fully read out with cooling
 temperatures_run041.jpg 
  78   Tue Oct 30 18:35:51 2012 Christian IrmlerMicronOrigami_grossrunrun040100k30.10.2012 18:23:2130.10.2012 21:55:53 UnknownCooling for 2DSSD established after some
struggle.
2DSSD fully read out with cooling
 temperatures_run040.jpg 
  77   Tue Oct 30 17:24:01 2012 Markus FriedlMicronOrigami_grosscalcal0408380030.10.2012 17:20:28 30.10.2012 17:54:09UnknownCooling for 2DSSD established after some
struggle.
2DSSD fully read out with cooling
  
  76   Tue Oct 30 11:05:32 2012 Markus FriedlHPK_babyrunrun039150k30.10.2012 11:03:1930.10.2012 14:57:57UnknownHPK baby stack after irradiation - no cooling
I =  420A and growing (warming
up)
  
  75   Tue Oct 30 10:37:19 2012 Markus FriedlHPK_babycalcal0398380030.10.2012 10:35:35 30.10.2012 11:02:06 GoodTurned off cooling, now taking warm data
 
HPK baby stack after irradiation
  
  74   Mon Oct 29 23:13:52 2012 Markus FriedlHPK_babyrunrun03847650029.10.2012 23:13:0530.10.2012 10:22:54UnknownHPK baby stack after irradiation with partial
cooling (HPK neutron & HPK neutron/gamma)
HV = +75 V  -75V
  
  73   Mon Oct 29 22:36:52 2012 Markus FriedlHPK_babycalcal0388380029.10.2012 22:17:3429.10.2012 22:47:47GoodHPK baby stack after irradiation with partial
cooling (HPK neutron & HPK neutron/gamma)
HV = +75 Vm  -75V
  
  72   Mon Oct 29 12:24:41 2012 Markus FriedlInfineonrunrun03730138229.10.2012 12:22:2229.10.2012 21:05:57GoodInfineon stack Version 2 after irradiation
HV = +300 V
I = 162 A
  
  71   Mon Oct 29 11:36:40 2012 Markus FriedlInfineoncalcal0378380029.10.2012 11:35:1229.10.2012 11:58:02 GoodInfineon stack Version 2 after irradiation
HV = +300 V
I = 137 A
  
  70   Mon Oct 29 04:02:16 2012 Manfred ValentanMicronBabyrunrun03629629429.10.2012 03:53:3329.10.2012 11:05:35UnknownMicron Baby stack 2 after irradiation (intermediate
strips)
HV = -100 V
  
  69   Sun Oct 28 20:07:28 2012 Markus FriedlMicronBabyrunrun03530411028.10.2012 20:01:4829.10.2012 03:50:44GoodMicron Baby stack 2 after irradiation (intermediate
strips)
HV = -100 V
  
  68   Sun Oct 28 16:22:35 2012 Christian IrmlerMicronBabyrunrun03410186428.10.2012 16:12:24 28.10.2012 18:34:24GoodMicron Baby stack 2 after irradiation (intermediate
strips)
HV = -100 V
  
  67   Sun Oct 28 15:46:07 2012 Markus FriedlMicronBabycalcal0348380028.10.2012 15:19:1028.10.2012 15:40:47GoodMicron Baby stack 2 after irradiation (intermediate
strips)
HV = -100 V
  
  66   Sun Oct 28 08:37:53 2012 Christian IrmlerMicronOrigami_grossrunrun0336693728.10.2012 08:33:4228.10.2012 14:10:43 UnknownBelle stack 2 after gamma irradiation
HV = +50V -50V
I = 101 uA
 temp_run33.JPGtemp_run33_2.JPG 
  65   Sun Oct 28 02:51:49 2012 Markus FriedlMicronOrigami_grossrunrun032150k28.10.2012 02:47:2428.10.2012 08:31:19 GoodBelle stack 2 after gamma irradiation
HV = +50V -50V
I = 101 uA
  
  64   Sat Oct 27 21:49:08 2012 Markus FriedlMicronOrigami_grossrunrun031150k27.10.2012 21:42:4628.10.2012 02:35:55 (+1h due to winter time)GoodBelle stack 2 after gamma irrdiation
HV = +50V -50 V
I = 102 uA
  
  63   Sat Oct 27 19:36:24 2012 Markus FriedlMicronOrigami_grosscalcal0318380027.10.2012 19:59:5027.10.2012 20:44:38GoodBelle stack 2 after irradiation
HV = +50V -50V
I = 112 µA
  
