Wed Oct 31 15:54:59 2012, Christian Irmler, common, Ethernetkabel zu H6A, , , , , Unknown
|
Ethernetkabel HNA447 -> H6A:
Das obere Ende im Counting Hut liegt im Zwischenboden unterhalb der orangenen Steckdose beim Eingang mit dem elektronischen Zahlenschloß.
Das untere Ende in der Zone hängt aufgerollt an einem Pfeiler der Kabeltasse, unweit der Stelle an der das Kabel von oben hinunter gelassen |
Tue Oct 30 22:15:41 2012, Markus Friedl, MicronOrigami_gross, run, run041, 100k, 30.10.2012 22:09:13, , Unknown
|
Cooling for 2DSSD established after some struggle.
2DSSD fully read out with cooling
HV= +40 V -40 V I = 1.84 uA |
Tue Oct 30 18:35:51 2012, Christian Irmler, MicronOrigami_gross, run, run040, 100k, 30.10.2012 18:23:21, 30.10.2012 21:55:53 , Unknown
|
Cooling for 2DSSD established after some struggle.
2DSSD fully read out with cooling
HV= +40 V -40 V I = 2.1 uA |
Tue Oct 30 17:24:01 2012, Markus Friedl, MicronOrigami_gross, cal, cal040, 83800, 30.10.2012 17:20:28 , 30.10.2012 17:54:09, Unknown
|
Cooling for 2DSSD established after some struggle.
2DSSD fully read out with cooling
HV= +40 V -40 V I = 2 uA |
Tue Oct 30 11:05:32 2012, Markus Friedl, HPK_baby, run, run039, 150k, 30.10.2012 11:03:19, 30.10.2012 14:57:57, Unknown
|
HPK baby stack after irradiation - no cooling
I = 420A and growing (warming up)
positioned centered on p and n |
Tue Oct 30 10:37:19 2012, Markus Friedl, HPK_baby, cal, cal039, 83800, 30.10.2012 10:35:35 , 30.10.2012 11:02:06 , Good
|
Turned off cooling, now taking warm data
HPK baby stack after irradiation - no cooling |
Mon Oct 29 23:13:52 2012, Markus Friedl, HPK_baby, run, run038, 476500, 29.10.2012 23:13:05, 30.10.2012 10:22:54, Unknown
|
HPK baby stack after irradiation with partial cooling (HPK neutron & HPK neutron/gamma)
HV = +75 V -75V
I = 176A |
Mon Oct 29 22:36:52 2012, Markus Friedl, HPK_baby, cal, cal038, 83800, 29.10.2012 22:17:34, 29.10.2012 22:47:47, Good
|
HPK baby stack after irradiation with partial cooling (HPK neutron & HPK neutron/gamma)
HV = +75 Vm -75V
I = 226A |
Mon Oct 29 12:24:41 2012, Markus Friedl, Infineon, run, run037, 301382, 29.10.2012 12:22:22, 29.10.2012 21:05:57, Good
|
Infineon stack Version 2 after irradiation
HV = +300 V
I = 162 A |
Mon Oct 29 11:36:40 2012, Markus Friedl, Infineon, cal, cal037, 83800, 29.10.2012 11:35:12, 29.10.2012 11:58:02 , Good
|
Infineon stack Version 2 after irradiation
HV = +300 V
I = 137 A |
Mon Oct 29 04:02:16 2012, Manfred Valentan, MicronBaby, run, run036, 296294, 29.10.2012 03:53:33, 29.10.2012 11:05:35, Unknown
|
Micron Baby stack 2 after irradiation (intermediate strips)
HV = -100 V
I = 36 uA |
Sun Oct 28 20:07:28 2012, Markus Friedl, MicronBaby, run, run035, 304110, 28.10.2012 20:01:48, 29.10.2012 03:50:44, Good
|
Micron Baby stack 2 after irradiation (intermediate strips)
HV = -100 V
I = 39 uA |
Sun Oct 28 16:22:35 2012, Christian Irmler, MicronBaby, run, run034, 101864, 28.10.2012 16:12:24 , 28.10.2012 18:34:24, Good
|
Micron Baby stack 2 after irradiation (intermediate strips)
HV = -100 V
I = 36.3 uA |
Sun Oct 28 15:46:07 2012, Markus Friedl, MicronBaby, cal, cal034, 83800, 28.10.2012 15:19:10, 28.10.2012 15:40:47, Good
|
Micron Baby stack 2 after irradiation (intermediate strips)
HV = -100 V
I = 33 uA |
Sun Oct 28 08:37:53 2012, Christian Irmler, MicronOrigami_gross, run, run033, 66937, 28.10.2012 08:33:42, 28.10.2012 14:10:43 , Unknown
|