  62   Sat Oct 27 07:51:49 2012 Manfred ValentanMicronBabyrunrun03037667827.10.2012 07:49:0927.10.2012 17:32:07GoodAfter irradiation
xy-table: x=319.4, y=87.6
beam hits APV1
  
  61   Sat Oct 27 01:13:47 2012 Christian IrmlerMicronBabyrunrun029307k27.10.2012 01:02:4927.10.2012 07:36:34GoodAfter irradiation
xy-table: x=319.4, y=74.6
beam hits APV0
  
  60   Sat Oct 27 00:43:55 2012 Christian IrmlerMicronBabycalcal0298380027.10.2012 00:10:1527.10.2012 00:36:55GoodAfter irradiation
 
Micron baby stack after gamma irrdiation
  
  59   Wed Oct 24 17:24:40 2012 Thomas BergauerMicronOrigami_grossrun ohne Strom ;-(run028   Unknown 
Belle Stack 4: 2 DSSD -z, Origami
#3, #1, wedge new #2
  
  58   Wed Oct 24 09:51:41 2012 Thomas BergauerMicronOrigami_grosscalcal0288380024.10.2012 09:50:5324.10.2012 10:39:43Unknown Belle Stack 4: 2 DSSD -z, Origami
#3, #1, wedge new #2
HV = +-2.5V, Ibias=14.5uA
Position:
  
  57   Wed Oct 24 08:25:04 2012 Thomas BergauerMicronOrigami_grosscalcal0278380024.10.2012 08:22:2524.10.2012 09:10:19Unknown Belle Stack 4: 2 DSSD -z, Origami
#3, #1, wedge new #2
HV = +-5V, Ibias=23.5uA
Position:
  
  56   Tue Oct 23 23:12:03 2012 Thomas BergauerMicronOrigami_grossrunrun02722084723.10.2012 23:10:1424.10.2012 08:19:51Unknown Belle Stack 4: 2 DSSD -z, Origami
#3, #1, wedge new #2
HV = +-5V, Ibias=23.5uA
Position:
  
  55   Tue Oct 23 16:06:09 2012 Markus FriedlMicronOrigami_grossrunrun02610212423.10.2012 16:04:4723.10.2012 23:04:56UnknownBelle Stack 4: 2 DSSD -z, Origami #3, #1,
wedge new #2
HV = +-10V, Ibias=36uA
  
  54   Tue Oct 23 15:55:58 2012 Markus FriedlMicronOrigami_grosscalcal0268380023.10.2012 14:56:4723.10.2012 15:42:17 GoodBelle Stack 4: 2 DSSD -z, Origami #3, #1,
wedge new #2
HV = +-10V, Ibias=36uA
  
  53   Tue Oct 23 13:50:44 2012 Markus FriedlMicronOrigami_grosscalcal0258380023.10.2012 13:47:09 23.10.2012 14:35:05GoodBelle Stack 4: 2 DSSD -z, Origami #3, #1,
wedge new #2
HV = +-15V, Ibias=48uA
  
  52   Tue Oct 23 08:22:42 2012 Markus FriedlMicronOrigami_grossrunrun02510000023.10.2012 08:21:3723.10.2012 13:47:09GoodBelle Stack 4: 2 DSSD -z, Origami #3, #1,
wedge new #2
HV = +-15V, Ibias=47uA
  
  51   Mon Oct 22 19:19:53 2012 Markus FriedlMicronOrigami_grossrunrun02426000022.10.2012 19:18:1623.10.2012 08:17:20 GoodBelle Stack 4: 2 DSSD -z, Origami #3, #1,
wedge new #2
HV = +-20V, Ibias=57uA
  
  50   Mon Oct 22 10:10:16 2012 Markus FriedlMicronOrigami_grosscalcal0248380022.10.2012 10:08:5322.10.2012 10:54:18GoodBelle Stack 4: 2 DSSD -z, Origami #3, #1,
wedge new #2
HV = +-20V, Ibias=53uA
  
  49   Mon Oct 22 00:57:05 2012 Markus FriedlMicronOrigami_grossrunrun02317662922.10.2012 00:55:5922.10.2012 10:04:38GoodBelle Stack 4: 2 DSSD -z, Origami #3, #1,
wedge new #2
HV = +-25V, Ibias=65uA
  
  48   Mon Oct 22 00:08:39 2012 Markus FriedlMicronOrigami_grosscalcal0238380022.10.2012 00:07:3422.10.2012 00:53:02GoodBelle Stack 4: 2 DSSD -z, Origami #3, #1,
wedge new #2
HV = +-25V, Ibias=65uA
  