Belle stack 2 after gamma irradiation
HV = +50V -50V
I = 101 uA |
Sun Oct 28 02:51:49 2012, Markus Friedl, MicronOrigami_gross, run, run032, 150k, 28.10.2012 02:47:24, 28.10.2012 08:31:19 , Good
|
Belle stack 2 after gamma irradiation
HV = +50V -50V
I = 101 uA |
Sat Oct 27 21:49:08 2012, Markus Friedl, MicronOrigami_gross, run, run031, 150k, 27.10.2012 21:42:46, 28.10.2012 02:35:55 (+1h due to winter time), Good
|
Belle stack 2 after gamma irrdiation
HV = +50V -50 V
I = 102 uA |
Sat Oct 27 19:36:24 2012, Markus Friedl, MicronOrigami_gross, cal, cal031, 83800, 27.10.2012 19:59:50, 27.10.2012 20:44:38, Good
|
Belle stack 2 after irradiation
HV = +50V -50V
I = 112 µA |
Sat Oct 27 07:51:49 2012, Manfred Valentan, MicronBaby, run, run030, 376678, 27.10.2012 07:49:09, 27.10.2012 17:32:07, Good
|
After irradiation
xy-table: x=319.4, y=87.6
beam hits APV1 |
Sat Oct 27 01:13:47 2012, Christian Irmler, MicronBaby, run, run029, 307k, 27.10.2012 01:02:49, 27.10.2012 07:36:34, Good
|
After irradiation
xy-table: x=319.4, y=74.6
beam hits APV0 |
Sat Oct 27 00:43:55 2012, Christian Irmler, MicronBaby, cal, cal029, 83800, 27.10.2012 00:10:15, 27.10.2012 00:36:55, Good
|
After irradiation
Micron baby stack after gamma irrdiation |
Wed Oct 24 17:24:40 2012, Thomas Bergauer, MicronOrigami_gross, run ohne Strom ;-(, run028, , , , Unknown
|
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-2.5V, Ibias=14.5uA |
Wed Oct 24 09:51:41 2012, Thomas Bergauer, MicronOrigami_gross, cal, cal028, 83800, 24.10.2012 09:50:53, 24.10.2012 10:39:43, Unknown
|
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-2.5V, Ibias=14.5uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3,
wedgenew #3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1 |
Wed Oct 24 08:25:04 2012, Thomas Bergauer, MicronOrigami_gross, cal, cal027, 83800, 24.10.2012 08:22:25, 24.10.2012 09:10:19, Unknown
|
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-5V, Ibias=23.5uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew
#3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1 |
Tue Oct 23 23:12:03 2012, Thomas Bergauer, MicronOrigami_gross, run, run027, 220847, 23.10.2012 23:10:14, 24.10.2012 08:19:51, Unknown
|
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-5V, Ibias=23.5uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew
#3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1
SPS Status during whole run: Still problems with North |
Tue Oct 23 16:06:09 2012, Markus Friedl, MicronOrigami_gross, run, run026, 102124, 23.10.2012 16:04:47, 23.10.2012 23:04:56, Unknown
|
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-10V, Ibias=36uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29 |
Tue Oct 23 15:55:58 2012, Markus Friedl, MicronOrigami_gross, cal, cal026, 83800, 23.10.2012 14:56:47, 23.10.2012 15:42:17 , Good
|
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-10V, Ibias=36uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29 |
Tue Oct 23 13:50:44 2012, Markus Friedl, MicronOrigami_gross, cal, cal025, 83800, 23.10.2012 13:47:09 , 23.10.2012 14:35:05, Good
|
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-15V, Ibias=48uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29 |
Tue Oct 23 08:22:42 2012, Markus Friedl, MicronOrigami_gross, run, run025, 100000, 23.10.2012 08:21:37, 23.10.2012 13:47:09, Good
|
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-15V, Ibias=47uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29 |