  47   Sun Oct 21 16:04:06 2012 Markus FriedlMicronOrigami_grossrunrun02215128221.10.2012 18:16:5322.10.2012 00:04:42GoodBelle Stack 4: 2 DSSD -z, Origami #3, #1,
wedge new #2
HV = +-30V, Ibias=70uA
  
  46   Sun Oct 21 15:15:45 2012 Markus FriedlMicronOrigami_grosscalcal0228380021.10.2012 15:13:4721.10.2012 16:00:25GoodBelle Stack 4: 2 DSSD -z, Origami #3, #1,
wedge new #2
HV = +-30V, Ibias=70uA
  
  45   Sun Oct 21 10:39:15 2012 Markus FriedlMicronOrigami_grossrunrun02110000021.10.2012 10:37:2621.10.2012 15:04:49GoodBelle Stack 4: 2 DSSD -z, Origami #3, #1,
wedge new #2
HV = +-35V, Ibias=69uA
  
  44   Sun Oct 21 09:50:00 2012 Markus FriedlMicronOrigami_grosscalcal0218380021.10.2012 09:50:07 21.10.2012 10:35:40GoodBelle Stack 4: 2 DSSD -z, Origami #3, #1,
wedge new #2
HV = +-35V, Ibias=69uA
  
  43   Sun Oct 21 09:01:04 2012 Markus FriedlMicronOrigami_grosscalcal0208380021.10.2012 08:59:2121.10.2012 09:45:03GoodBelle Stack 4: 2 DSSD -z, Origami #3, #1,
wedge new #2
HV = +-40V, Ibias=72uA
  
  42   Sat Oct 20 19:35:30 2012 Markus FriedlMicronOrigami_grossrunrun02030000020.10.2012 19:34:1921.10.2012 08:55:28GoodBelle Stack 4: 2 DSSD -z, Origami #3, #1,
wedge new #2
HV = +-40V, Ibias=73A
  
  41   Sat Oct 20 11:40:13 2012 Markus FriedlMicronOrigami_grossrunrun01910000020.10.2012 11:38:1920.10.2012 19:20:51GoodBelle Stack 4: 2 DSSD -z, Origami #3, #1,
wedge new #2
HV = +-45V, Ibias=72A
  
  40   Sat Oct 20 10:49:03 2012 Markus FriedlMicronOrigami_grosscalcal0198380020.10.2012 10:46:3620.10.2012 11:32:57GoodBelle Stack 4: 2 DSSD -z, Origami #3, #1,
wedge new #2
HV = +-45V, Ibias=70A
  
  39   Fri Oct 19 19:25:29 2012 Markus FriedlMicronOrigami_grossrunrun01831875619.10.2012 19:23:5520.10.2012 10:27:11GoodBelle Stack 4: 2 DSSD -z, Origami #3, #1,
wedge new #2
HV = +-50V, Ibias=77A
  
  38   Fri Oct 19 00:56:16 2012 Markus FriedlMicronOrigami_grossrunrun01719789919.10.2012 00:54:2119.10.2012 14:10:02 GoodBelle Stack 4: 2 DSSD -z, Origami #3, #1,
wedge new #2
HV = +-50V, Ibias=76A
  
  37   Fri Oct 19 00:45:52 2012 Markus FriedlMicronOrigami_grossrunrun0161185519.10.2012 00:24:0519.10.2012 00:48:24Crap 
Belle Stack 4: 2 DSSD -z, Origami
#3, #1, wedge new #2
  
  36   Thu Oct 18 09:14:07 2012 Manfred ValentancommonFahrt nach Mol    Unknown Liebe Kollegen,
wir brechen. auf. Wünscht uns
Glück!
  
  35   Wed Oct 17 21:30:39 2012 Markus FriedlMicronOrigami_grosscalcal0088380017.10.2012 17:15:1317.10.2012 18:08:11GoodInternal calibration for "stealth
parasitic" mode Belle stack; taken without
beam
 currents.pngcurrents2.png 
  34   Wed Oct 17 14:06:24 2012 Markus FriedlMicronOrigami_grossStack für stealth parasitic mode    GoodDieser Stack wird jetzt quasi als Pausenkasperl
eingebaut und läuft im "stealth
parasitic" mode während der Irradiation-Woche.
 pausenfueller1.jpgpausenfueller2.jpg 
  33   Wed Oct 17 05:16:22 2012 Christian IrmlerMicronOrigami_grossrunrun0155400517.10.2012 05:10:0617.10.2012 07:27:20UnknownOrigami Stack 2: Origami #4, #3, Wedge
new1, old
HV = +-50V
 run015_temperatures.JPG 
  32   Wed Oct 17 01:21:50 2012 Marko DragicevicInfineonrunrun009150k15.10.2012 08:20:1515.10.2012 11:01:11Unknown This run was not recorded in original
sequence in the ELOG!!!
 
  
  31   Tue Oct 16 23:35:28 2012 Christian IrmlerMicronOrigami_grossrunrun014150k16.10.2012 23:32:2417.10.2012 04:59:02 UnknownSame as run011, but now with +- 50V bias
voltage.
Origami Stack 2: Origami #4, #3,
 run014_temperatures.jpg 
  30   Tue Oct 16 23:03:09 2012 Markus FriedlcommonSozialisierung    UnknownSo steuert man einen Testbeam!
 IMAG2041.jpgfondue.jpg 
  29   Tue Oct 16 22:19:21 2012 Christian IrmlerMicronOrigami_grosscalcal0078380016.10.2012 20:25:17 16.10.2012 21:12:01 UnknownOrigami Stack 2: Origami #4, #3, Wedge
new1, old
HV = +-50V, Ibias=12.3µA
  
  28   Tue Oct 16 13:59:46 2012 Christian IrmlerMicronOrigami_grossrunrun013150k16.10.2012 13:43:0516.10.2012 20:21:04UnknownOrigami Stack 2: Origami #4, #3, Wedge
new1, old
HV = +-50V
 belle_2_temperatures.jpg 
  27   Tue Oct 16 11:23:43 2012 Christian IrmlerMicronOrigami_grossrunrun01220k16.10.2012 11:16:0116.10.2012 12:27:03 UnknownOrigami Stack 2a: Origami #4, Wedge new1
reading out all 6 APV of p-side
HV = +-40V, Ibias=10.4µA
 belle_2a_temperatures.jpg 
  26   Tue Oct 16 11:07:17 2012 Christian IrmlerMicronOrigami_grosscalcal0068380016.10.2012 10:30:3416.10.2012 11:00:51UnknownOrigami Stack 2a: Origami #4, Wedge new1
reading out all 6 APV of p-side
HV = +-40V, Ibias=5.12µA
  
  25   Tue Oct 16 05:24:21 2012 Christian IrmlerMicronOrigami_grossrun ATTENTION: wrong bias voltagerun011150k16.10.2012 05:19:28 16.10.2012 09:59:24CrapATTENTION: Bias voltage was +-100 V instead
of +- 50 V
Origami Stack 2: Origami #4, #3,
  
  24   Mon Oct 15 23:26:52 2012 Marko DragicevicMicronOrigami_grossrun ATTENTION: wrong bias voltagerun010158k15.10.2012 23:10:40 16.10.2012 05:05:35CrapATTENTION: Bias voltage was +-100 V instead
of +- 50 V
Same as run009.
  
  23   Mon Oct 15 22:13:28 2012 Marko DragicevicMicronOrigami_grosscal ATTENTION: wrong bias voltage cal0058380015.10.2012 22:16:2615.10.2012 23:07:37 UnknownATTENTION: Bias voltage was +-100 V instead
of +- 50 V
Origami Stack 2: Origami #4, #3,
  
  22   Mon Oct 15 19:40:03 2012 Marko DragicevicMicronOrigami_grossrun ATTENTION: wrong bias voltagerun0093165015.10.2012 19:28:30 15.10.2012 22:08:31 CrapATTENTION! Bias voltage was +-100 V instead
of +-50 V 
Origami Stack 2: Origami #4, #3,
  
  21   Mon Oct 15 19:21:56 2012 Marko DragiceviccommonBeam settings and profile    UnknownBeam setting file:
H6A.804: FM HAD (H8=+180, H6=120@0mrad)
PARALL IN H6A; RD42
 NetBeans_IDE_3.5_15-Oct-12_19-28-32.png 
  20   Mon Oct 15 18:52:18 2012 Marko DragicevicMicronOrigami_grossStack configuration, Belle Stack 2    UnknownBelle stack 2:
Modules:

    Origami #4
    Origami
  
  19   Mon Oct 15 00:08:26 2012 Marko DragicevicInfineonrunrun00833907515.10.2012 01:49:3315.10.2012 08:04:24Unknown Infineon Stack Version
2 (no height information, BabyStrips vertical
  