Mon Oct 22 19:19:53 2012, Markus Friedl, MicronOrigami_gross, run, run024, 260000, 22.10.2012 19:18:16, 23.10.2012 08:17:20 , Good
|
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-20V, Ibias=57uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29 |
Mon Oct 22 10:10:16 2012, Markus Friedl, MicronOrigami_gross, cal, cal024, 83800, 22.10.2012 10:08:53, 22.10.2012 10:54:18, Good
|
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-20V, Ibias=53uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29 |
Mon Oct 22 00:57:05 2012, Markus Friedl, MicronOrigami_gross, run, run023, 176629, 22.10.2012 00:55:59, 22.10.2012 10:04:38, Good
|
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-25V, Ibias=65uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29 |
Mon Oct 22 00:08:39 2012, Markus Friedl, MicronOrigami_gross, cal, cal023, 83800, 22.10.2012 00:07:34, 22.10.2012 00:53:02, Good
|
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-25V, Ibias=65uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29 |
Sun Oct 21 16:04:06 2012, Markus Friedl, MicronOrigami_gross, run, run022, 151282, 21.10.2012 18:16:53, 22.10.2012 00:04:42, Good
|
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-30V, Ibias=70uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29 |
Sun Oct 21 15:15:45 2012, Markus Friedl, MicronOrigami_gross, cal, cal022, 83800, 21.10.2012 15:13:47, 21.10.2012 16:00:25, Good
|
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-30V, Ibias=70uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29 |
Sun Oct 21 10:39:15 2012, Markus Friedl, MicronOrigami_gross, run, run021, 100000, 21.10.2012 10:37:26, 21.10.2012 15:04:49, Good
|
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-35V, Ibias=69uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29 |
Sun Oct 21 09:50:00 2012, Markus Friedl, MicronOrigami_gross, cal, cal021, 83800, 21.10.2012 09:50:07 , 21.10.2012 10:35:40, Good
|
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-35V, Ibias=69uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29 |
Sun Oct 21 09:01:04 2012, Markus Friedl, MicronOrigami_gross, cal, cal020, 83800, 21.10.2012 08:59:21, 21.10.2012 09:45:03, Good
|
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-40V, Ibias=72uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29 |
Sat Oct 20 19:35:30 2012, Markus Friedl, MicronOrigami_gross, run, run020, 300000, 20.10.2012 19:34:19, 21.10.2012 08:55:28, Good
|
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-40V, Ibias=73A
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29 |
Sat Oct 20 11:40:13 2012, Markus Friedl, MicronOrigami_gross, run, run019, 100000, 20.10.2012 11:38:19, 20.10.2012 19:20:51, Good
|
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-45V, Ibias=72A
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29 |
Sat Oct 20 10:49:03 2012, Markus Friedl, MicronOrigami_gross, cal, cal019, 83800, 20.10.2012 10:46:36, 20.10.2012 11:32:57, Good
|
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-45V, Ibias=70A
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29 |
Fri Oct 19 19:25:29 2012, Markus Friedl, MicronOrigami_gross, run, run018, 318756, 19.10.2012 19:23:55, 20.10.2012 10:27:11, Good
|
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-50V, Ibias=77A
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29 |