  18   Sun Oct 14 23:01:11 2012 Marko DragicevicInfineoncalcal0048380014.10.2012 21:44:0014.10.2012 21:03:00UnknownInfineon Stack Version 1 (with height information,
BabyStrips horizontal Strixel vertical)
HV = 300V   I=3.1 uA
  
  17   Sun Oct 14 20:12:14 2012 Marko DragicevicInfineonrunrun007110k14.10.2012 20:07:1214.10.2012 21:04:12UnknownInfineon Stack Version 1 (with height information,
BabyStrips horizontal Strixel vertical)
HV = 300V   I=3uA
  
  16   Sun Oct 14 09:08:42 2012 Manfred ValentanMicronBabyrunrun006300k14.10.2012 09:01:15 UnknownMicron baby intermediate stack
HV = -100V   I=6.9uA
beam on
  
  15   Sun Oct 14 08:25:10 2012 Manfred ValentanMicronBabycalcal0038380014.10.2012 08:21:4614.10.2012 08:51:58UnknownMicron baby intermediate stack
HV = -100 V
I = 6.9 uA
  
  14   Sun Oct 14 02:02:39 2012 Manfred ValentanMicronBabyrunrun005300k14.10.2012 02:00:0814.10.2012 08:17:02UnknownMicron baby intermediate stack
HV = -100V   I=6.3uA
beam on
  
  13   Sun Oct 14 02:00:12 2012 Manfred ValentanMicronBabyConfiguration of intermediate stack    UnknownMicron baby stack with every other strip
connected to APV chips
n-side faces the beam, p-side not
  
  12   Sat Oct 13 23:04:22 2012 Markus FriedlMicronOrigami_grosscalcal0028380013.10.2012 23:03:1813.10.2012 22:57:48UnknownBelle stack 3 (2-DSSD, Micron new, Micron
old)
HV = +-50V   I=10.5A 
  
  11   Sat Oct 13 23:01:54 2012 Markus FriedlMicronOrigami_grossrun with Belle stack 3run00430k13.10.2012 21:41:3413.10.2012 22:57:48UnknownBelle stack 3, other position (CE)
 
Position of xy table:
  
  10   Sat Oct 13 19:04:23 2012 Markus FriedlMicronOrigami_grossCO2 cooling    UnknownWir haben ja schon seit langem vermutet,
dass man mit reiner Gasphase nicht kühlen
kann. Jetzt erbringen wir den experimentellen
  
  9   Sat Oct 13 19:04:02 2012 Manfred ValentanMicronOrigami_grossrun with Belle stack 3run00330k13.10.2012 19:02:31 Unknown Belle stack 3: 2DSSD-Origami, Wedge_New_1,
Wedge_old
HV = +- 50V
  
  8   Sat Oct 13 14:44:47 2012 Manfred ValentanMicronOrigami_grossStack configuration, Belle Stack 3    UnknownModule in Beamrichtung:
2-DSSD Origami  -z
2-DSSD Origami ce
  
  7   Sat Oct 13 06:55:47 2012 Manfred ValentanMicronBabyrunrun00223401913.10.2012 06:50:0013.10.2012 13:50:40UnknownMicron baby stack
HV = -100V   I=5.4uA
beam on
  
  6   Fri Oct 12 23:52:57 2012 Markus FriedlcommonSozialisierung    UnknownProst, Bergi!
(Das ist nur ein Test, ob du wirklich
all die Elog-Emails liest.)
  
  5   Fri Oct 12 23:51:35 2012 Markus FriedlcommonZimmernummer & Telefonnummern    Unknown2nd week:
Markus: 38 - 420   (phone: 70
420)
  
  4   Fri Oct 12 23:10:14 2012 Christian IrmlerMicronBabyrunrun00133300012.10.2012 23:05:1913.10.2012 06:29:00GoodMicron baby stack
HV = -100V   I=5.8uA
beam on
  
  3   Fri Oct 12 22:00:52 2012 Christian IrmlerMicronBabycalcal0018380012.10.2012 21:16:3312.10.2012 21:59:02Good12.10.2012  21:16:33  event=0 
Disk space: Needed=0.00 GB, Available=206.59
GB, Total=931.51 GB
  
  2   Fri Oct 12 19:42:36 2012 Christian IrmlerMicronBabyConfiguration of normal stack    UnknownMicron baby stack with all strips connected
to APV chips
n-side faces the beam, p-side not
 micronbaby_stack_geometry.jpg 
  1   Fri Oct 12 15:04:55 2012 Marko DragiceviccommonNetwork configuration    UnknownRouter:
IP 137.138.113.230
Hostname ROUTERHEPHY.cern.ch
  