Fri Oct 19 00:56:16 2012, Markus Friedl, MicronOrigami_gross, run, run017, 197899, 19.10.2012 00:54:21, 19.10.2012 14:10:02 , Good
|
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-50V, Ibias=76A
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29 |
Fri Oct 19 00:45:52 2012, Markus Friedl, MicronOrigami_gross, run, run016, 11855, 19.10.2012 00:24:05, 19.10.2012 00:48:24, Crap
|
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-50V, Ibias=77A |
Thu Oct 18 09:14:07 2012, Manfred Valentan, common, Fahrt nach Mol, , , , , Unknown
|
Liebe Kollegen,
wir brechen. auf. Wünscht uns Glück! |
Wed Oct 17 21:30:39 2012, Markus Friedl, MicronOrigami_gross, cal, cal008, 83800, 17.10.2012 17:15:13, 17.10.2012 18:08:11, Good
|
Internal calibration for "stealth parasitic" mode Belle stack; taken without beam
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2 |
Wed Oct 17 14:06:24 2012, Markus Friedl, MicronOrigami_gross, Stack für stealth parasitic mode, , , , , Good
|
Dieser Stack wird jetzt quasi als Pausenkasperl eingebaut und läuft im "stealth parasitic" mode während der Irradiation-Woche. Gut,
dass wir alles auch von Wien aus fernsteuern können :-)
|
Wed Oct 17 05:16:22 2012, Christian Irmler, MicronOrigami_gross, run, run015, 54005, 17.10.2012 05:10:06, 17.10.2012 07:27:20, Unknown
|
Origami Stack 2: Origami #4, #3, Wedge new1, old
HV = +-50V
Ibias=4.43µA |
Wed Oct 17 01:21:50 2012, Marko Dragicevic, Infineon, run, run009, 150k, 15.10.2012 08:20:15, 15.10.2012 11:01:11, Unknown
|
This run was not recorded in original sequence in the ELOG!!!
|
Tue Oct 16 23:35:28 2012, Christian Irmler, MicronOrigami_gross, run, run014, 150k, 16.10.2012 23:32:24, 17.10.2012 04:59:02 , Unknown
|
Same as run011, but now with +- 50V bias voltage.
Origami Stack 2: Origami #4, #3, Wedge new1, old
HV = +-10V |
Tue Oct 16 23:03:09 2012, Markus Friedl, common, Sozialisierung, , , , , Unknown
|
So steuert man einen Testbeam!
|
Tue Oct 16 22:19:21 2012, Christian Irmler, MicronOrigami_gross, cal, cal007, 83800, 16.10.2012 20:25:17 , 16.10.2012 21:12:01 , Unknown
|
Origami Stack 2: Origami #4, #3, Wedge new1, old
HV = +-50V, Ibias=12.3µA
Position: verticallbtween APV 1&2 of 6, left side of sensor, |
Tue Oct 16 13:59:46 2012, Christian Irmler, MicronOrigami_gross, run, run013, 150k, 16.10.2012 13:43:05, 16.10.2012 20:21:04, Unknown
|
Origami Stack 2: Origami #4, #3, Wedge new1, old
HV = +-50V
Ibias=5.2µA |
Tue Oct 16 11:23:43 2012, Christian Irmler, MicronOrigami_gross, run, run012, 20k, 16.10.2012 11:16:01, 16.10.2012 12:27:03 , Unknown
|
Origami Stack 2a: Origami #4, Wedge new1
reading out all 6 APV of p-side
HV = +-40V, Ibias=10.4µA |
Tue Oct 16 11:07:17 2012, Christian Irmler, MicronOrigami_gross, cal, cal006, 83800, 16.10.2012 10:30:34, 16.10.2012 11:00:51, Unknown
|
Origami Stack 2a: Origami #4, Wedge new1
reading out all 6 APV of p-side
HV = +-40V, Ibias=5.12µA |
Tue Oct 16 05:24:21 2012, Christian Irmler, MicronOrigami_gross, run ATTENTION: wrong bias voltage, run011, 150k, 16.10.2012 05:19:28 , 16.10.2012 09:59:24, Crap
|
ATTENTION: Bias voltage was +-100 V instead of +- 50 V
Origami Stack 2: Origami #4, #3, Wedge new1, old
HV = +-100V |
Mon Oct 15 23:26:52 2012, Marko Dragicevic, MicronOrigami_gross, run ATTENTION: wrong bias voltage, run010, 158k, 15.10.2012 23:10:40 , 16.10.2012 05:05:35, Crap
|
ATTENTION: Bias voltage was +-100 V instead of +- 50 V
Same as run009.
Origami Stack 2: Origami #4, #3, Wedge new1, old |
Mon Oct 15 22:13:28 2012, Marko Dragicevic, MicronOrigami_gross, cal ATTENTION: wrong bias voltage , cal005, 83800, 15.10.2012 22:16:26, 15.10.2012 23:07:37 , Unknown
|
ATTENTION: Bias voltage was +-100 V instead of +- 50 V
Origami Stack 2: Origami #4, #3, Wedge new1, old
HV = +-100V |
Mon Oct 15 19:40:03 2012, Marko Dragicevic, MicronOrigami_gross, run ATTENTION: wrong bias voltage, run009, 31650, 15.10.2012 19:28:30 , 15.10.2012 22:08:31 , Crap
|
ATTENTION! Bias voltage was +-100 V instead of +-50 V
Origami Stack 2: Origami #4, #3, Wedge new1, old
HV = +-100V |
Mon Oct 15 19:21:56 2012, Marko Dragicevic, common, Beam settings and profile, , , , , Unknown
|
Beam setting file:
H6A.804: FM HAD (H8=+180, H6=120@0mrad) PARALL IN H6A; RD42
Kommentar (Marko): |
Mon Oct 15 18:52:18 2012, Marko Dragicevic, MicronOrigami_gross, Stack configuration, Belle Stack 2, , , , , Unknown
|
Belle stack 2:
Modules:
Origami #4
Origami #3
Wedge new 1
Wedge old
n-Seite: Beam abgewand |
Mon Oct 15 00:08:26 2012, Marko Dragicevic, Infineon, run, run008, 339075, 15.10.2012 01:49:33, 15.10.2012 08:04:24, Unknown
|
Infineon Stack Version 2 (no height information, BabyStrips vertical Strixel vertical)
HV = 300V I=4uA
beam on |
Sun Oct 14 23:01:11 2012, Marko Dragicevic, Infineon, cal, cal004, 83800, 14.10.2012 21:44:00, 14.10.2012 21:03:00, Unknown
|
Infineon Stack Version 1 (with height information, BabyStrips horizontal Strixel vertical)
HV = 300V I=3.1 uA |
Sun Oct 14 20:12:14 2012, Marko Dragicevic, Infineon, run, run007, 110k, 14.10.2012 20:07:12, 14.10.2012 21:04:12, Unknown
|
Infineon Stack Version 1 (with height information, BabyStrips horizontal Strixel vertical)
HV = 300V I=3uA
beam on |
Sun Oct 14 09:08:42 2012, Manfred Valentan, MicronBaby, run, run006, 300k, 14.10.2012 09:01:15, , Unknown
|
Micron baby intermediate stack
HV = -100V I=6.9uA
beam on |
Sun Oct 14 08:25:10 2012, Manfred Valentan, MicronBaby, cal, cal003, 83800, 14.10.2012 08:21:46, 14.10.2012 08:51:58, Unknown
|
Micron baby intermediate stack
HV = -100 V
I = 6.9 uA |
Sun Oct 14 02:02:39 2012, Manfred Valentan, MicronBaby, run, run005, 300k, 14.10.2012 02:00:08, 14.10.2012 08:17:02, Unknown
|
Micron baby intermediate stack
HV = -100V I=6.3uA
beam on |
Sun Oct 14 02:00:12 2012, Manfred Valentan, MicronBaby, Configuration of intermediate stack, , , , , Unknown
|
Micron baby stack with every other strip connected to APV chips
n-side faces the beam, p-side not read out.
Channels counting from bottom to top |
Sat Oct 13 23:04:22 2012, Markus Friedl, MicronOrigami_gross, cal, cal002, 83800, 13.10.2012 23:03:18, 13.10.2012 22:57:48, Unknown
|
Belle stack 3 (2-DSSD, Micron new, Micron old)
HV = +-50V I=10.5A
beam on CE sensor |
Sat Oct 13 23:01:54 2012, Markus Friedl, MicronOrigami_gross, run with Belle stack 3, run004, 30k, 13.10.2012 21:41:34, 13.10.2012 22:57:48, Unknown
|
Belle stack 3, other position (CE)
Position of xy table: |
Sat Oct 13 19:04:23 2012, Markus Friedl, MicronOrigami_gross, CO2 cooling, , , , , Unknown
|
Wir haben ja schon seit langem vermutet, dass man mit reiner Gasphase nicht kühlen kann. Jetzt erbringen wir den experimentellen Beweis dafür.
Expandierendes Gas kühlt zwar auch, aber nicht so tief runter und vor allem sind beträchtliche Temperaturdifferenzen zwischen den einzelnen
Modulen zu beobachten. Das erste Origami bekommt etwa -13°C aber bis zum letzten Micron sind wir auf Raumtemperatur. |
Sat Oct 13 19:04:02 2012, Manfred Valentan, MicronOrigami_gross, run with Belle stack 3, run003, 30k, 13.10.2012 19:02:31, , Unknown
|
Belle stack 3: 2DSSD-Origami, Wedge_New_1, Wedge_old
HV = +- 50V
I_ges = 11.6 µA |
Sat Oct 13 14:44:47 2012, Manfred Valentan, MicronOrigami_gross, Stack configuration, Belle Stack 3, , , , , Unknown
|
Module in Beamrichtung:
2-DSSD Origami -z
2-DSSD Origami ce |
Sat Oct 13 06:55:47 2012, Manfred Valentan, MicronBaby, run, run002, 234019, 13.10.2012 06:50:00, 13.10.2012 13:50:40, Unknown
|
Micron baby stack
HV = -100V I=5.4uA
beam on |
Fri Oct 12 23:52:57 2012, Markus Friedl, common, Sozialisierung, , , , , Unknown
|
Prost, Bergi!
(Das ist nur ein Test, ob du wirklich all die Elog-Emails liest.) |
Fri Oct 12 23:51:35 2012, Markus Friedl, common, Zimmernummer & Telefonnummern, , , , , Unknown
|
2nd week:
Markus: 38 - 420 (phone: 70 420)
Thomas: 38 - 431 (phone: 70 431) |
Fri Oct 12 23:10:14 2012, Christian Irmler, MicronBaby, run, run001, 333000, 12.10.2012 23:05:19, 13.10.2012 06:29:00, Good
|
Micron baby stack
HV = -100V I=5.8uA
beam on |
Fri Oct 12 22:00:52 2012, Christian Irmler, MicronBaby, cal, cal001, 83800, 12.10.2012 21:16:33, 12.10.2012 21:59:02, Good
|
12.10.2012 21:16:33 event=0 Disk space: Needed=0.00 GB, Available=206.59 GB, Total=931.51 GB
12.10.2012 21:16:33 event=0 DAQ start (mode: Calibration Scan)
12.10.2012 21:16:33 event=0 Init NECO... done |
Fri Oct 12 19:42:36 2012, Christian Irmler, MicronBaby, Configuration of normal stack, , , , , Unknown
|
Micron baby stack with all strips connected to APV chips
n-side faces the beam, p-side not read out.
Channels counting from bottom to top |
Fri Oct 12 15:04:55 2012, Marko Dragicevic, common, Network configuration, , , , , Unknown
|
Router:
IP 137.138.113.230
Hostname ROUTERHEPHY.cern.ch |
|